Good thought. I was assuming that there would be capacity issues at SheffieldNot sure if underground platforms are necessary, but if they are they'd probably be at a similar elevation to the existing ones, but further east and buried in the hill.
Good thought. I was assuming that there would be capacity issues at SheffieldNot sure if underground platforms are necessary, but if they are they'd probably be at a similar elevation to the existing ones, but further east and buried in the hill.
That would be an impressive timing, quicker than I would have expected.
According to the report, Birmingham - Nottingham will be 27 mins.
Add 3 mins for a Nottingham call, 15 minutes to Newark (upgraded route), 45mins Newark to York with a stop at Doncaster (today’s LNER timings), QED.
The elephant in the room would be capacity on the ECML north of Newark, and particularly through Doncaster.
The line from Nottingham to Newark looks fairly straight and feasible for upgrading to higher speeds but it also level crossing heavy, with one at every station on the route, some like Carlton which are in built up areas and don't look feasible for bridging. Moreover, what would happen with the intermediate stations?15 minutes to Newark (upgraded route)
Terminating at York would make sense, but it would be better to be a semi-fast with more intermediate stops.That would be an impressive timing, quicker than I would have expected.
It could be the fast Birmingham-Newcastle service with a slower one following largely the existing route but accelerated by using HS2 between Birmingham and EM Parkway and whatever happens between Sheffield and Leeds. One or other could terminate at York depending on demand.
A Birmingham-Nottingham-York (-NE) would be much more useful than that if as fast as suggested above. The paths are there to run it as a 200m if London-NE services stay on the ECML (and freight runs via Lincoln to release capacity via Newark). You could probably re-engineer Nottingham to take a 400m train.
It`s more than fairly straight, I would say almost it`s dead straight. I understand there are plans under the Midland Connect to upgrade to 90 mph. I presume that`s between Carlton and the approach to Newark. There would be a lot of time lost between Nottingham and Carlton though as it stands at present.The line from Nottingham to Newark looks fairly straight and feasible for upgrading to higher speeds but it also level crossing heavy, with one at every station on the route, some like Carlton which are in built up areas and don't look feasible for bridging. Moreover, what would happen with the intermediate stations?
I assume a chord would be built just west of Newark where the line curves into Newark, broadly from Rolleston to north of South Muskham
I'm not disagreeing with you, just hadn't thought about it before and surprised it was so quick.According to the report, Birmingham - Nottingham will be 27 mins.
Add 3 mins for a Nottingham call, 15 minutes to Newark (upgraded route), 45mins Newark to York with a stop at Doncaster (today’s LNER timings), QED.
The elephant in the room would be capacity on the ECML north of Newark, and particularly through Doncaster.
What intermediate stops would it make?Terminating at York would make sense, but it would be better to be a semi-fast with more intermediate stops.
Any plan to build underground towards Park Hill will meet a lot of opposition, especially as there is already a daft plan to relocate the inner ring road to where the tram tracks are. Already the residents are sourcing Great Crested NewtsGood thought. I was assuming that there would be capacity issues at Sheffield
The line from Nottingham to Newark looks fairly straight and feasible for upgrading to higher speeds but it also level crossing heavy, with one at every station on the route, some like Carlton which are in built up areas and don't look feasible for bridging. Moreover, what would happen with the intermediate stations?
I assume a chord would be built just west of Newark where the line curves into Newark, broadly from Rolleston to north of South Muskham
It`s more than fairly straight, I would say almost it`s dead straight. I understand there are plans under the Midland Connect to upgrade to 90 mph. I presume that`s between Carlton and the approach to Newark. There would be a lot of time lost between Nottingham and Carlton though as it stands at present.
Would 90 mph be enough ? T
I'm not disagreeing with you, just hadn't thought about it before and surprised it was so quick.
