py_megapixel
Established Member
If Scotland wanted a fleet of 100mph 25kV EMUs with doors at thirds and end gangways, and had selected Siemens (which was evidently the case, otherwise such a fleet would not have been built), then why would they not order 350s?
By that point, the 350 was already a proven design and they're among most reliable units in the country - I don't understand what the point would be in spending money to reinvent the wheel and create a new design when they could have simply ordered a 350 but with the interior to Scotrail spec (which wouldn't have been a huge difference anyway).
By that point, the 350 was already a proven design and they're among most reliable units in the country - I don't understand what the point would be in spending money to reinvent the wheel and create a new design when they could have simply ordered a 350 but with the interior to Scotrail spec (which wouldn't have been a huge difference anyway).