YorkshireBear
Established Member
- Joined
- 23 Jul 2010
- Messages
- 9,668
If they were converted, would there be any performance benefits? Or the fact its a conversion does that remove the usual performance advantages of EMU's over DMU's?
If they were converted, would there be any performance benefits? Or the fact its a conversion does that remove the usual performance advantages of EMU's over DMU's?
The capacity won't really increase, as there are a mix of 4, 5, and 7 coach unitsAdding a coach with OHLE equipment will increase the capacity and perhaps the train might accelerate a bit faster
Thank you![]()
is it the same case with voyagers?
Doesn't this all sound a bit like a cheap solution for the Bi-Mode IEP?
I was on such a service last year, which was losing time throughout, and on climbing Beattock it was clear it needed at least four engines :I seem to recall voyagers only need 3 of 5 engines to keep to time
The Voyagers can also be extended with a pantograph coachis it the same case with voyagers?
You don't need to convert anything on that train actually. it's a normal electric train already which has an onboard electric powerplant (using diesel) to feed the electric engines. Adding a coach with OHLE equipment will increase the capacity and perhaps the train might accelerate a bit faster.
The capacity won't really increase, as there are a mix of 4, 5, and 7 coach units
Adding a pantograph car would allow the shorter sets to be increased to 6 coaches and the longer sets also reduced to 6 coaches
Make all the Class 222 units the "same length", so some sets would gain both a pantograph coach and one or two coaches (from below)It doesn't matter how you to try to dress it up, adding another coach WILL increase capacity. Where on earth have you got the idea about REMOVING a coach to add a pantograph from?
Capacity won't increase in real terms; in effect all the sets become the same capacityYou are still categorically wrong to say that capacity would not increase by adding an extra coach
Capacity won't increase in real terms; in effect all the sets become the same capacity
Most TOCs are experiencing increases in passenger numbers and so capacity is decreasing in real terms, as such they are increasing fares in order to manage capacity
Even a basic example like the West Coast Voyagers, increasing these by one pantograph coach increases the capacity of the unit, but for the route the capacity actually decreases in real terms
It is similar with the Pendolinos, the trains will be able to carry more passengers, but the capacity on the route is decreasing
Even a basic example like the West Coast Voyagers, increasing these by one pantograph coach increases the capacity of the unit, but for the route the capacity actually decreases in real terms
It is similar with the Pendolinos, the trains will be able to carry more passengers, but the capacity on the route is decreasing
I'm struggling with that one. How is the capacity decreasing on the route ??
Perhaps how many trains can be run within time of each other, but how would 11 cars of pendolino reduce capacity on a route?
I've answered the questionOr, more likely, rail-britain is out of his depth again and will probably not be seen in this thread any more as usually happens when questions about his nonsensical statements are asked.
I've answered the question
Unit capacity increases, but route capacity decreases
Information is available based on passenger figures since 2005
However passenger numbers are apparently falling...
I still fail to see how route capacity decreases ?? Will the extra 48 metres of a Pendo suddenly cause huge delays on the WCML ?? I just dont get it![]()
Train (unit) capacity increases
Passenger numbers increase
Therefore capacity decreases in real terms
By the time such rolling stock has entered service there is in effect a decrease in capacity
Take the Class 390 as an example
These will be increasing by two coaches
However passenger numbers will have increased by 22% since the coaches were ordered in 2008 and enter service in 2012
More passengers, less seats
Adding a coach with OHLE equipment will increase the capacity and perhaps the train might accelerate a bit faster.
Er, did you do physics at school?
Adding a trailer coach for the pantograph, transformer and traction control electronics adds weight to the overall formation without adding any power which will make the performance worse. No amount of short-fuelling is going to make up for this extra weight, especially when the trailer fills up with punters.
Besides, a bi-mode (D)EMU makes for a very poor electric train because of all the dead weight they would be required to tote around.
As for the wider question covering Voyagers, I still believe that this is a pointless folly. I have no figures to back this up (but then nor does anyone else, but that hasn't prevented some pretty bold claims), but I would suspect that any energy saved from running in electric mode would be lost in the additional energy required to shift the unpowered pantograph trailer away from the wires. In fact, it could turn out to be a MORE expensive solution.
In any case, it would seem that each car's traction equipment is a stand-alone system and that all the engines combined are not generating a common traction supply to be shared among the traction motors spread throughout the train.
In fact, I'm still reeling from the fact that the Voyager family has an engine and generator set under each coach rather than one big engine and generator for the entire set like the Cl210's and their forebears on the Southern. In what universe was this considered a good idea?
As I understand it, that is true for the 220/221 Voyagers, but the 222 Meridians do have a power bus, something to do with the original specified 9-car formations not requiring a full 6750hp, which may support the idea that there is enough "spare power" to add an a non-generating coach to the formation.
Powering motors on a non-generating vehicle would require a power bus, but the issue is still clouded.
Even if a bi-mode (D)EMU could be designed from scratch I would still oppose the idea. What we need is a proper programme of rail electrification that provides more long distance trunk routes and feeder services running under the wires. If trains running under the wires really have to be electric then let them be proper electric trains in order to run with maximum efficiency. If it means a change of train at Birmingham or elsewhere then so be it.
O L Leigh
No.You don't need to convert anything on that train actually. it's a normal electric train already which has an onboard electric powerplant (using diesel) to feed the electric engines.