I see no viable future for the SW/NE cross country services, as we know them today, if the regions 25%+ option or the basic upgrade option is taken. Timings between Birmingham & Leeds via Manchester will superior to the route vis Sheffield by up to 40 minutes, including a 5 min reversal at Piccadilly (I’m sure some people will pick bones with my 5 min assumption there, but that would be missing the point of the huge time advantage Manchester has over Sheffield).
I see no viable future for the SW/NE cross country services, as we know them today, if the regions 25%+ option or the basic upgrade option is taken.
Oh they’ll stay, maybe on a lower frequency, back dup with more regional services. Remember Cross Country isn’t all about flows between the big cities, it isn’t even mostly about that. The typical cross country journey is a 20-50 mile town to city or town to town trip.
I don’t think the service should take up space on the HS2 track. It would not need more than a 4-car train. Start at New Street, calling at all stops currently frequented by XC but make it all regular stopping patterns, including Tamworth, Burton, go to Sheffield, Doncaster and Leeds on the way to York. That route would not be on a par with Brum-Manc-Leeds-York-Newcastle.What intermediate stops would it make?
It would be on HS2 from Birmingham to Trent with no stops except perhaps EM Parkway if they build HS platforms there. Apart from Nottingham there's nowhere significant enough to stop between there and Newark. I agree the curve would start somewhere near Rolleston, some five miles of new construction but anything shorter would be slower and would involve crossing the Trent twice. If so it would miss Newark. That leaves only Retford and Doncaster between there and York. So this probably steers it to being the fast service between the West Midlands and the North East, or could maybe run to Leeds instead, with other trains taking the existing route to serve Derby, Sheffield, Wakefield and Leeds.
I agree ECML capacity would be a concern, but running freight via Sleaford would help and there would also be the unspecified journey time upgrades that might improve capacity too. There would probably be a London-Lincoln train every two hours or maybe even hourly, and a train joining the ECML north of Newark might be able to drop into the "empty" path.
To pick up a previous point, I think Nottingham station could take 400m trains by extending a couple of platforms (probably 5 and 6) right to the London Road bridge. Other platforms could connect to a single track to the north of this, that would join back in on the eastern side.
By up to 40 minutes? Well, assuming that you are arriving on a XC into Birmingham.. for that 40 minutes, you can spend 20 minutes walking to Curzon St. And then "up to" 20 minutes waiting for your connection... Don't mind me, I will stay on the XC.. and be able to get out at Derby, Sheffield or Wakefield.]
Are we talking about the same service here? I was proposing a Curzon-Nottingham-York via new curve at Newark, using HS2 between Curzon and East Midlands Parkway. There has also been a mention of a Curzon-Manchester-Leeds via HS2 and NPR, either of which could be a fast service between Birmingham and the North East.I don’t think the service should take up space on the HS2 track. It would not need more than a 4-car train. Start at New Street, calling at all stops currently frequented by XC but make it all regular stopping patterns, including Tamworth, Burton, go to Sheffield, Doncaster and Leeds on the way to York. That route would not be on a par with Brum-Manc-Leeds-York-Newcastle.
Are we talking about the same service here? I was proposing a Curzon-Nottingham-York via new curve at Newark, using HS2 between Curzon and East Midlands Parkway. There has also been a mention of a Curzon-Manchester-Leeds via HS2 and NPR, either of which could be a fast service between Birmingham and the North East.
There could also be a Curzon-Sheffield-Leeds which could use HS2 out of Birmingham then from EM Parkway either via Derby or via Erewash Valley. This replicates the existing service apart from Burton and Tamworth, which aren't really long-distance stops and could probably be served by another service from New Street via the existing route, with northward connections at Nottingham, Derby or Sheffield.
The snag in all this is that the fast trains have to use HS2 out of Birmingham (the ones I have noted as Curzon) so these have to start/finish there as there is no link to the lines onwards towards Reading or Bristol. So journeys such as Bristol-Leeds would have to stay on the existing route or require a change of station in Birmingham (although I agree it's nowhere near 20min walk and could be reduced if they used Moor Street instead of New Street). Not including provision for such a connection, probably between Washwood Heath and Water Orton, is starting to look like a serious mistake.
