As noted in the article, while right now there may only be 1 freight train per hour, each way, another route to the terminals would mean more trains can run. Without removing passenger trains, there is no possible way of getting more freight through castlefields so the terminals are underutilised (based on capacity vs current utilisation, not taking into account any demand). If a new line means more freight.
Even if all freight trains run bang on time, there will always be some cases where passenger trains don't run to time and they need more recovery paths in the corridor to save a huge domino effect. Alternatively, you can put more passenger trains into the freight slot. I think somewhere in the many Castlefields discussions it was noted that 1 freight train takes up 2 passenger train paths on the corridor. 1 train may not seem like much but if passenger numbers recover to or even close to pre Covid levels, you could really do with the extra path to keep overcrowding to an acceptable level.
Even if all freight trains run bang on time, there will always be some cases where passenger trains don't run to time and they need more recovery paths in the corridor to save a huge domino effect. Alternatively, you can put more passenger trains into the freight slot. I think somewhere in the many Castlefields discussions it was noted that 1 freight train takes up 2 passenger train paths on the corridor. 1 train may not seem like much but if passenger numbers recover to or even close to pre Covid levels, you could really do with the extra path to keep overcrowding to an acceptable level.
There may not be space now but if the opportunities arise, it might enable some loops or something to accomodate freight. Otherwise you are opening up evening freight services when there are less trains. Currently any trains would have to snake around via Northwich and the WCML fitting around many trains there or have to go via Manchester which is often closed at night as maintenance for maintenance since it can't be done in the day.The above, plus reopening the line via Partington to Glazebrook, would provide connectivity to Liverpool, but the CLC line to Liverpool has little extra capacity for freight traffic. However, if part of the old GC line from Glazebrook towards Wigan via Culcheth was reopened to join the Chat Moss line close to the former Kenyon junction, additional connectivity could be provided. The CLC line via Baguley was historically used for a lot of through freight traffic.