The Severn Tunnel water penetration is something which, in the old story, was long addressed by the old GWR but later allowed to let go, as described above "allowed to degrade over decades". The GWR actually installed IBS in the tunnel (known as "the traffic lights"), two of them each way, in WW2, which with track circuits and electric controls would never have worked if it was, as envisaged above, endemically wet. They needed to be notably reliable on the steep gradients with unfitted freight trains and pilot locos on the front, not back, to allow multiple trains in the tunnel at IBS spacing. They were taken out by BR, and then in the 1990s replaced by axle counters. Which latter led directly to the Severn Tunnel collision.
In addition to pumping the Big Spring, the Sudbrook pumping station also pumps from the sump at the bottom of the tunnel and from various intermediate points. It's the collection arrangements for the pipe inlets that are an issue. yes water streams down the sidewalls but it is the collection arrangements that have needed attention. One hopes the OHLE job has addressed this back to the old standard as well as the wiring installation.
If I'm not mistaken Balcombe Tunnel on the Brighton line is another "very wet" one. 3rd rail electrified for the last 90 years of course.
In addition to pumping the Big Spring, the Sudbrook pumping station also pumps from the sump at the bottom of the tunnel and from various intermediate points. It's the collection arrangements for the pipe inlets that are an issue. yes water streams down the sidewalls but it is the collection arrangements that have needed attention. One hopes the OHLE job has addressed this back to the old standard as well as the wiring installation.
If I'm not mistaken Balcombe Tunnel on the Brighton line is another "very wet" one. 3rd rail electrified for the last 90 years of course.