I think it's more about making the best use of the number of paths that are there. Assuming for this post that the eastern leg is descoped, there's no point in running London-NE trains that way because the ECML will still be faster, so there will be empty paths on whatever part of the eastern leg is actually built. If the ECML is upgraded then this remains true in the long term even if the eastern leg is eventually completed. So there are opportunities to use those paths for other things, such as London-Nottingham.We are talking about the same market, but a different way to service that market. Curzon Street has a planned capacity of 5 tph along the eastern branch, therefore if the eastern branch was to go and there was just a branch towards East Midlands Parkway (EMP), what would become of those paths? It may well be equitable for passengers from Doncaster, Chesterfield, Derby, Burton to still have a XC type service in to Leeds, Sheffield & Birmingham, but north of York (or even Leeds) I doubt this would be required as much as it is now. I see a case for linking Newcastl & Edinburgh with Sheffield. However, is it not better to have these trains running in to New Street and keep Curzon Street free for services that will be utilising HS2 more intensively?
There are plans for 6 tph from Leeds to Manchester, of which 2 could continue to Birmingham. This would be in addition to the 2 tph Manc-Brum HS2 services. With the remaining 3 paths, would a Liverpool service or additional Glasgow/Edinburgh services not be a better option than running a train to York which would mostly be on the existing network?
There are plans for 6 tph from Leeds to Manchester, of which 2 could continue to Birmingham. This would be in addition to the 2 tph Manc-Brum HS2 services. With the remaining 3 paths, would a Liverpool service or additional Glasgow/Edinburgh services not be a better option than running a train to York which would mostly be on the existing network?
Which begs the further question: is there really an economic justification for building just the stub of the eastern leg to the E Midlands, as opposed to upgrading the existing line via Burton per the baseline package? Or is this essentially a political bone thrown to the E and W Midlands, to try to buy them off from joining Yorkshire and the NE in fighting the axing of the eastern leg?If not used for something like this, even if they spend some or most of their time on conventional tracks, then the paths between Curzon and EM Parkway are essentially wasted.
Difficult to answer that except to note that the report found the packages focusing on regional links looked to have more benefits than the ones focusing on building the eastern leg. The Birmingham-Derby line does need more commuter services especially at the Birmingham end, and taking the fastest trains off it would help with that. And the CrossCountry route is relatively slow and gains the most proportionately in journey time from the full Y network, whereas London to Leeds and the NE are among the route with the least time benefit. So in that sense it may make sense to focus on regional links such as East-West Midlands and Sheffield to Leeds, which also benefit the Cross Country route.Which begs the further question: is there really an economic justification for building just the stub of the eastern leg to the E Midlands, as opposed to upgrading the existing line via Burton per the baseline package? Or is this essentially a political bone thrown to the E and W Midlands, to try to buy them off from joining Yorkshire and the NE in fighting the axing of the eastern leg?
After all, the biggest passenger flows on the original eastern leg would have been been Leeds and Newcastle to London.
Reinstatement of EMR services to Burton would probably be a quick win, and give Burton a much better timetable.Difficult to answer that except to note that the report found the packages focusing on regional links looked to have more benefits than the ones focusing on building the eastern leg. The Birmingham-Derby line does need more commuter services especially at the Birmingham end, and taking the fastest trains off it would help with that. And the CrossCountry route is relatively slow and gains the most proportionately in journey time from the full Y network, whereas London to Leeds and the NE are among the route with the least time benefit. So in that sense it may make sense to focus on regional links such as East-West Midlands and Sheffield to Leeds, which also benefit the Cross Country route.
South Liverpool Parkway has 311 FREE parking spaces, not exactly small, but I agree insufficient
Tiverton Parkway a ‘genuine’ Parkway station with 229 parking spaces with a daily charge of £6.90
Perhaps a similar fee at South Liverpool Parkway would significantly reduce demand? I am not advocating it though, as I oppose punitive parking fees for rail users at stations. Absolute maximum at any rail station for rail users should be £5 and free after 1400hrs.
