What, if any, alterations have to be made to an existing freight-only line in order that the line might accommodate passenger services?
I'm intrigued by the Byth and Tyne upgrade. This is a line made for heavy stuff (I imagine) but a passengerisation seems to involve a geological survey. I assume this is just proposed station sites? After Ilkeston I'd have thought looking for newts a better idea.
I'm intrigued by the Byth and Tyne upgrade. This is a line made for heavy stuff (I imagine) but a passengerisation seems to involve a geological survey. I assume this is just proposed station sites? After Ilkeston I'd have thought looking for newts a better idea.
The DfT will expect every effort to be made to remove level crossings and replace them with bridges where feasible, and will probably want all AHB's replaced with full barriers and CCTV.
Not necessarily.
The ORR will expect that for a line that is already open, but sees a significant intensification of service and/or change in service (ie passenger trains vs freight trains, and/or quicker trains), that appropriate risk assessment is conducted across all matters, of which Level crossings is but one. Other issues include lineside security, signal risk assessments, vehicle incursion, staff safety, and so on.
If the risk increase as a result of a new passenger service on a freight line (which it will, significantly, for any vehicular crossings) then appropriate mitigation will need to be developed and implemented. Bridges are less likely to be required, unless the service intensity is such that barrier downtime will cause an issue on the highway Network, or the whole life cost of providing an MCB level crossing is more expensive than a bridge (which definitely happens).
Any such change would, of course, be subject to CSM-RA as required by ROGS.
My experience is such that there is a reluctance to see any form of increase in the number of level crossings on passenger carrying lines anywhere.
As a former CIP and Principal Assessor I would never have accepted one if you had!My experience is that there is a reluctance to see an increase in level crossings full stop, and a reluctance to see any increase in level crossing risk without reasonable mitigation. As someone who’s signature used to appear on LX risk assessments, it rather concentrates the mind if you were to sign one that permitted an increase in risk without considering mitigation. (I never did).
The Northumberland line, if it reopens to passengers, will have level crossings.
The Northumberland line, if it reopens to passengers, will have level crossings.
Not sure if that has any affect on the LX assessment, given that the risk of a blue-moon event will be markedly different from a regular service, and the linespeed will need upgrading from 20-45mph for regular services.
Thought that might be the case, cheers!Yes it would - the risk assessment is based on the traffic that is planned to operate over it not whether the line can operate passengers or not.
My understanding also is that there was a policy, undertaken in the late 1960s - 70s, of re-signalling etc. 'Goods Lines' for passenger services where they provided alternative routes in the event of disruption.
It would be interesting to have a list of truly 'freight only' lines. It might be quite short.
This would have been when the existing signalling, which would mostly have been to passenger standards, was replaced when resignalling took place. Replacement on a like-for-like basis would have to be justified to the bean-counters and Ministry of Transport/Treasury, who would no doubt have preferred it to be to cheaper goods-only standards.
With the closure of coal mines, it's going to mostly be quarries and similar - e.g. Swinden Quarry (branch from Skipton), Hope cement works, Boulby Potash mine (continuation of passenger line to Saltburn), etc.
Yes it would - the risk assessment is based on the traffic that is planned to operate over it not whether the line can operate passengers or not.