In about 40 years, if they keep procrastinatingYes they will. In about 40 minutes.
Which Manchester local services would you want to sacrifice to accommodate an extra London train per hour? Pathing issues at Stockport and lack of paths between there and Piccadilly have prevented Northern from meeting its franchise commitments - an extra Macclesfield stopper and a second mid-Cheshire line service. A fourth London service (via Birmingham) in place of Cross Country might work but you would then lose direct links to the south coast.
No. Absolutely not. I can't think of a worse waste of capacity in that area.
MAN-EUS is such that people will take the train most of the time anyway because it's cheaper and more convenient. The few that drive are not going to be lured over by an extra train per hour.
Once HS2 comes along such questions will be irrelevant anyway.
I don't think it's acceptable that the south Manchester commuter routes who were promised service upgrades at the start of the Northern franchise (i.e. half-hourly service to Chester and to Macclesfield) should have to wait for HS2 while people going to London and sucking out of the Manchester economy get priority on the current WCML.True, only a couple of decades to wait though.
Why? Where is the demand for the 4th path, it certainly hasn't been there since the December 2008 timetable.HS2 might not even happen anyway and even if it does, it's a generation away.
My suggestion of removing the Alderley Edge stopper in the other thread didn't go down particularly well, but if another London or Birmingham path can be created by its removal, then it really should be scrapped.
I still don't understand the point.if another London or Birmingham path can be created by its removal, then it really should be scrapped.
I don't think it's acceptable that the south Manchester commuter routes who were promised service upgrades at the start of the Northern franchise (i.e. half-hourly service to Chester and to Macclesfield) should have to wait for HS2 while people going to London and sucking out of the Manchester economy get priority on the current WCML.
HS2 might not even happen anyway and even if it does, it's a generation away.
My suggestion of removing the Alderley Edge stopper in the other thread didn't go down particularly well, but if another London or Birmingham path can be created by its removal, then it really should be scrapped.
I think losing the direct XC service to the south coast would be the casualty, given it is faster to transfer through London anyway.
I dont think this is viable on the WCML. Maybe after HS2 Phases 1 and 2a this will be possible (with a 2tph via Stoke/2tph via Wilmslow split), with Birmingham also going to 4tph, but the problem here is that when/if HS2 Phase 2b happens, the paths will again cease to exist.
I'd have a HS2 Phase 1 + 2a service pattern of:
00 Glasgow (OOC, Bham Intl, Preston, Lancaster, Oxenholme, Penrith, Carlisle, Motherwell)
03 Manchester (OOC, Bham Intl, Crewe, Wilmslow, Stockport)
06 Birmingham (OOC, Bham Intl)
09 Blackpool (OOC, Bham Intl, Crewe, Warrington, Wigan, Preston, Kirkham, Poulton)
12 SPARE PATH FOR RECOVERY
15 Liverpool (OOC, Bham Intl, Crewe, Runcorn, Liverpool South Parkway)
18 Manchester (OOC, Bham Intl, Stafford, Stoke, Macclesfield, Stockport)
21 Birmingham (OOC, Bham Intl)
24 Crewe (OOC, Bham Intl, extend to Chester if electrification happens)
27 SPARE PATH FOR RECOVERY
30 Edinburgh (OOC, Bham Intl, Preston, Lancaster, Oxenholme, Penrith, Carlisle, Haymarket)
33 Manchester (OOC, Bham Intl, Crewe, Wilmslow, Stockport)
36 Birmingham (OOC, Bham Intl)
39 Blackpool (OOC, Bham Intl, Crewe, Warrington, Wigan, Preston, Kirkham, Poulton)
42 SPARE PATH FOR RECOVERY
45 Liverpool (OOC, Bham Intl, Crewe, Runcorn, Liverpool South Parkway)
48 Manchester (OOC, Bham Intl, Stafford, Stoke, Macclesfield, Stockport)
51 Birmingham (OOC, Bham Intl)
54 Crewe (OOC, Bham Intl, extend to Chester if electrification happens)
57 SPARE PATH FOR RECOVERY
The Manchesters via Wilmslow can move over to the Manchester branch of HS2 once it opens.
What about people who use those services that don’t live south of Reading? Ie almost all of them?
