Well, yes a flyover is more expensive, but much, much more useful.
Hence why I put that usefulness in the list of pros...
Hows does extending services planned to turn back at OOC muck up a "simple service pattern"? ...and yes, it does increase the risk of performance pollution, but then Crossrail already shares the GWML and GEML slows with freight. There is scope for segregation along the Chiltern route to mitigate this.
Service pattern is a simple OOC-Shenfield, GWML-Abbey Wood. This is done deliberately so that a service through the core only leaves the dedicated tracks on one side of the core to keep it simple and reliable and less affected by the interactions with other trains on the same tracks.
Somehow the ECML manages to flight services over the Welwyn Viaduct and maintain capacity. Suggesting a viaduct miles away would not offer any relief to the terminus is clutching at straws somewhat.
Calling upon Welwyn - a frequently cited bottleneck on the ECML - as if it was some big trump card is rather clutching at straws! While you've certainly created more space at the terminus (providing you close the inner stations, or at least continue to serve them poorly, undermining the key reason to relieve Marylebone) by removing services from it, you can't get to the terminus (other than from Aylesbury) as Lizzy's taken up the paths further up the line!
4tph Crossrail + 6tph Chilterns to Banbury/Aylesbury/Oxford/Birmingham is the same as runs on the two track section with no intermediate stations south of Neasden. It's 2tph more than currently through Denham, and the same as the number NR reckon is the max on that two-track railway through Beaconsfield (they have a further 2tph as far as Gerrards Cross) post upgrading with loops, digital railway, electrification, etc (they don't call it 'unconstrained' for nothing!). As I said, best case is 6tph Crossrail, and you've blocked any frequency upgrades further north than that (which happen under NR plans) unless you run Crossrail to Banbury, Aylesbury via HW, etc...
Add in that flighting works on lines like the WCML and ECML because of the high number of fast trains that branch off before stopping. It makes little sense on the Chiltern Mainline mid-distance/'mainline' services, where you are trying to create evenish intervals at places like Princes Risborough, Haddenham, Bicester (split over two) and instead having 2 services stop a couple of minutes apart then a big gap due to the flighting. And even headways at Gerrards X, etc too: if you flight the other trains, you'll create bunching and long gaps in the stopping services too.
unless second viaduct was absolutely required. It would be be far less controversial than Welwyn, too.
True, but a second viaduct won't be cheap - not that you are at all bothered by budgets.
Plenty of chance of a proper Chiltern metro, that's exactly what Crossrail would be.
No, that would be a metro in the Chilterns - a good thing, but a totally different thing to 'Chiltern Metro', which is a specific term relating to Sudbury, Northolt Park, etc. Of course, a 'Chiltern Metro' doesn't preclude a metro service in the Chilterns - but your method of getting a metro in the Chiltern precludes 'Chiltern Metro'.
Those stations are almost certainly not needed
The argumentation you and others have used to justify this have been shown to be entirely based on ignorance: "other routes are way faster" "this other station is only a 5 minutes walk away".
and if you really, really feel the need for Wembley Stadium to have another station, build a Jubilee branch from Neasden to soak up that spare capacity.
Classic mr_jrt throw-tons-of-money around to fix problems created by already expensive 'solutions'.
It's pretty obvious that for you, when it comes to your schemes, that money is no object - ie who cares about real-world issues: just build a second viaduct, build a new tube branch, build an expensive junction...
Whilst removing services from South Ruislip to Marylebone might not seem as useful without full segregation to enable more mainline services
So what was all that stuff about Welwyn not damaging capacity then?
it does however free up paths from Neasden to Marylebone
2 paths. Just 2.
which can then be used for more services via Amersham, enabling Chiltern to take over the service west of Ricky
I've, at length, thoroughly debunked this nonsense these past few days, in other threads, to the point where I'm sick of it. You need at least 10tph at peak times just to keep the frequency (and you still won't have the capacity even with train lengthening to 6-car, which is all you can physically do at Rickmansworth) - you've found 2 more paths, allowing 6tph - where are the other 4 coming from??
potentially routing their future Milton Keynes services that way, freeing up paths south of Princes Risborough, which could then be used for more Crossrail services.
You do realise that the point of running the MK service south of Aylesbury via the slower route via High Wycombe is to specifically link MK with Wycombe, right? It's not about London at all - hence why it's a service planned on running to Old Oak Common, rather than Marylebone.