thebigcheese
Member
- Joined
- 2 Jan 2012
- Messages
- 165
Moderator note: Split from https://www.railforums.co.uk/thread...unding-for-hoo-sharnal-street-station.205468/
How about an extending the Medway Valley line? It's 2/3 car services could be ideal for the Hoo route.
The provisional services are for a two trains per hour peak service to London (via Gravesend/Dartford/Lewisham) via the existing chord on the North Kent Line and an all-day service to Strood (via a reinstated chord). Ideally this service would be extended to the Medway towns.
How about an extending the Medway Valley line? It's 2/3 car services could be ideal for the Hoo route.
Last edited by a moderator:
