py_megapixel
Established Member
There have been some rumours recently of Northern ordering battery-fitted cars for some 3-car 331s to make them into battery-electric multiple units (BEMUs) so that they can run up the Windermere branch. The length of this branch is approximately 10 miles.
My reasons suggesting that applying this to the Buxton line might be a good idea is as follows:
Also, once (if?) the 769s appear on Southport-Alderley, two thirds of the Sprinters on the rather congested section between Manchester and Stockport will be serving this line alone. Replacing them with much faster 331s would surely improve time-keeping, if only slightly.
My reasons suggesting that applying this to the Buxton line might be a good idea is as follows:
- The BEMU 331 would be able to do a whole round-trip of the Windermere branch without charging (i.e. Oxenholme -> Windermere -> Oxenholme) which is a total distance of 20 miles
- The Buxton line is already electrified between Manchester and Hazel Grove, and the distance from Hazel Grove to Buxton is 16 miles. I know the Buxton line isn't the most efficient because of its hilliness and very frequent stops, but if the extra "4 miles" of range aren't enough I can't see why a variant shouldn't be ordered with two battery-fitted cars instead of just one
- Trains generally have quite a long layover at Buxton, so some form of charging could be implemented, possibly just involving a very short section of third rail which is only the length of the station platform, which could get it back to Manchester again.
Also, once (if?) the 769s appear on Southport-Alderley, two thirds of the Sprinters on the rather congested section between Manchester and Stockport will be serving this line alone. Replacing them with much faster 331s would surely improve time-keeping, if only slightly.