Has it been proposed to upgrade from two aspect signalling to three or four ?
There are long sections on a busy line with some sections covering two stations ! Thus long waits if for instance held on the down before Burseldon for a stopper as the next stop signal is the end of Swanwick platform...
Speeds are slow too especially St Denys to Woolston. I guess a bridge at Woolston would be impossible.
70 is the highest speed but on the down on the climb to Swanwick you won't get near that till over the bank.
There are long sections on a busy line with some sections covering two stations ! Thus long waits if for instance held on the down before Burseldon for a stopper as the next stop signal is the end of Swanwick platform...
Speeds are slow too especially St Denys to Woolston. I guess a bridge at Woolston would be impossible.
70 is the highest speed but on the down on the climb to Swanwick you won't get near that till over the bank.