GRALISTAIR
Established Member
Especially if we electrify the Chilterns out of London Marylebone etc.
Which neatly encapsulates one of the main priorities, removal of diesel from major cities.Especially if we electrify the Chilterns out of London Marylebone etc.
Exactly. And I swear I am not trying to regurgitate the boring north/south debate, but as it is London and Chilterns I would argue has to be high priority. Removing diesel from Birmingham New Treet also has to be extremely high priority too.Which neatly encapsulates one of the main priorities, removal of diesel from major cities.
Agreed. Whatever is said, London is our biggest city and it has nearly eliminated diesel (for passenger) so it makes sense to complete the process.Exactly. And I swear I am not trying to regurgitate the boring north/south debate, but as it is London and Chilterns I would argue has to be high priority. Removing diesel from Birmingham New Treet also has to be extremely high priority too.
Indeed so Sheffield has ZERO electrification at the moment and projects such as MML and then rolling would be a great start.Agreed. Whatever is said, London is our biggest city and it has nearly eliminated diesel (for passenger) so it makes sense to complete the process.
Obviously that process needs repeating around the country.
Ah yes, Polar Bear.1981 Electrification Report
I very much doubt the MML will get carried forward any time soon.
NR will be hoping to get the Chesterfield-Sheffield section paid for by HS2 after all.
And the Sheffield to Leeds section paid for by NPR.
It's interesting that the order of priority bore little resemblance to what actually happenedHaving skim-read the article, (I need to sit down & read it properly), I can't help but have a large sense of "deja-vu" when looking at that map. Although de-carbonisation wasn't on the agenda 40 years ago, the issue of what parts of the network to electrify (or not) was considered in some detail by BR back in the early 1980's. Here's a link to the report, which includes various options for increased network electrification.
1981 Electrification Report
The maps for each of the schemes can be found at the end of the report.
It's interesting that the order of priority bore little resemblance to what actually happened
For example Option 2 had comprehensive electrification for the MML and the Birmingham to Derby line, but cut ECML short at Newcastle
Indeed in Option 4 where large parts of the network are to be electrified, the lines to Kings Lynn and Hastings aren't included.
I seem to recall that when the ECML electrification was in the planning stage, there was some thought given to not wiring north of Newcastle.
Indeed so Sheffield has ZERO electrification at the moment and projects such as MML and then rolling would be a great start.
There absolutely was. I believe the plan was for loco swaps at Newcastle Central but I seem to recall from what I've read on the subject that BR managed to finagle the business case so that wiring to Edinburgh actually increased the BCR of the entire project despite increasing the capital cost.
The opposite of what Network Rail have done where materials for the cancelled bits of Great Western electrification have been sold off.Supposedly earlier schemes had accidentally on purpose ordered too many masts and then BR said that they could do it at a very low price because look at all these spare masts.
Probably apocryphal though.
It's interesting that the order of priority bore little resemblance to what actually happened
For example Option 2 had comprehensive electrification for the MML and the Birmingham to Derby line, but cut ECML short at Newcastle
Indeed in Option 4 where large parts of the network are to be electrified, the lines to Kings Lynn and Hastings aren't included.
The Southern is and always has been primarily a commuter railway. Economics of electrification works better on shorter but busier routes where less new infrastructure is needed but is used more intensively. This was particularly so with early forms of electrification like the third rail, more suited to that sort of duty than to high speeds or long distances. So most of the Southern is electrified already and the few routes that aren't are shown as Definite or Possible, except Romsey-Eastleigh and Salisbury-Exeter.After a quick skim of the maps, I was taken by the lack of any Southern Region electrification proposed.
I guess the Southern were particularly adept at making a business case out of infill and rolling stock cascades.
The Southern is and always has been primarily a commuter railway. Economics of electrification works better on shorter but busier routes where less new infrastructure is needed but is used more intensively. This was particularly so with early forms of electrification like the third rail, more suited to that sort of duty than to high speeds or long distances. So most of the Southern is electrified already and the few routes that aren't are shown as Definite or Possible, except Romsey-Eastleigh and Salisbury-Exeter.
In the same magazine Ian Walmsley makes a good case for lifting the effective prohibition on third rail, but points out that this would be for infills and it would be short-sighted to stick with third rail for major extensions such as Salisbury.
After a quick skim of the maps, I was taken by the lack of any Southern Region electrification proposed.
I guess the Southern were particularly adept at making a business case out of infill and rolling stock cascades.
Even the Weymouth electrification had the Traction motors recovered from the 4-REPs IIRCIt’s not often realised, and BR didn’t exactly shout about it, but the Southern infill electrification from the 80s often had their business cases significantly helped by not needing anymore trains to operate them. Hastings and Grinstead were both done this way, with rolling stock found from ‘efficiencies’ within the existing fleet. In reality, this meant other lines saw fewer and/or shorter trains.
Given the prospect of traffic levels for the next few years, there may well be a similar opportunity now.
Even the Weymouth electrification had the Traction motors recovered from the 4-REPs IIRC
It’s not often realised, and BR didn’t exactly shout about it, but the Southern infill electrification from the 80s often had their business cases significantly helped by not needing anymore trains to operate them. Hastings and Grinstead were both done this way, with rolling stock found from ‘efficiencies’ within the existing fleet. In reality, this meant other lines saw fewer and/or shorter trains.
Given the prospect of traffic levels for the next few years, there may well be a similar opportunity now.
Of course even Gatwick Express - intense 3rd rail electric service used converted HAP units for the push pull portion. Great use of assets.Yes, I've often thought that they must have had a good stock of outer-suburban/main line EMU's, particularly considering quite a large cull of HAP units had happenned in the early 1980's.
Of course even Gatwick Express - intense 3rd rail electric service used converted HAP units for the push pull portion. Great use of assets.
It’s not often realised, and BR didn’t exactly shout about it, but the Southern infill electrification from the 80s often had their business cases significantly helped by not needing anymore trains to operate them. Hastings and Grinstead were both done this way, with rolling stock found from ‘efficiencies’ within the existing fleet. In reality, this meant other lines saw fewer and/or shorter trains.
Given the prospect of traffic levels for the next few years, there may well be a similar opportunity now.
Agreed and perhaps that is what Shirres and CEBR et al are hoping for - hey look we have these surplus EMUs - we could electrify and there will be little extra cost - similarly wasn't the Northwest scheme predicated on use of Class 319s?The early 1980's weren't generally a good time for UK rail. Declining passenger numbers often produced surpluses of stock. As you have said, the Southern Region were quite canny in using this as a lever to extend the third rail (Portsmouth - Southampton was another one justified on that basis).
Yes, the Hastings CEPs in their Jaffa Cake livery looked pretty good for units built in 1066Yes, I've often thought that they must have had a good stock of outer-suburban/main line EMU's, particularly considering quite a large cull of HAP units had happenned in the early 1980's.
To be fair, the refurbished CEP's on the Hastings line had a rather more modern ambience than the thumpers !