Wow- there is me being naïve - I honestly thought it was pretty close to being truly shovel ready.
Others might confirm, but I don’t think the design for Bristol is done.
Wow- there is me being naïve - I honestly thought it was pretty close to being truly shovel ready.
Others might confirm, but I don’t think the design for Bristol is done.
Chiltern might not be shovel ready, but the work has to be done "somewhere" in the country to create shovel ready projects!
https://www.railadvent.co.uk/2020/0...lectrified-589-million-funding-announced.html I will try and find other links to announcement etc, but this looks like fully funded and 4 tracking Huddersfield to Leeds
Not very shovel ready at all I am afraid.How 'shovel ready' is the electric spine project which got later cancelled?
How 'shovel ready' is the electric spine project which got later cancelled?
Other opinions are available.
Where is that like button?Not even crayon ready.
Colne, Ormskirk and Blackpool south are all still inter-worked in terms of the actual units even if they do officially terminate.Oh, and for pure comedy value as much as sensible rationale, I'll suggest Blackpool South actually. That branch annoys me given they're now terminating services at Preston.
You seem to be under the impression that XC is due to get bimodes in the medium term which makes sense given the amount of under-wires running they do already. Is there any particular reason why something like Sheffield to Doncaster or the Hope Valley isn't on your list?There’s plenty of pencil ready projects. The unfinished bits of GWEP. The MML. Trans Pennine. That’s plenty to be going on with now. Then when the first of these is shovel ready, start on the next priorities.
In my opinion that should be the Felixstowe and Gateway branches, Acton - Acton Wells - Harlesden / Hendon, Nuneaton to Birmingham, Derby to Birmingham, Westerleigh to Bromsgrove and Oxford to Nuneaton.
Other opinions are available.
You seem to be under the impression that XC is due to get bimodes in the medium term which makes sense given the amount of under-wires running they do already. Is there any particular reason why something like Sheffield to Doncaster or the Hope Valley isn't on your list?
You seem to be under the impression that XC is due to get bimodes in the medium term which makes sense given the amount of under-wires running they do already. Is there any particular reason why something like Sheffield to Doncaster or the Hope Valley isn't on your list?
I get that you want the Chiltern route electrified as quickly as possible, but choosing to complete schemes that are considerably more advanced first will not delay any proposed scheme to electrify the Chiltern route.
The Chiltern route will need an extremely large amount of design work with structures through London, Birmingham and an AONB to clear. The project will also have a number of interfaces with some existing/newly completed electrification, with further future electrification projects, and with the electrical supply for HS2, which will also have to be handled at the development and design stages. There's also the signalling issues that have previously been discussed to be addressed and a suitable rolling stock strategy to develop in collaboration with LUL.
It's a very long way off from being brought to the 'shovel ready' stage.
Oh, and for pure comedy value as much as sensible rationale, I'll suggest Blackpool South actually. That branch annoys me given they're now terminating services at Preston.
As a point of order, London Underground have already upgraded the power supply on most of the "Sub-Surface Railway" from 630V to 750V (nominal) DC as part of the S Stock rollout, though it's still true fourth rail rather than the bonded arrangement on the shared sections of the Bakerloo and District Lines.LUL to upgrade the power supply to allow Chiltern to run dual voltage EMUs which use LUL DC for power from Amersham to Harrow (expect a big bill from TFL) or some way of segregating the Chiltern lines between Harrow and Amersham (will cost a huge sum and be very difficult).
As a point of order, London Underground have already upgraded the power supply on most of the "Sub-Surface Railway" from 630V to 750V (nominal) DC as part of the S Stock rollout, though it's still true fourth rail rather than the bonded arrangement on the shared sections of the Bakerloo and District Lines.
How about simplifying the Met service so all trains go to Watford. Chiltern then takes over the entire service from Rickmansworth to Amersham. Or does this create capacity problems for Chiltern at Marylebone?... or some way of segregating the Chiltern lines between Harrow and Amersham (will cost a huge sum and be very difficult).
