• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Grand Central choosing 90s over 91s

Status
Not open for further replies.

DorkingMain

Member
Joined
25 Aug 2020
Messages
692
Location
London, UK
Apologies if this has already been addressed elsewhere.

What was the reasoning behind Grand Central choosing Class 90 locomotives rather than Class 91?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

43096

On Moderation
Joined
23 Nov 2015
Messages
18,867
Apologies if this has already been addressed elsewhere.

What was the reasoning behind Grand Central choosing Class 90 locomotives rather than Class 91?
The paths they have are 110mph and as a 90 is faster accelerating than a 91 it makes sense. In addition, hiring 90s is an internal DB transaction (at least until Arriva is spun off) which is beneficial to the DB group.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Class 90s accelerate better and the 125mph top speed of the 91s cannot generally be used anyway since speeds over 110mph are only (usually) for tilting stock
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,275
Arriva effectively paying for some of DB's unservicable 90s to be fully refurbished.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,938
Location
Mold, Clwyd
The class 90 fleet has a future, class 91s don't, unless somebody chooses to lease a decent number of them.
Otherwise maintenance costs for a handful of locos become prohibitive.
 

mackeral1234

Member
Joined
11 Feb 2010
Messages
60
Location
Stoke on Trent
Class 90 have been used since the late 80s - InterCity/Virgin/RfD/EWS/RES/DB. So they would not need any new arrangement as the 91s may not be approved for the WCML.
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,272
It's quite simple.

The boss at GCR used to maintain the cl.91 fleet in a previous life and knows them only too well.
The 91 fleet is expensive to run and you need well trained staff, experienced in their ways, to maintain them.
91's will need to go through all the usual route compatibility and clearance procedures, unlike the 90's.
90's will do the job just as well and are less expensive.
DB have some spare 90's.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,324
Location
Glasgow
The RPS suggests that in spite of the oft-stated view that a 90 is faster accelerating than a 91, the difference is not as significant as it might first appear.
 

Railperf

Established Member
Joined
30 Oct 2017
Messages
3,684
The RPS suggests that in spite of the oft-stated view that a 90 is faster accelerating than a 91, the difference is not as significant as it might first appear.
Especially on wet rails!! I would have thought though that the planned upgrading of some WCML non EPS limits from 110mph to 125mph would have made a 125mph loco potentially more useful.
 

mmh

Established Member
Joined
13 Aug 2016
Messages
4,293
Especially on wet rails!! I would have thought though that the planned upgrading of some WCML non EPS limits from 110mph to 125mph would have made a 125mph loco potentially more useful.

Is there any source for planned 125 non-EPS running other than rumour?

As ever, it's worth pointing out that there are plenty of EPS speed differentials which aren't 110/125.
 

DB

Guest
Joined
18 Nov 2009
Messages
5,036
The RPS suggests that in spite of the oft-stated view that a 90 is faster accelerating than a 91, the difference is not as significant as it might first appear.

91s shift above about 60mph, but are really slow accelerating below that.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,324
Location
Glasgow
Especially on wet rails!! I would have thought though that the planned upgrading of some WCML non EPS limits from 110mph to 125mph would have made a 125mph loco potentially more useful.

I remembered yourself mentioning that before, dispelling the myth over a significant difference between them. I think you said that to 110 they are both about 5 mins 30 or something? Can't quite remember.

91s shift above about 60mph, but are really slow accelerating below that.

Presumably because of the difference in maximum against continous power outputs. The 90 can produce up to 7,860hp, but continously only 5,000.

The 91 can produce up to 6,300hp and 6,090 continuous, so presumably the higher continous output means they have more grunt at higher speeds but the lower maximum output affects accelerating from a stand.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Especially on wet rails!! I would have thought though that the planned upgrading of some WCML non EPS limits from 110mph to 125mph would have made a 125mph loco potentially more useful.

Aren't those planned areas generally north of Preston?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,920
I would have thought though that the planned upgrading of some WCML non EPS limits from 110mph to 125mph would have made a 125mph loco potentially more useful.

“Planned” is rather too strong a word there. “Potential” is about the best that can be attached to that proposal at present. Which then makes the use of 90s rather sensible. Why would you want a small sub-fleet of locomotives that have never been used (and more importantly, maintained) on the WCML on the off chance that at some point in the medium to long term future some parts of the line might be upgraded for higher speeds if A N Other pays for it?
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,867
Presumably because of the difference in maximum against continous power outputs. The 90 can produce up to 7,860hp, but continously only 5,000.

The 91 can produce up to 6,300hp and 6,090 continuous, so presumably the higher continous output means they have more grunt at higher speeds but the lower maximum output affects accelerating from a stand.
Gearing makes a difference as well, with the 91s being 140mph geared it's a greater differential from the 110 of the 90s than if they were 125mph geared.
 

CW2

Established Member
Joined
7 May 2020
Messages
2,227
Location
Crewe
I think the eventual aim of raising the non-tilt speed limits on the WCML is driven by the need for HS2's non-tilting trains to maintain competitive schedules north of Crewe. There's probably a strong business case for that, whereas any changes south of Crewe are as yet unproven and unfunded.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,324
Location
Glasgow
Gearing makes a difference as well, with the 91s being 140mph geared it's a greater differential from the 110 of the 90s than if they were 125mph geared.

Very true, but the gearing does mean that the 91 still has its turn of speed to come at 110mph while the gearing is beginning to hold the 90 back.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,723
Is there any source for planned 125 non-EPS running other than rumour?

As ever, it's worth pointing out that there are plenty of EPS speed differentials which aren't 110/125.
Yes, there is a large amount of work being done in the background. Don't expect 125 non EPS in large amounts, it will be a lot of 115 or 120.
I think the eventual aim of raising the non-tilt speed limits on the WCML is driven by the need for HS2's non-tilting trains to maintain competitive schedules north of Crewe. There's probably a strong business case for that, whereas any changes south of Crewe are as yet unproven and unfunded.
All the work is being done on the south of the route so 805/7 can take advantage initially.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,307
New thread in general discussion reports the GC Blackpool service has been abandoned :


Probably best that all discussion takes place there...
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,920

Railperf

Established Member
Joined
30 Oct 2017
Messages
3,684
Mr Dennis is woefully misinformed. The initial study work being done by Avanti might be done by the end of the year, but that’s not even the end of the beginning, to quote Churchill.
Who is commissioning the study for line speed improvements North WCML? I would have thought TPE as they were testing their trains at 125mph there?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,723
Who is commissioning the study for line speed improvements North WCML? I would have thought TPE as they were testing their trains at 125mph there?
HS2 have had a bit of look at it, but it hasn't progressed anywhere in the last couple of years.
 
Status
Not open for further replies.

Top