Which begs the further question: is there really an economic justification for building just the stub of the eastern leg to the E Midlands, as opposed to upgrading the existing line via Burton per the baseline package? Or is this essentially a political bone thrown to the E and W Midlands, to try to buy them off from joining Yorkshire and the NE in fighting the axing of the eastern leg?
After all, the biggest passenger flows on the original eastern leg would have been been Leeds and Newcastle to London.
Difficult to answer that except to note that the report found the packages focusing on regional links looked to have more benefits than the ones focusing on building the eastern leg. The Birmingham-Derby line does need more commuter services especially at the Birmingham end, and taking the fastest trains off it would help with that. And the CrossCountry route is relatively slow and gains the most proportionately in journey time from the full Y network, whereas London to Leeds and the NE are among the route with the least time benefit. So in that sense it may make sense to focus on regional links such as East-West Midlands and Sheffield to Leeds, which also benefit the Cross Country route.
Which begs the further question: is there really an economic justification for building just the stub of the eastern leg to the E Midlands, as opposed to upgrading the existing line via Burton per the baseline package? Or is this essentially a political bone thrown to the E and W Midlands, to try to buy them off from joining Yorkshire and the NE in fighting the axing of the eastern leg?
After all, the biggest passenger flows on the original eastern leg would have been been Leeds and Newcastle to London.
Yes, from comparing Figs A.3 and 8.3 I can see that the report claims a London to Nottingham journey time of 58 minutes via HS2, versus 109 minutes via the MML, i.e. a 51 minute saving. But, puzzlingly, the journey time from London to Sheffield is only claimed to be reduced by 15 minutes, from 119 minutes (baseline package) to 104 minutes (regional "+25%" package). Surely the saving from using HS2 instead of the MML should be the same for both destinations?Look at the potential journey time savings and additional capacity to Nottingham, from London and Birmingham, neither of whichever could be delivered through upgrading the existing line through Burton, and you have your answer.
The baseline via MML figures looks to be wrong. Current hourly off-peak London-Nottingham service takes about 100min, Sheffield about 127min.Yes, from comparing Figs A.3 and 8.3 I can see that the report claims a London to Nottingham journey time of 58 minutes via HS2, versus 109 minutes via the MML, i.e. a 51 minute saving. But, puzzlingly, the journey time from London to Sheffield is only claimed to be reduced by 15 minutes, from 119 minutes (baseline package) to 104 minutes (regional "+25%" package). Surely the saving from using HS2 instead of the MML should be the same for both destinations?
Birmingham to Sheffield flows are apparently not considered important enough to include in the tables.
The text of Annex B highlights only the reduction in the Birmingham to Nottingham journey time, from 72 minutes to 27 minutes, as a direct benefit of the HS2 spur to East Midlands Parkway.
Nottingham is the city of my birth and I am sure it would benefit greatly from faster and more frequent services to Birmingham and London. But in the previous HS2 plans, Nottingham was not considered important enough to receive direct services from either city. Is it really the best use of scarce railway investment funds to build a new high speed spur from Birmingham to EMP?
Given that nearly all EMR long-distance services to Derby are now (not including Covid changes) scheduled to continue to Sheffield which services did you have in mind?Reinstatement of EMR services to Burton would probably be a quick win, and give Burton a much better timetable.
Yes, from comparing Figs A.3 and 8.3 I can see that the report claims a London to Nottingham journey time of 58 minutes via HS2, versus 109 minutes via the MML, i.e. a 51 minute saving. But, puzzlingly, the journey time from London to Sheffield is only claimed to be reduced by 15 minutes, from 119 minutes (baseline package) to 104 minutes (regional "+25%" package). Surely the saving from using HS2 instead of the MML should be the same for both destinations?
