People who drive to Crewe and people changing trains at Crewe.What else are they for?
People who drive to Crewe and people changing trains at Crewe.What else are they for?
What else are they for?
What else are they for?
Crewe doesn't need three fast trains per hour to London - if Liverpool can get away with an hourly frequency, then Crewe does not need 3 per hour
I think now that HS2 is being built, it will reach Piccadilly. I share your sentiment that nothing significant will happen until HS2 is fully operational and until then, everything is just tinkering around the edges, although throughput in Castlefield needs to be addressed now. I’d suggest sending all TfW and Southport services in to Victoria then terminate at another destination, e.g. Stalybridge or Bradford.
That's just the way it is - some places are on the main line, some places are on the fringes - some places have big business/university demand, some places don't - some routes justify First Class, some don't - trying to allocate London frequencies based on population size isn't going to work!
Agree entirely with you - I want HS2 to happen but the danger is that, as it keeps getting postponed/delayed, we are missing out on tackling serious problems in the here and now - e.g. there's no will to sort out the clear issue of Manchester - Birmingham being at the mercy of Voyagers, since "HS2 will fix that in the medium to long term, so why spend money on it right now". There's a danger that HS2 becomes like "bionic duckweed" - a medium to long term answer to things that justifies doing nothing about it today - much like my attitude to DIY!
That said, I find it amusing that my idea about reducing to half-hourly was strongly dismissed, yet now there are some suggesting it should be cut to that level.
Tell a Mancunian that Birmingham is the second city and you should get the response “Why, what happened to London?”.Some say (rightly or wrongly) that Manchester is the second city, so for that reason you could argue for Manchester-London having a greater London frequency than Birmingham.
Mancunians seem to think that if they keep saying it is the 2nd city enough times it will be believe by the rest of the country.Tell a Mancunian that Birmingham is the second city and you should get the response “Why, what happened to London?”.
I think 3tph EUS-MAN should probably be left alone or even reduced to 2tph.
I think on balance they should cut the XC Manchester-Bristol/Exeter service and force those passengers to change at Birmingham as was recently mentioned by someone in order to try and free up paths for local passengers in Poynton and Bramhall etc.
I think direct trains from Manchester to Oxford are somewhat more justified (and that service doesn't have to reverse at Birmingham) even if not that many passengers are travelling all the way to Bournemouth.
So you are suggesting that Brum to Manchester becomes 1tph for XC? No chance.I think 3tph EUS-MAN should probably be left alone or even reduced to 2tph.
I think on balance they should cut the XC Manchester-Bristol/Exeter service and force those passengers to change at Birmingham as was recently mentioned by someone in order to try and free up paths for local passengers in Poynton and Bramhall etc.
I think direct trains from Manchester to Oxford are somewhat more justified (and that service doesn't have to reverse at Birmingham) even if not that many passengers are travelling all the way to Bournemouth.
I would say that most of us who have actually thought about the matter would conclude that it's an irrelevance, and that the real problem is that there is no 'second city' - overheating of the largest city has seen to that very effectively. There's London and there's everywhere else. Doesn't mean a lot to put ranks on everywhere else.Mancunians seem to think that if they keep saying it is the 2nd city enough times it will be believe by the rest of the country.
That feels like it'd be better under Avanti.A TPE Scotland - Birmingham via Manchester service would be analagous to an LM Euston - Birmingham via Northampton.
Pendolinos through Castlefield with their notoriously long dwell times sounds like a nightmare. If it was going with Avanti it'd probably have to be IETs.That feels like it'd be better under Avanti.
Pendolinos through Castlefield with their notoriously long dwell times sounds like a nightmare. If it was going with Avanti it'd probably have to be IETs.
(That said, the Pendos are cleared for that route, as they're occasionally diverted that way, but I don't think they ever stop on the corridor)
And the only trains in the TPE fleet with doors at quarters or thirds are the 185's.Pendolinos through Castlefield with their notoriously long dwell times sounds like a nightmare. If it was going with Avanti it'd probably have to be IETs.
