Is the Caledonian Sleeper between Aberdeen and London Euston now necessarily only operating to/from south of Dundee.
Thanks for clarifying, Sprinter150.
National Rail website says line closed until end of day, Weds Sept 2nd, 19 days away. I believe, for whatever reason ,its being treated as a crime scene by the Police, not sure if its BTP or Police Scotland .Has anyone more info?
Access by narrow road looks to be a problem given the soggy ground. Where will any rail-borne cranes have to come from ?
I hope this this thread covers all the recovery.
It does state that the derailment occurred well before the viaduct so it is likely that there will be track damage to the down line. The bridge itself will need a thorough inspection to ensure it is safe to use prior to track repairs, though being double track will make repairs more straightforward using rail.The RAIB accident description does not say much about the extent of damage other than that a section of bridge parapet was destroyed.
Believe me, there are two power cars in the view. Not easy to see though, it’s so blackened.I watched the footage on the news. All I ever see is 3 carriages in a piled up state and one on the verge that looks burnt out and 1 power car. Strange it would look burnt out or did the carriage slide and get scraped by rocks?
It does state that the derailment occurred well before the viaduct so it is likely that there will be track damage to the down line. The bridge itself will need a thorough inspection to ensure it is safe to use prior to track repairs, though being double track will make repairs more straightforward using rail.
All of these factors which can only be done once investigations are completed will impact the reopening date.
All works will be completed as soon at is safe to do so - Network Rail and their contractors do have a good track record of repairs such as this, and remember they are are dealing with several other major track issues on the network at the same time with equal importance.
No it does not. Why make-up stuff?It does state that the derailment occurred well before the viaduct
This isn't making stuff up - it says the train derailed before the bend then continued for 100 yards then hit the bridge parapet. If you look at the report it is visible that the entire down parapet was taken out. Much as making assumptions is misplaced here, it appears that it hit the start of the parapet based on the apparent damage from photographs in the report and released from a variety of sources. Taking all this into account I see 100 yards away as well before the bridge - I wasn't suggesting it was a mile before.No it does not. Why make-up stuff?
It says: "the train struck a landslip covering the down line and derailed. As the track curved to the right, the train continued in a roughly straight line for around 100 yards (90 metres) until it struck a section of bridge parapet, "
I expect quite a few of us have thought that, but how long before a bridge do they usually start? I suspect not far enough to have helped here.I wonder if the extra rails fitted in the 4ft to protect some bridges and I think some viaducts in case of derailment would have helped keep the train from going over the side as it did in this case? No doubt the site didnt qualify for such protection as it stands, but maybe the standards could be revised after this event.
Based on some quick calculations I suspect the guard rails would have need to have started at least 60m before that end of the parapet.I expect quite a few of us have thought that, but how long before a bridge do they usually start? I suspect not far enough to have helped here.
Ive lifted this screenshot from LNER cab ride video posted on youtube from 11/5/20 not sure how close it is to day of filming.I wonder if the extra rails fitted in the 4ft to protect some bridges and I think some viaducts in case of derailment would have helped keep the train from going over the side as it did in this case? No doubt the site didnt qualify for such protection as it stands, but maybe the standards could be revised after this event.

This picture really does say a thousand words about the remote nature of the Carmont disaster site (bottom left) and the difficulties and challenges of access to recover the vehicles by road. The nearest public road runs across the top of the picture
ScotRail has introduced a shuttle service between Aberdeen and Stonehaven to keep customers in the north east moving.
The new shuttle service, which was introduced on Monday, calls at Aberdeen, Portlethen, and Stonehaven, with some services extended to start or terminate at Inverurie or Dyce. A replacement bus service remains in place between Dundee and Stonehaven.
That seems quite a long time, but then I guess in the competition for resources Edinburgh-Glasgow is naturally going to win.The updates I get through work (I work for NR) suggests they are currently aiming for reopening in late October.
I know that, but two months seems quite a while unless the bridge needs some rebuilding?They haven't been handed the site by the RAIB - expected at the end of the week. They're having to build an access track from the nearest (minor) road, capable of taking heavy lifting equipment. A Google search will bring up pictures.