IMO, the Hull service should be a fast service between Manchester and Leeds and replace between these points one of the existing fast TPE services that runs to Newcastle; I would also axe the extension to Edinburgh. This does not increase the number of passenger trains via Standedge over that which is proposed. There would be, in addition to 2 stopping services, 4 TPE services via Standedge, e.g.
- Liverpool-Newcastle and Liverpool-Middlesbrough, each 1 tph run by bimodes, calling only at Victoria and Huddersfield between Liverpool and Leeds
- Manchester-Scarborough and Manchester-Hull, each 1 tph run by dmus, calling at Stalybridge/Huddersfield/Dewsbury between Manchester and Leeds
This is not radically different from the proposals in the consultation, and I would not be particularly concerned about swapping the eastern termini around, although it would be best if a direct link is preserved between Liverpool and Newcastle.
I welcome the MRTF proposals as a step forward, and of the 3 options proposed in this consultation, I prefer option C, as it seems simpler and more resilient overall. However, I have concerns (as mentioned in earlier posts) about:
- using the Castlefield line for TPE Standedge long-distance trains, and also for the long-distance WCML services from Lancaster and beyond, as this is likely to continue to cause serious adverse effects on the reliability of the network as a whole. I would prefer the TPE trains starting at Manchester to depart from Piccadilly platforms 1-4, but the MRTF proposes that they continue to use the Ordsall curve and run to the Airport.
- some of the changes proposed to services on the south side of Manchester, in particular running all the Crewe stoppers via the Airport, and diverting the North Wales service via Altrincham, however personally useful that might be, because it makes these services slower, less resilient and less useful.