As recent events have only too tragically proved Network Rail has an immense amount of infrastructure to maintain even before any sleepers or rails can be laid and maintained. Musing about that I thought immediately of two long tunnels within 5 miles of where I'm sat, but forgot a third smaller one! Major work is currently under way to reline one of the longest tunnel's air shafts (it's 700 feet deep) and improve drainage within the tunnel. That's taking over 6 months and costing over £1m.
Within half a mile of my local station there are 8 bridges - 2 road overbridges, 5 bridges over a river and a long culvert. Passengers will notice the road bridges but not know the others are there. That culvert is currently receiving attention requiring coffer dams at each end and pumping water through a large pipe to ensure work can proceed manually as there's no room to get machinery through. A work site has been created on protected green space and will have to be restored.
Then there are three junctions within a mile of each other to be maintained in all weathers, with signals as well - and they fail far too often.
That's before any trains can run. Making a commercial case based on the likes of the £2 I've just paid for a ticket to my next station is impossible. That's the smallest drop in the ocean of finance that's necessary. If railways are to justify such large amounts of public funding more paying passengers are needed to pay more in fares - a lot of them, going longer distances and more often.
A bit of a problem for us today, so the bits that are expensive to maintain will have to be reconsidered for closure. Use them or lose them.
While staying at Clapham (North Yorkshire where there used to be another Clapham Junction) last November I looked at using the Bentham line. Clapham village is a mile from the station, one that struggled to achieve 7,000 passengers a year. No trains suited a jouney to anywhere we wanted to go, but we looked in at Bentham (26,000 passengers) which is how I know there's a very active Community Rail group at work. The Pacer we saw picked up 2 passengers adding to the 5 already aboard - it wasn't hard to count them. 10/10 for the station facilties and obvious enthusiasm of the group. A gang of 6 Network Rail men were doing something, but not clear what. Is the line justifiably economic? That's very hard to say.