Envoy
Established Member
- Joined
- 29 Aug 2014
- Messages
- 3,159
I have been wading through the report and have some thoughts.
gov.wales
I note that they propose having the present relief lines converted into the express lines with the present express lines being used by the freights and stoppers. I also see a suggestion that the tram-trains (Class 398’s) would go through the Bay area (on roads presumably before reaching the ‘steelworks tracks’) and then, if eastbound, have to cross three of the main line tracks in order to reach the eastbound ‘stopper’ line (currently the fast). Surely, this is a recipe for disaster? These tram-trains will never keep to schedule if they have to go ‘wandering’ around the bay area and would thus screw up things on the main line. I think it best of they are kept off the main line - especially as they can only do 60 mph. I really do wonder if we should keep the lines as they are and just insert the stations with the reliefs having higher speeds?
I also dislike the idea of having P1 at Newport be used by express trains with the loss of the westbound central through track - as mentioned by previous poster. Let us not forget that under the present arrangement, people can get off a west bound train from say Bristol on P2 and just walk straight across the platform to a service bound for The Marches. Bring the westbound trains from Bristol (& beyond) onto P1 and everybody has to drag across the bridge.
The report mentions that all 4 tracks have a running max speed of 90 mph. I would like to have seen the express lines have higher speeds being as they are more or less in a straight line. (Not sure what they would do if Bishton flyover becomes the eastbound express line as surely that would slow things down)? I can’t understand why TfW have ordered 100 mph Stadler Flirts (Class 231) for the Cheltenham/Gloucester line to be diesel only when they will be under wires between STJ and Cardiff Central? Surely, if these are going to make extra stops at places like Magor, Newport West and Cardiff East Parkway, you would want them to have the superior acceleration of electric power?
I am pleased to see the suggestion on P67 that employment zones should be located in city centres rather than on the outskirts by motorway junctions. City centres like Cardiff and to some extent smaller towns such as Pontypridd, are at hubs of the rail system. Building places of employment at motorway junctions just jams up such junctions & is is not for the greater good of the region. The planned business parks for land at J33 should be not be built as they will just encourage those people with employment at these places to drive along the motorway. As I have said before, the plans by Cardiff Council’s LDP - as approved by a Welsh Government inspector - are going to be a disaster. This junction needs flyovers plus a possible connection with the A4119 that does not impede the main flow. Huge areas of housing are going up with the traffic being forced to use the present road network through Radyr, Groes Faen, St. Fagans, Llandaff & Fairwater. (Yes, I know about the proposed Metro line through this area but that will mainly be used for people going to the city centre - although, they could change at Fairwater for the central valleys).
P68 mentions the need for a master plan for the region rather than letting Local Authorities draw up their own LDP’s. At last, some common sense especially as we have so many local authorities in this densely populated part of Wales. The Cardiff Council LDP with business park at J33 bungs up even more the main junction serving Cardiff Airport as well as Barry and much of Cardiff. (I see that that yet another low cost airline is now setting up at Bristol Airpot = Jet2. The fact that the M4 is jammed at Newport and the refusal to build a new motorway is surely another reason for their being a reluctance to operate out of Cardiff)?
Much of the traffic on the M4 in the Newport area is going to/from Bristol. When things get back to normal, I think that GWR should be encouraged to have some promotion of their improved services on this corridor. We have the electric IET’s running along the mainline - often at 30 minute intervals but what many people don't realise is the improvements to/from Bristol Temple Meads now that HST ‘Castle Class’ trains with 4 coaches have replaced the shorter clapped out non air conditioned Sprinter trains. Likewise, Class 165/6’s often in 5 car formations are now providing more seats on those services that go on to Bath and Southampton and Portsmouth. Not exactly a step up from the 158’s with non working air conditioning plus the fact that the former have much 5 across seating. These GWR services are something that the Welsh Government need to look at and not be just concentrating on TfW. What GWR clearly need is a new fleet for all of their non London routes - possibly bi-modes to take advantage of the wires between Cardiff & Bath. Fares are another issue on this route. Cardiff to Swansea day return = £12.50 peak or £10 off peak. Similar distance Cardiff to Bristol = £19.50 peak or £14.30 off peak. Both being a similar distance. So, high fares on the Bristol services are bound to be an incentive to use the car. Anybody who has used the trains on this route previously is likely to have had a bad experience with over crowding.
I note that the report mentions that Newport west should have limited parking to discourage car use in favour of local buses. All well and good but will it work? I think that if a resident of Newport west wishes to travel say to Cardiff and has to first walk to a bus stop, wait for the bus and then switch to a train and then do the whole thing in reverse, that they will just say “blow that, we’ll just drive straight to Cardiff". If on the other hand, they can just jump in the car, drive the short distance to the station and have free parking without all the faff with those horrible parking machines where you have tiny buttons to insert your number plate, then they will be more likely to use the train. So, I would suggest that these new stations have plenty of free parking.
It is regrettable that no mention is made of having a way of leaving the M4 by the former toll booths in order to go into a free car park at STJ. However, I am pleased to see that they suggest a link from the M48.