Birmingham to Sheffield flows are apparently not considered important enough to include in the tables.
The text of Annex B highlights only the reduction in the Birmingham to Nottingham journey time, from 72 minutes to 27 minutes, as a direct benefit of the HS2 spur to East Midlands Parkway.
Nottingham is the city of my birth and I am sure it would benefit greatly from faster and more frequent services to Birmingham and London. But in the previous HS2 plans, Nottingham was not considered important enough to receive direct services from either city. Is it really the best use of scarce railway investment funds to build a new high speed spur from Birmingham to EMP?
The report gives the current London to Sheffield time as 132 minutes. 119 minutes via the MML is after MML upgrades between Derby and Sheffield, which are in both the baseline and the regional +25% packages. So, comparing apples with apples, it is saying that switching to HS2 saves 15 minutes - 119 to 104.The baseline via MML figures looks to be wrong. Current hourly off-peak London-Nottingham service takes about 100min, Sheffield about 127min.
I know that for some people it is never very popular to miss out Derby, but wouldn’t the Erewash Valley Line a faster route to Sheffield if HS2 is to end at East Midlands Parkway?The report gives the current London to Sheffield time as 132 minutes. 119 minutes via the MML is after MML upgrades between Derby and Sheffield, which are in both the baseline and the regional +25% packages. So, comparing apples with apples, it is saying that switching to HS2 saves 15 minutes - 119 to 104.
But it says that switching London - Nottingham services to HS2 saves 51 minutes - 109 to 58 (or still 42 minutes if we use your figure of 100 for the baseline).
One or other of the via HS2 times must be badly wrong.
The Erewash Valley is mostly fairly straight but it does have restrictive curves roughly evenly spaced along the route: crossing the canal at Ilkeston, passing onto viaduct at Codnor Park and joining the Derby line at the former Clay Cross Junction. All of these would be very difficult to straighten out. Without going to check, these are either restricted now or would prevent much increase in the line speed. So while the rest of the line is fairly straight, braking and accelerating for these sections is going to prevent really high speeds being achieved. This is part of my reason for suggesting the trains via Sheffield continue to use the Derby route, with faster alternatives for journeys like Birmingham-Leeds.I know that for some people it is never very popular to miss out Derby, but wouldn’t the Erewash Valley Line a faster route to Sheffield if HS2 is to end at East Midlands Parkway?
The Erewash Valley has very much been relegated to a secondary route in recent years but wouldn’t it be easier to electrify and upgrade it to high speed running than the route via Derby. Much of the line is quite straight, has plenty of space for 4 tracks and has far less tunnels, bridges and cuttings than the line via Derby. It is also not so prone to flooding as the Derby route.
If the Erewash Valley Line was electrified and upgraded to 125mph running, surely journey times from both London and Birmingham to Chesterfield and Sheffield via HS2 and an upgraded Erewash Valley could be reduced significantly. Nottingham would also do very well out of this with direct fast trains to London and Birmingham but also improved times for the currently very slow journeys north to Sheffield and Leeds. This would be improved even further if there could be significant upgrading of the route between Sheffield and Leeds.
The report gives the current London to Sheffield time as 132 minutes. 119 minutes via the MML is after MML upgrades between Derby and Sheffield, which are in both the baseline and the regional +25% packages. So, comparing apples with apples, it is saying that switching to HS2 saves 15 minutes - 119 to 104.
But it says that switching London - Nottingham services to HS2 saves 51 minutes - 109 to 58 (or still 42 minutes if we use your figure of 100 for the baseline).
One or other of the via HS2 times must be badly wrong.
I am feeling rather left out by this report in the Leicester area. While it is mentioned it seems very much sidelined compared with Derby and Nottìngham. But that is very much the general feeling you get from this forum as well.I think it assumes that Sheffield trains stay on the MML the whole way. Something has to, otherwise Leicester is screwed. Which I know some people wouldn’t be too disappointed about.