That's about the same position as shown on the interactive map.There is an indicative layout of the Phase 2b connection here: https://assets.publishing.service.g...ta/file/629106/C321-MMD-RT-DPP-130-591706.pdf
This is sadly about as much detail as we currently have on the connection - if it even goes ahead according to the latest doom-monger mill.
But the limit of the HS2 junction seems to be further north than the "beside the airbase" quote, even though that is itself quite vague.Not if it ends North of Church Fenton as indicated. Pan up/down has to be North of the ladder. It must surely now be a NR "no regrets" scheme!
A new track layout may also indicate thinking towards capacity increases.
There is talk (not least further up this thread) of NPR using this connection too, heading towards Leeds instead of turning south. If the section became NPR only, then the grade separated junction would be unnecessary and the Leeds lines simply connected to the new line, leaving a two-track railway between the new divergence and Church Fenton station. This divergence might be in the same place as the apparent end of the current electrification work.Not for another 20 years (at current rate of progress), no!
The new line would then connect back to the old one near the A162 crossing or via a new link to the vicinity of Cross Gates as suggested above. Stopping trains would then pass the new junction on the Normanton lines and cross to the existing Leeds lines where they re-started around Church Fenton station. Church Fenton, Micklefield, East Garforth and Garforth would then be on a loop, allowing fast trains to overtake the slow ones. Where the Leeds link diverged from the HS2 alignment, provision could be made for a grade separated junction to be added if HS2 was built later.