Philip
On Moderation
Just wondering of any likely or good potential new operators of the 27 class 175s and 15 class 185s due to go off lease in the next year or two?
I reckon you could put 185s on the West Highland Line, with 175s maybe doing some sort of regional express workings like Scarborough to Sheffield and Morpeth to Carlisle.Just wondering of any likely or good potential new operators of the 27 class 175s and 15 class 185s due to go off lease in the next year or two?
Crofton and Heaton have experience of 180s which might give them a head start on 175s but it does seem that Chester have to work hard to keep the sets available.However, the obvious issue is that Chester have built up expertise in keeping the sets going, and it would be difficult to justify the expense of replicating that elsewhere.
I reckon you could put 185s on the West Highland Line, with 175s maybe doing some sort of regional express workings like Scarborough to Sheffield and Morpeth to Carlisle.
to be fair, the hydrogen/battery + EMU bimode solution is probably the best one. English and Welsh railways should definitely follow suit. Put the same sort of trains on the Heart of Wales and the Settle+Carlisle Lines Plus maybe others. Unfortunately this would mean an end to the days of mainline DMUs in Britain. Probably for the best, though.And it's also ignoring the decision by Transport Scotland to procure zero emission units to operate the WHL, FNL and Kyle routes with some form of either hydrogen bi-mode unit or a battery EMU being the only two options for the WHL.
Sending the 175s to Crofton would be an absolute recipe for disaster - they'd be better off dumped at Ely or Long Marston in that case.Crofton and Heaton have experience of 180s which might give them a head start on 175s but it does seem that Chester have to work hard to keep the sets available.
How so? They’ve got Coradia 1000 experience as mentioned in post #4.Sending the 175s to Crofton would be an absolute recipe for disaster.
The reliability of the Hull Trains 180s dropped off a cliff when they transferred to there from Old Oak Common. I can only imagine the same happening to the 175s if they moved to there from Chester.How so? They’ve got Coradia 1000 experience as mentioned in post #4.
The same issues didn't seem to affect the Grand Central units, though they have heavier work done at Heaton I believe. The use of "Crofton" and "dropped" in the same sentence probably brings Hull Trains' fleet managers into a cold sweat, mind!The reliability of the Hull Trains 180s dropped off a cliff when they transferred to there from Old Oak Common. I can only imagine the same happening to the 175s if they moved to there from Chester.
Even getting round the sprinter differentials issue, with the WHL being single track predominantly until stations, services go to Crianlarich from Glasgow as 6 coaches and split such that 4 go to Fort William and Mallaig and 2 to Oban. 185s would not only hinder this, but reduce capacity significantly both in terms of seats (a 3 car 185 has less standard seats than a 156), luggage, and bike space. Complete no go.I reckon you could put 185s on the West Highland Line.
It has been announced (and extensively discussed on this forum) that TPE aren't taking on Liverpool to Nottingham. Indeed there is a whole thread about what rolling stock might be used (with 185s not indicated to be ideal).Looking at the numbers, I'm guessing the most likely option for the remaining 185s is to stay with TPE, so that they have enough stock for adding Liverpool-Nottingham to their routes. Wouldn't be surprised if the Nottingham is then worked by 68/mk5s with 185s covering all Redcar and a couple of Man Airport-Newcastle diagrams, give or take. That way Liverpool crew wouldn't need to retain traction knowledge of 185s.
175s - Scotrail, South West, FGW, Northern, Chiltern?
I thought ScotRail were going to introduce Class 158s on the West Highland LineEven getting round the sprinter differentials issue, with the WHL being single track predominantly until stations, services go to Crianlarich from Glasgow as 6 coaches and split such that 4 go to Fort William and Mallaig and 2 to Oban. 185s would not only hinder this, but reduce capacity significantly both in terms of seats (a 3 car 185 has less standard seats than a 156), luggage, and bike space. Complete no go.
Pretty sure a 185 is RA5.Would the 185s be able to ride the West Highland line as back in diesel loco days it only had RA5 clearance. There seems to be a consensus on here that they are one of the heavier DMUs on the network.
Would platforms require any work for 185s to work the West Highland Line?Pretty sure a 185 is RA5.
No idea, someone would have to stick it through some gauging software.Would platforms require any work for 185s to work the West Highland Line?
My apologiesNo idea, someone would have to stick it through some gauging software.
I thought the TfW CAF units were going to Chester so the 175s will have to leave?If 175 maintenance is to remain at Chester
I'm not sure DOR-operated Northern will want the burden of such heavy and thirsty units. It wouldn't surprise me if all the 185s stay with TPE, particularly if they end up operating the proposed third fast service along the Hope Valley.A controversial idea, but I'd keep the 175s in Wales!
The 185s will mostly be staying with TPE. Any spares may as well go to Northern. Siemens will want to keep them near York and Ardwick.
That isn't guaranteed apparently, its an option. They need extra space there if they do.I thought the TfW CAF units were going to Chester so the 175s will have to leave?
Interesting, thanks. Where else can the CAFs go?That isn't guaranteed apparently, its an option. They need extra space there if they do.
175s could well end up with Northern, regardless of the Chester depot situation. If there won't be space at Chester moving forward, Crofton or Heaton would be potential alternative homes
The 175s are lovely trains, I certainly wouldn't complain if they ended up on Northern Connect
they were ordered by First North Western, and as well as in North Wales they used to operate the former NorthWest Express services to Blackpool, Barrow and Windermere from Manchester