Depends what you mean by the wagon control system. I am suggesting that each wagon still has a conventional air brake in addition to the ECP control unit, and that would apply the brakes in the event of loss of train line pressure.
There have been installations that have done this in the US, but at a significant extra cost per wagon so fitted.
IIRC it was about $2,000 per wagon, so given the costs in the railway in the UK, not really anything.
I suppose the ultimate question is how much you are willing to trust the computers in the wagons not to fail wrong side.
EDIT:
In summary, if it can be done for such a price - we should probably do it as you say.
Its probably cheaper than the computer reliability engineering.
If you're prepared to rely on that, why not just let them put that figure into the "system" and be done with it?
Well the error of entering a number wrong is different from the error of not noticing that the figures on the display are wrong - they have different probabilities in human factors models.
After all you would instruct them to read off every wagon in the train and tick it off against their manifest checklist.
If the error is detected at any step in the process then you have detected the fault and the "everything is fine" mindset in the operator dissapears and they become more likely to notice the overall problem.
You could do that but have introduced an extra interface to the signaling system. And I thought the idea was to get rid of axle counters?
I was proposing to get rid of axle counters on plain line, not on areas where shunting may occur or junctions are located. Those being areas where all the trackside infrastructure has to exist regardless, so the cost plugging in some axle counters is minimised.
Even keeping the latter still eliminates a huge fraction of the total infrastructure.