South East Wales Transport Commission: final recommendations | GOV.WALES
Final report on new sustainable transport options for south East Wales.
I note that they propose having the present relief lines converted into the express lines with the present express lines being used by the freights and stoppers. I also see a suggestion that the tram-trains (Class 398’s) would go through the Bay area (on roads presumably before reaching the ‘steelworks tracks’) and then, if eastbound, have to cross three of the main line tracks in order to reach the eastbound ‘stopper’ line (currently the fast). Surely, this is a recipe for disaster? These tram-trains will never keep to schedule if they have to go ‘wandering’ around the bay area and would thus screw up things on the main line. I think it best of they are kept off the main line - especially as they can only do 60 mph. I really do wonder if we should keep the lines as they are and just insert the stations with the reliefs having higher speeds?
I also dislike the idea of having P1 at Newport be used by express trains with the loss of the westbound central through track - as mentioned by previous poster. Let us not forget that under the present arrangement, people can get off a west bound train from say Bristol on P2 and just walk straight across the platform to a service bound for The Marches. Bring the westbound trains from Bristol (& beyond) onto P1 and everybody has to drag across the bridge.
The report mentions that all 4 tracks have a running max speed of 90 mph. I would like to have seen the express lines have higher speeds being as they are more or less in a straight line. (Not sure what they would do if Bishton flyover becomes the eastbound express line as surely that would slow things down)? I can’t understand why TfW have ordered 100 mph Stadler Flirts (Class 231) for the Cheltenham/Gloucester line to be diesel only when they will be under wires between STJ and Cardiff Central? Surely, if these are going to make extra stops at places like Magor, Newport West and Cardiff East Parkway, you would want them to have the superior acceleration of electric power?
I am pleased to see the suggestion on P67 that employment zones should be located in city centres rather than on the outskirts by motorway junctions. City centres like Cardiff and to some extent smaller towns such as Pontypridd, are at hubs of the rail system. Building places of employment at motorway junctions just jams up such junctions & is is not for the greater good of the region. The planned business parks for land at J33 should be not be built as they will just encourage those people with employment at these places to drive along the motorway. As I have said before, the plans by Cardiff Council’s LDP - as approved by a Welsh Government inspector - are going to be a disaster. This junction needs flyovers plus a possible connection with the A4119 that does not impede the main flow. Huge areas of housing are going up with the traffic being forced to use the present road network through Radyr, Groes Faen, St. Fagans, Llandaff & Fairwater. (Yes, I know about the proposed Metro line through this area but that will mainly be used for people going to the city centre - although, they could change at Fairwater for the central valleys).
P68 mentions the need for a master plan for the region rather than letting Local Authorities draw up their own LDP’s. At last, some common sense especially as we have so many local authorities in this densely populated part of Wales. The Cardiff Council LDP with business park at J33 bungs up even more the main junction serving Cardiff Airport as well as Barry and much of Cardiff. (I see that that yet another low cost airline is now setting up at Bristol Airpot = Jet2. The fact that the M4 is jammed at Newport and the refusal to build a new motorway is surely another reason for their being a reluctance to operate out of Cardiff)?
Much of the traffic on the M4 in the Newport area is going to/from Bristol. When things get back to normal, I think that GWR should be encouraged to have some promotion of their improved services on this corridor. We have the electric IET’s running along the mainline - often at 30 minute intervals but what many people don't realise is the improvements to/from Bristol Temple Meads now that HST ‘Castle Class’ trains with 4 coaches have replaced the shorter clapped out non air conditioned Sprinter trains. Likewise, Class 165/6’s often in 5 car formations are now providing more seats on those services that go on to Bath and Southampton and Portsmouth. Not exactly a step up from the 158’s with non working air conditioning plus the fact that the former have much 5 across seating. These GWR services are something that the Welsh Government need to look at and not be just concentrating on TfW. What GWR clearly need is a new fleet for all of their non London routes - possibly bi-modes to take advantage of the wires between Cardiff & Bath. Fares are another issue on this route. Cardiff to Swansea day return = £12.50 peak or £10 off peak. Similar distance Cardiff to Bristol = £19.50 peak or £14.30 off peak. Both being a similar distance. So, high fares on the Bristol services are bound to be an incentive to use the car. Anybody who has used the trains on this route previously is likely to have had a bad experience with over crowding.
I note that the report mentions that Newport west should have limited parking to discourage car use in favour of local buses. All well and good but will it work? I think that if a resident of Newport west wishes to travel say to Cardiff and has to first walk to a bus stop, wait for the bus and then switch to a train and then do the whole thing in reverse, that they will just say “blow that, we’ll just drive straight to Cardiff". If on the other hand, they can just jump in the car, drive the short distance to the station and have free parking without all the faff with those horrible parking machines where you have tiny buttons to insert your number plate, then they will be more likely to use the train. So, I would suggest that these new stations have plenty of free parking.
It is regrettable that no mention is made of having a way of leaving the M4 by the former toll booths in order to go into a free car park at STJ. However, I am pleased to see that they suggest a link from the M48.