I dont think this is viable on the WCML. Maybe after HS2 Phases 1 and 2a this will be possible (with a 2tph via Stoke/2tph via Wilmslow split), with Birmingham also going to 4tph, but the problem here is that when/if HS2 Phase 2b happens, the paths will again cease to exist.
I'd have a HS2 Phase 1 + 2a service pattern of:
00 Glasgow (OOC, Bham Intl, Preston, Lancaster, Oxenholme, Penrith, Carlisle, Motherwell)
03 Manchester (OOC, Bham Intl, Crewe, Wilmslow, Stockport)
06 Birmingham (OOC, Bham Intl)
09 Blackpool (OOC, Bham Intl, Crewe, Warrington, Wigan, Preston, Kirkham, Poulton)
12 SPARE PATH FOR RECOVERY
15 Liverpool (OOC, Bham Intl, Crewe, Runcorn, Liverpool South Parkway)
18 Manchester (OOC, Bham Intl, Stafford, Stoke, Macclesfield, Stockport)
21 Birmingham (OOC, Bham Intl)
24 Crewe (OOC, Bham Intl, extend to Chester if electrification happens)
27 SPARE PATH FOR RECOVERY
30 Edinburgh (OOC, Bham Intl, Preston, Lancaster, Oxenholme, Penrith, Carlisle, Haymarket)
33 Manchester (OOC, Bham Intl, Crewe, Wilmslow, Stockport)
36 Birmingham (OOC, Bham Intl)
39 Blackpool (OOC, Bham Intl, Crewe, Warrington, Wigan, Preston, Kirkham, Poulton)
42 SPARE PATH FOR RECOVERY
45 Liverpool (OOC, Bham Intl, Crewe, Runcorn, Liverpool South Parkway)
48 Manchester (OOC, Bham Intl, Stafford, Stoke, Macclesfield, Stockport)
51 Birmingham (OOC, Bham Intl)
54 Crewe (OOC, Bham Intl, extend to Chester if electrification happens)
57 SPARE PATH FOR RECOVERY
The Manchesters via Wilmslow can move over to the Manchester branch of HS2 once it opens.
Of course running diesels under the wires from Birmingham to Manchester is silly but XC don't have any electric trains and the service was switched from the WCML franchise to the Cross Country franchise many years ago.
There used to be a pendolino services between Brum & Manc, which was usually a train that had just come in to New Street from Euston. I don’t think it was a service that happened from Manc-Brum-Euston. But given how crap XC is, I would certainly ‘trade’ a Manc-Brum-Reading service for an Avanti Manc-Brum-Euston, given it is often faster getting to Reading via London than the direct train.
Well I think there is a strong consensus here that we don't need 4 tph Euston - Manchester at the expense of rewriting the WCML timetable and disadvantaging many other locations.
That's not to say that the base timetable is perfect. There's always room for improvement.
Here's one to consider:
Cease running Voyagers under the wires Birmingham to Manchester, so Cross Country concentrates on the North East - South/South West axis. Let TPE take over the Manchester - Birmingham fast trains, diverting services away from the over-served Manchester Airport and extending through to Birmingham New Street / International.
That way you get enhanced connectivity Scotland / North West to West Midlands, using modern electric rolling stock in place of tired Voyager DMUs, and it might solve some capacity issues in the Manchester area as well.
I wouldn't expect every train to call at Birmingham International as you have listed here. HS2's headline journey times omit Birmingham International calls. Also if the services run as 400m trains then several of the stops on the current network cannot cope with that length.I dont think this is viable on the WCML. Maybe after HS2 Phases 1 and 2a this will be possible (with a 2tph via Stoke/2tph via Wilmslow split), with Birmingham also going to 4tph, but the problem here is that when/if HS2 Phase 2b happens, the paths will again cease to exist.