(That said, the Pendos are cleared for that route, as they're occasionally diverted that way, but I don't think they ever stop on the corridor)
Pendolinos are worse than IETs though because they have a very slow door closing sequence and a folding step to hold things up. They also accelerate significantly more slowly which, while not strictly dwell-time related, is important for timekeeping in the corridor.IETs would be no better - both are end-doored.
And the only trains in the TPE fleet with doors at quarters or thirds are the 185's.
There was a case of Pendolinos departing from P14 and running via Parkside recently, I believe, it was a nightmare.
Pendolino's are usually run in eco mode and have pretty close acceleration to iet's when it's switched off, or so I've heard on here.They also accelerate significantly more slowly which, while not strictly dwell-time related, is important for timekeeping in the corridor.
I hadn't realised that was a thing, but it still doesn't mean they would be the best choice for that particular service.Pendolino's are usually run in eco mode and have pretty close acceleration to iet's when it's switched off, or so I've heard on here.
Happened during the Acton Grange block last year, disagree it was a nightmare as feedback was ok.IETs would be no better - both are end-doored.
There was a case of Pendolinos departing from P14 and running via Parkside recently, I believe, it was a nightmare.
Against which a 390 has a slightly easier step up from a standard platform height, and more space in its vestibules because they're not on a tapered end?Pendolinos are worse than IETs though because they have a very slow door closing sequence and a folding step to hold things up. They also accelerate significantly more slowly which, while not strictly dwell-time related, is important for timekeeping in the corridor.
It diverted West Midlands - Scotland traffic onto XC Manchester services with interchange at Stockport, and it also caused some traffic to double-back from Manchester to Stockport to join northbound Avanti services. Both appeared to be effects which hadn't been forseen. However that's not generally to disprove your statement at all.Happened during the Acton Grange block last year, disagree it was a nightmare as feedback was ok.
I think it was mixed, it worked when everything else was also running to time, but once just about anything ran late the service fell apart. I didn't have extensive experience, but I went from Manchester Victoria, got held up on the Ordsall Chord, saw the 390 waiting in the queue, got to Piccadilly, changed over the footbridge to a 390 to Stockport, and then waited on the platform for the first 390 I'd seen to arrive to take me to Wilmslow.Happened during the Acton Grange block last year, disagree it was a nightmare as feedback was ok.
Against which a 390 has a slightly easier step up from a standard platform height, and more space in its vestibules because they're not on a tapered end?
I'd suggest it's much of a muchness and that both aren't intended to minimise on dwell times.
A lot of that tends to be quirks of the journey planning systems that the industry doesn't see until they are uploaded. You can fudge them to an extent but it isnt that easy.Against which a 390 has a slightly easier step up from a standard platform height, and more space in its vestibules because they're not on a tapered end?
I'd suggest it's much of a muchness and that both aren't intended to minimise on dwell times.
== Doublepost prevention - post automatically merged: ==
It diverted West Midlands - Scotland traffic onto XC Manchester services with interchange at Stockport, and it also caused some traffic to double-back from Manchester to Stockport to join northbound Avanti services. Both appeared to be effects which hadn't been forseen. However that's not generally to disprove your statement at all.
Indeed. I think it was ridiculous that TPE were allowed to order end-door rolling stock. In my opinion what should have been ordered, assuming Siemens are able to build it, is additional Desiro centre cars to allow the extension of the existing 350s and 185s to 6 or 7 carriages.Agreed. Really, 13/14 should be kept to units with wide double doors at about thirds as far as is possible. The absolute ideal would be for everything to be operated using the CAF units, so door positions could be marked on the platform.
Indeed. I think it was ridiculous that TPE were allowed to order end-door rolling stock. In my opinion what should have been ordered, assuming Siemens are able to build it, is additional Desiro centre cars to allow the extension of the existing 350s and 185s to 6 or 7 carriages.