PROPOSALS TO IMPROVE SOUTH LONDON AND BRIGHTON LINE SERVICES
I present proposals to tackle the "Croydon Bottleneck" and improvements to services in South London.
CROYDON BOTTLENECK - some interim proposals
I am in general agreement with the proposals for solving the "Croydon Bottleneck". However, given that the project is unlikely to be completed for another 12-15 years, a large percentage of present-day commuters (especially those over 45) will not experience the benefits. I therefore suggest a few simple changes to timetables and routing that could be implemented now, with minimal cost and no changes to infra-structure, to reduce congestion at East Croydon.
1. Most trains to/from London bridge to be re-routed via the local (slow) lines at East Croydon, including all Thameslink services that run via Redhill. This would reduce conflict at Windmill Bridge Jct. between up fast London Bridge and down fast Victoria services and also at Stoats Nest Jct. where up services from Redhill cross the down fast line. Disadvantage: more conflict at S.Croydon where the up Oxted services cross local down line.
2. Reduce as far as possible the number of services between Victoria and the slow lines at East Croydon by re-routing all Caterham/Tattenham Corner services to run to/from London Bridge. This would eliminate the conflict that these services currently have at Selhurst where they cross the local Selhurst - West Croydon lines and where the up services cross the down fast from Victoria. Disadvantage: passengers would need to change at E.Croydon for Victoria.
3. Some Mid-Sussex line services (Bognor/Portsmouth/Southampton) to be re-routed via Sutton and Dorking. This would be most suitable if more of these services could work to/from London Bridge, as these could run on the fast line between London Bridge and Norwood Jct. and then calling at W. Croydon, Sutton, Dorking and Horsham where they would resume their normal route. The resulting train pathways through Sutton/Epsom would need some thought to avoid conflict with local services but the traffic density through this route is less than through E. Croydon so should not be a major problem. This change would also reduce conflict at Three Bridges, where down Mid-Sussex services have to cross the up fast Brighton line. In addition, it would provide more fast services between Dorking, Sutton and London Bridge. Disadvantage: increased journey times to/from Horsham and beyond as the Sutton/Dorking route is slower than the Brighton mainline.
To compensate for the resulting reduced service between Three Bridges and Horsham, Thameslink trains that currently terminate at Gatwick could be extended to Horsham.
Some of the Mid-Sussex Victoria services could be routed via Mitcham Jct. (as was the case until the 1970s) although this is less useful as it would introduce conflict at Streatham North Jct. where the down services towards Mitcham would need to cross the up fast to Victoria.
EXTENSION OF LONDON OVERGROUND CRYSTAL PALACE TO CLAPHAM JCT.
I propose extension of London Overground (LO) services from Crystal Palace to Clapham Jct. (via Balham) where they could then continue over the West London line to Willesden Jct. This would form a sort of "outer circle" and would bring a further five stations onto the LO network, namely:- Gipsey Hill, W. Norwood, Streatham Hill, Balham and Wandsworth Common. The service would be 4tph in each direction.
The advantages:
By providing a direct service from the above stations to both the East London line (Whitechapel/Shoreditch) and the West London line (Shepherds Bush/Willesden) journey times would be considerably reduced.
Reduced congestion on platforms/walkways at Clapham Jct. as these passengers would no longer have to change for LO services.
Increased frequency of services between Clapham Jct. and Crystal Palace.
One problem is that the line between Balham and Clapham Jct. is busy - 16tph in each direction in peaks and the Westbound LO services would need to cross the down local line from Victoria twice:- at Balham Jct. and at Clapham Jct. (as they would need to enter plat. 16). The potential congestion could be alleviated somewhat by truncating the London Bridge - Victoria southern service so that it terminates at Crystal Palace; not ideal but would have the advantage of freeing up some platform space at Victoria. The Victoria - W. Croydon service via Crystal Palace would remain, so there would still be an overall increase in services on the Crystal Palace - Clapham Jct. section (6tph compared to 4tph at present).