I'd have a HS2 Phase 1 + 2a service pattern of:
00 Glasgow (OOC, Bham Intl, Preston, Lancaster, Oxenholme, Penrith, Carlisle, Motherwell)
03 Manchester (OOC, Bham Intl, Crewe, Wilmslow, Stockport)
06 Birmingham (OOC, Bham Intl)
09 Blackpool (OOC, Bham Intl, Crewe, Warrington, Wigan, Preston, Kirkham, Poulton)
12 SPARE PATH FOR RECOVERY
15 Liverpool (OOC, Bham Intl, Crewe, Runcorn, Liverpool South Parkway)
18 Manchester (OOC, Bham Intl, Stafford, Stoke, Macclesfield, Stockport)
21 Birmingham (OOC, Bham Intl)
24 Crewe (OOC, Bham Intl, extend to Chester if electrification happens)
27 SPARE PATH FOR RECOVERY
30 Edinburgh (OOC, Bham Intl, Preston, Lancaster, Oxenholme, Penrith, Carlisle, Haymarket)
33 Manchester (OOC, Bham Intl, Crewe, Wilmslow, Stockport)
36 Birmingham (OOC, Bham Intl)
39 Blackpool (OOC, Bham Intl, Crewe, Warrington, Wigan, Preston, Kirkham, Poulton)
42 SPARE PATH FOR RECOVERY
45 Liverpool (OOC, Bham Intl, Crewe, Runcorn, Liverpool South Parkway)
48 Manchester (OOC, Bham Intl, Stafford, Stoke, Macclesfield, Stockport)
51 Birmingham (OOC, Bham Intl)
54 Crewe (OOC, Bham Intl, extend to Chester if electrification happens)
57 SPARE PATH FOR RECOVERY
The Manchesters via Wilmslow can move over to the Manchester branch of HS2 once it opens.
Platform capacity at New Street is indeed an issue so I'd hope to turn round at International instead.The issue with splitting services at New St is platform capacity there. Also, a Birmingham to Scotland via Mancheter would probably be overtaken by the existing Birmingham to Scotland service, and therefore the additional connectivity is not much use.
The issue with splitting services at New St is platform capacity there. Also, a Birmingham to Scotland via Mancheter would probably be overtaken by the existing Birmingham to Scotland service, and therefore the additional connectivity is not much use.
I guess only electrification or longer trains would do that?But then the solution to that is solving the giant wheeled problem that is XC, not substituting something for it and accepting that it will forever be rubbish.
As I understand, the three Manchester-London trains will all go via Wilmslow once phase 2a has opened, with only 1 train stopping. Therefore, what existing services are given up on the Crewe-Wilmslow-Stockport-Piccadilly line to accommodate 3 London services?
I expect you would have to tack it on to an International stopper, you aren't getting any extras down there as previous attempts at long distance stoppers havent been successful as we know.Platform capacity at New Street is indeed an issue so I'd hope to turn round at International instead.
A TPE Scotland - Birmingham via Manchester service would be analagous to an LM Euston - Birmingham via Northampton. It wouldn't be the fastest service and might well get overtaken by a later express service, but would serve a lot of markets.
As an aside why has @Philip changed his mind from wanting to remove one this time last year?
This kind of thing is simply daft oneupmanship. Timetables should be written based on where the demand is, not the political status of the places concerned.Some say (rightly or wrongly) that Manchester is the second city, so for that reason you could argue for Manchester-London having a greater London frequency than Birmingham.
One advantage of the OP's suggestion is that four trains per hour might fit in with other services a bit better - e.g. at the moment the Stoke corridor has to try to accommodate a half hourly XC service but the two VT services have a roughly 20/40 gap.
So if you had four trains from Euston to Piccadilly, you could have a simpler half hourly service through Stoke, dovetailing better with the XC services. Plus a half hourly service via Crewe too, which could then remove that stop from the Euston - Liverpool service?
A fourth train per hour from Euston to New Street might similarly provide better spacing along the Coventry corridor (depending on the WMT services, of course) - I just feel that twenty minute services are a bit problematic since it's harder for other services to fit around (than something based on thirty minute intervals), or forces other services to become twenty minute frequencies too to fit in.
But it won't work, because it'd need the whole WCML timetable to be similarly recast, and I can't see that happening until HS2 either happens or is scrapped.
Maybe if you were starting the WCML timetable with a blank sheet of paper you'd have designed things a bit differently, maybe there's a trade off between giving Manchester a fourth service if that meant that every Manchester service had to pick up one additional stop (e.g. one per hour at Nuneaton, one per hour at Tamworth...) - but, as I say, it's not feasible as things currently are, so feels like a non-starter.
<crayola mode>Maybe a fourth Manchester service could mean Euston - One Trent Valley Station - Crewe - Warrington NW - Eccles - Piccadilly, to remove some Warrington pressure off the Scottish services and also provide a faster way of getting to Salford for all those BBC staff on expenses? </crayola mode>
What else are they for?Why do you think the 3 trains at Crewe are purely for the population of Crewe?