Quite the opposite is happening, they are making it bigger with more capacity and new entrances etc.Once the new arena is built at eastlands they should demolish the current one and give Victoria its platform space back.
Quite the opposite is happening, they are making it bigger with more capacity and new entrances etc.Once the new arena is built at eastlands they should demolish the current one and give Victoria its platform space back.
Wonderful, more traffic to contented with when it kicks out.Quite the opposite is happening, they are making it bigger with more capacity and new entrances etc.
Nearby to a train/tram/bus transport interchange and car parks? Can think of worse places!...it has to have been the worse place to build an arena.
I don’t see tram trains ever coming into fruition. Whatever happened to the trial over in the east?
There’s plans for lots of things that never end up happening.
The lower speed of the trams will be a deciding factor in greater Manchester. Its more likely that metrolink will take over existing railway lines. The two that always seem to get mentioned are the Rose Hill line and the Atherton line.
Yes and now use their own network.
Speed has everything to do with paths. Where would you propose the tram train operates?
The solution to the Heald Green line service provision is to kick off TPE and TfW from it.
The solution to the CLC Warrington line is to electrify it and enable a more frequent stopping service without delaying fast trains, due to the better acceleration of emus cf dmus.
The GMSF still has a way to go before it's done and dusted...The idea that the current Arena will be demolished is for the birds. The only reason to build an arena at Eastlands is because the backers believe there to be an unserved market in Manchester for concerts and other events of that can attract 20,000 people. The current arena has been a huge success and is very popular. Yes in hindsight it would have been better to have built the Arena on the other side of Trinity Way, but back in the early 90s that land was not available anyway.
In the meantime, if 4 bay platforms can be built creating a 10-platform station, that would be very useful. Victoria’s long-term use will be for regional and local commuter services with all Intercity traffic likely to be threaded in to Piccadilly. It will never be a pretty station and it doesn’t need to be.
Looking towards the next 10-15 years, the Greater Manchester Spacial Framework has just been published which highlights (again) aspirations for expanding metrolink with an underground tunnel, a connection at the airport to the mid-Cheshire lines and tram-trains across many existing heavy rail lines, creat8ng a much higher frequency service. Looks good to me.
They should extend the third rail from ormskirk to farington curve jn and use 319’s. They could even operate on the lime st underground system.Or alternatively, extend the present Southport - Hunts Cross Merseyrail to Warrington Central calling all stations every 15 minutes, and having an electric Warrington Central - Oxford Road (or Airport when Oxford Road is finally rebuilt) calling all stations every 30 minutes to start with.
The Regional Express towards Sheffield and onwards would be switched to run via the Earlestofwn route, however this would sever the long standing regional connection between Warrington and Stockport/Sheffield.
Just my opinion as a railway worker in the greater Manchester and surrounding areas.I’m not proposing, TfGM are. We know the Atherton, Warrington, Glossop & Marple lines are proposed, but if you don’t know the capabilities of the units that would be operating on these lines, how can you be sure that speed will be an issue? What insight do you have that TfGM or the Sheffield Supertram do not have?
It certainly did. Until then the station had 5 through platforms, an extra east-facing bay and through roads, as well as a lot more circulating space on the platforms and a much higher roof, meaning better light and less diesel smoke.When built in 1995, the (Manchester) Arena didn't impinge upon Manchester Victoria station, did it?
Assuming Burnham's bus franchising scheme gets through, all public transport in Greater Manchester is soon to be under the control of one body, with the exception of course of heavy rail.Personally I’m against the whole transport system we have in Greater Manchester. In my opinion we need one big company controlling everything like when the Lancashire and Yorkshire railway were in charge.
The issue with the capabilities of the tram-trains will be that the city centre sections of Metrolink have very sharp curves, meaning that quite short, narrow vehicles must be used. It's hard to see how you'd build vehicles suitable for main line railway speeds and longer-journey comfort that could still operate on the Metrolink city centre network. Bear in mind too that some of the lines mentioned have other longer distance services operating over them. It's no longer acceptable to ruin good services to towns beyond the GM boundary in order to grab the route for a local tram operation.I’m not proposing, TfGM are. We know the Atherton, Warrington, Glossop & Marple lines are proposed, but if you don’t know the capabilities of the units that would be operating on these lines, how can you be sure that speed will be an issue? What insight do you have that TfGM or the Sheffield Supertram do not have?
The issue with the capabilities of the tram-trains will be that the city centre sections of Metrolink have very sharp curves, meaning that quite short, narrow vehicles must be used. It's hard to see how you'd build vehicles suitable for main line railway speeds and longer-journey comfort that could still operate on the Metrolink city centre network. Bear in mind too that some of the lines mentioned have other longer distance services operating over them. It's no longer acceptable to ruin good services to towns beyond the GM boundary in order to grab the route for a local tram operation.