Any comments on these ideas would be welcome.
Peter Stanley
I present proposals to tackle the "Croydon Bottleneck" and improvements to services in South London.
CROYDON BOTTLENECK - some interim proposals
I am in general agreement with the proposals for solving the "Croydon Bottleneck". However, given that the project is unlikely to be completed for another 12-15 years, a large percentage of present-day commuters (especially those over 45) will not experience the benefits. I therefore suggest a few simple changes to timetables and routing that could be implemented now, with minimal cost and no changes to infra-structure, to reduce congestion at East Croydon.
1. Most trains to/from London bridge to be re-routed via the local (slow) lines at East Croydon, including all Thameslink services that run via Redhill. This would reduce conflict at Windmill Bridge Jct. between up fast London Bridge and down fast Victoria services and also at Stoats Nest Jct. where up services from Redhill cross the down fast line. Disadvantage: more conflict at S.Croydon where the up Oxted services cross local down line.
2. Reduce as far as possible the number of services between Victoria and the slow lines at East Croydon by re-routing all Caterham/Tattenham Corner services to run to/from London Bridge. This would eliminate the conflict that these services currently have at Selhurst where they cross the local Selhurst - West Croydon lines and where the up services cross the down fast from Victoria. Disadvantage: passengers would need to change at E.Croydon for Victoria.
3. Some Mid-Sussex line services (Bognor/Portsmouth/Southampton) to be re-routed via Sutton and Dorking. This would be most suitable if more of these services could work to/from London Bridge, as these could run on the fast line between London Bridge and Norwood Jct. and then calling at W. Croydon, Sutton, Dorking and Horsham where they would resume their normal route. The resulting train pathways through Sutton/Epsom would need some thought to avoid conflict with local services but the traffic density through this route is less than through E. Croydon so should not be a major problem. This change would also reduce conflict at Three Bridges, where down Mid-Sussex services have to cross the up fast Brighton line. In addition, it would provide more fast services between Dorking, Sutton and London Bridge. Disadvantage: increased journey times to/from Horsham and beyond as the Sutton/Dorking route is slower than the Brighton mainline.
To compensate for the resulting reduced service between Three Bridges and Horsham, Thameslink trains that currently terminate at Gatwick could be extended to Horsham.
Some of the Mid-Sussex Victoria services could be routed via Mitcham Jct. (as was the case until the 1970s) although this is less useful as it would introduce conflict at Streatham North Jct. where the down services towards Mitcham would need to cross the up fast to Victoria.
EXTENSION OF LONDON OVERGROUND CRYSTAL PALACE TO CLAPHAM JCT.
I propose extension of London Overground (LO) services from Crystal Palace to Clapham Jct. (via Balham) where they could then continue over the West London line to Willesden Jct. This would form a sort of "outer circle" and would bring a further five stations onto the LO network, namely:- Gipsey Hill, W. Norwood, Streatham Hill, Balham and Wandsworth Common. The service would be 4tph in each direction.
The advantages:
By providing a direct service from the above stations to both the East London line (Whitechapel/Shoreditch) and the West London line (Shepherds Bush/Willesden) journey times would be considerably reduced.
Reduced congestion on platforms/walkways at Clapham Jct. as these passengers would no longer have to change for LO services.
Increased frequency of services between Clapham Jct. and Crystal Palace.
One problem is that the line between Balham and Clapham Jct. is busy - 16tph in each direction in peaks and the Westbound LO services would need to cross the down local line from Victoria twice:- at Balham Jct. and at Clapham Jct. (as they would need to enter plat. 16). The potential congestion could be alleviated somewhat by truncating the London Bridge - Victoria southern service so that it terminates at Crystal Palace; not ideal but would have the advantage of freeing up some platform space at Victoria. The Victoria - W. Croydon service via Crystal Palace would remain, so there would still be an overall increase in services on the Crystal Palace - Clapham Jct. section (6tph compared to 4tph at present).
Any comments on these ideas would be welcome.
Peter Stanley