Surely you could start Filton leaving the Bristol to the end? The current track layout north of Bristol East is surely fixed for a long time unless there is no passive provision for new stations?The western bits dropped from GWEP are closest, but I wouldn’t call them shovel ready as far as I’m aware. Bristol has to wait for remodelling next year anyway.
Cost shouldn’t be an issue - must be cheaper to beef up the LU power on the line than all the electrical infrastructure you would have to budget for if it was a whole new electrification?!I wasn't thinking the voltage so much as capacity - I don't know how much headroom LUL have on their network or whether it would be capable of handling the draw of another 2/3 tph each way without further enhancement.
Cost shouldn’t be an issue - must be cheaper to beef up the LU power on the line than all the electrical infrastructure you would have to budget for if it was a whole new electrification?!
How about simplifying the Met service so all trains go to Watford. Chiltern then takes over the entire service from Rickmansworth to Amersham. Or does this create capacity problems for Chiltern at Marylebone?
Surely with Chiltern there are actually two different lines - Marylebone (and in future Old Oak Common) to High Wycombe / Banbury is presumably more straightforward as it doesn't 'interact' with London Underground and could - in theory at least - be electrified at 25kv and use standard EMUs ? (Yes, I know there may be bridges and other structures which would need addressing, but that applies to any route which is being wired).
The problem one presumably is the Aylesbury line because of the shared running with LUL from Harrow on the Hill to Aylesbury ? And I'm guessing it would need one of the following - LUL to agree to 25kv electrification on their infrastructure (I'm going to assume highly unlikely), LUL to upgrade the power supply to allow Chiltern to run dual voltage EMUs which use LUL DC for power from Amersham to Harrow (expect a big bill from TFL) or some way of segregating the Chiltern lines between Harrow and Amersham (will cost a huge sum and be very difficult).
What *might* cause the Chiltern line some problems in the medium term would be some madcap decision by the Mayor of London about banning or limiting diesel trains on emissions grounds or the alike. Though at least then NR / Chiltern would reasonably be able to turn to the Mayor and TFL and suggest they put their hands in their pockets in order to fund such improvements.......
).
Surely you could start Filton leaving the Bristol to the end? The current track layout north of Bristol East is surely fixed for a long time unless there is no passive provision for new stations?
But surely the first option with Blackpool South is to offer it to the council to extend the tramway out to Kirkham & Wesham...... (runs and hides).
Putting OLE on LUL 4th Rail would actually be rather simpler than putting it over 3rd rail, at least technically.
Another option is battery hybrids, ie a small ish traction battery to cover the 14 miles from Harrow to Amersham, with wires on the rest. In fact that might help for the whole Chiltern fleet, to get round any potential issues in St Johns Wood tunnel or Snow Hill Tunnel Etc.
I would not do tram all the way to K&W but for a business case it would have to at least be considered.
On the OHLE over 4th rail - is there something specific which makes it easier than against the NR 3rd rail ?
Isn't that due to be done next Easter? There seems to be zero chance of anyone using a shovel in anger much before then!The western bits dropped from GWEP are closest, but I wouldn’t call them shovel ready as far as I’m aware. Bristol has to wait for remodelling next year anyway.
Isn't that due to be done next Easter? There seems to be zero chance of anyone using a shovel in anger much before then!
So you could safely green light Filton electrification as it isn’t going to get to Bristol East before the junction is done. The only variable is what passive stuff for new stations you put in.Isn't that due to be done next Easter? There seems to be zero chance of anyone using a shovel in anger much before then!
So you could safely green light Filton electrification as it isn’t going to get to Bristol East before the junction is done. The only variable is what passive stuff for new stations you put in.
How can you ‘green light’ it if you don’t know a) wha thou are green lighting and b) how much it is going Tom cost?
It's fine, we don't really need to know what wire runs are needed, where we'll anchor them and tension them, what the crosses and switchovers will be, what the isolation arrangements will be and what the signal sighting requirements will be.