NPR is a long way from certain to happen.What towns & cities beyond Wigan & Warrington can’t access Manchester via a different line? We are talking about 20 years from now, when Liverpool fast services will be on NPR and Southport services go via Bolton.
NPR is a long way from certain to happen.
Yes! Or failing that, two bay platforms at Oxford Road. Or two central turnback platforms at Oxford Road. (For the benefit of younger readers, all these things used to exist.)If only we had a terminal station near Deansgate...
Do you really believe that, even if it does go ahead, NPR will be up and running by 2040?What towns & cities beyond Wigan & Warrington can’t access Manchester via a different line? We are talking about 20 years from now, when Liverpool fast services will be on NPR and Southport services go via Bolton.
If tram-train technology is proven to work, I see no reason for it not to work in Greater Manchester.
Do you really believe that, even if it does go ahead, NPR will be up and running by 2040?
There is no need to extend HS2 north of Minshull Vernon; it would be a white elephant. North of Crewe, the main lines divide in 4 directions and no single route will carry enough traffic to justify the enormous expense of a high speed line. In any case, Manchester is not sufficiently big or economically important enough to justify any railway tunnelling; it is not London or New York. As for NPR, shaving 10 minutes off journeys from Manchester to Leeds/Liverpool will not increase rail's modal share markedly, given that most actual journeys are not city centre to city centre. The current Lime Street-Victoria service is fairly good, and could be accelerated by using electric traction and cutting out the intermediate stop. Electrification of the existing Manchester-Huddersfield-Leeds-York line and smoothing out certain sections, as intended near Mirfield, should be sufficient for this route, and is all that is really affordable. One needs to remember that the UK is becoming an economic basket case with enormous debts, heading in the same direction as Argentina.I don’t believe there will be a full bells and whistles NPR, but rather a very watered down version consisting of a spur to Liverpool and electrification across the Pennines. There will be no new line via Bradford. However, as far as Manchester local services are concerned, it doesn’t need anything more than taking the intercity services off the current lines in the city centre, which is exactly what the ‘bog standard’ NPR provides. In fact NPR branded operations can be up and running as long as HS2 to Manchester with the junction built to bring Liverpool and Leeds services in to Piccadilly from the south. Could that be done by 2040? Perhaps. It’s not impossible.
It surprises me that people think NPR will be anything more than the absolute basic level of investment, but that is all it has ever needed.
The idea that the current Arena will be demolished is for the birds. The only reason to build an arena at Eastlands is because the backers believe there to be an unserved market in Manchester for concerts and other events of that can attract 20,000 people. The current arena has been a huge success and is very popular. Yes in hindsight it would have been better to have built the Arena on the other side of Trinity Way, but back in the early 90s that land was not available anyway.
They should extend the third rail from ormskirk to farington curve jn and use 319’s
It’d be more cost effective than putting up overheads.They wouldn't be allowed to do that. 25kV to Ormskirk would be the way to achieve that if you want to (for a single unit could it be done as a simple Windermere-esque extension with no substation?), but if it does happen battery 777s seem more likely.
More on topic, I wonder how much of Manchester's suburban network, if any, could be 25kV-ed on the cheap without substations on that basis? Or none of it?
The arena at Eastlands will be built if the backers believe it will make a profit. Whether that is achieved by catering to previously unserved markets or by attracting events away from the existing arena makes no difference. No other regional city supports two venues of such size. On top of that the events business has completely collapsed with no prospect of filling one arena any time soon never mind two.
Who actually owns the land the Arena is on? I assume Network Rail still own the operational station, but is the area of the former platforms owned by the arena? If it's privately owned judging by everything else in Manchester it'll most likely be developed as more buy-to-let flats if the Arena closes.
There is no need to extend HS2 north of Minshull Vernon; it would be a white elephant. North of Crewe, the main lines divide in 4 directions and no single route will carry enough traffic to justify the enormous expense of a high speed line. In any case, Manchester is not sufficiently big or economically important enough to justify any railway tunnelling; it is not London or New York. As for NPR, shaving 10 minutes off journeys from Manchester to Leeds/Liverpool will not increase rail's modal share markedly, given that most actual journeys are not city centre to city centre. The current Lime Street-Victoria service is fairly good, and could be accelerated by using electric traction and cutting out the intermediate stop. Electrification of the existing Manchester-Huddersfield-Leeds-York line and smoothing out certain sections, as intended near Mirfield, should be sufficient for this route, and is all that is really affordable. One needs to remember that the UK is becoming an economic basket case with enormous debts, heading in the same direction as Argentina.
The way forward for Manchester's suburban routes is conversion of non-electrified lines to Metrolink, or electrification using 25kV where Metrolink conversion is not feasible/desirable, and reserving the Oldfield curve and Castlefleld corridor for Northern Rail local/regional services only.
In any case, Manchester is not sufficiently big or economically important enough to justify any railway tunnelling; it is not London or New York.