Before I posted this thread I did some googling, and found a pdf from SPT that mentions it happening as part of Network Rails GRIP 3 plans.
I was ignoring that for the time being and focusing purely on the Largs branch and what it alone needs given the previous post was about the goods line alongside the passenger line.
Where are you finding the path to/from Glasgow Central for another 1tph?
It’s generally a straight section the whole way so don’t see how they couldn’t be the increase without any changes.
Never been on an Ayr fast that hasn’t arrived early at Kilwinning so could shave a few mins off it if increased.
Probably more benefit of increasing the speed through Gilmour Street would also take speed services Up more
Something they could do is maybe make the service to Ardrossan Town and Ardrossan Harbour a little bit more limited, as the usage isn't very high outwith ferry hours. They could run that along to Largs and maybe have a passing loop at West Kilbride as the two trains would meet there.
There could be a 30 minute frequency to Largs by means of one train each hour running as two units coupled together between Glasgow Central and Ardrossan South Beach, with the portions uncoupling for the Harbour and Largs. They could couple again at South Beach for the return.
That way, the 60 minute frequency is maintained for Town and Harbour stations at Ardrossan.
Straight enough track, only a 10mph increase. 2tph run fast from Glasgow - Ayr and 2 in opposite direction. Faster services for Ayrshire customers.On what basis do you say this?
Straight enough track, only a 10mph increase. 2tph run fast from Glasgow - Ayr and 2 in opposite direction. Faster services for Ayrshire customers.
Something they could do is maybe make the service to Ardrossan Town and Ardrossan Harbour a little bit more limited, as the usage isn't very high outwith ferry hours. They could run that along to Largs and maybe have a passing loop at West Kilbride as the two trains would meet there.
And in this case, it gets you less than a minute. I’m surprised it got as far as a study.
Faster services for Ayrshire customers.
The approaches to Glasgow Central really need some simplification, the five loops between Central and Bridge Street are hardly ever used, so could be taken out and the eight running lines aligned together with higher speed crossovers to improve the current 15mph crawl from Bridge Street. I am always impressed by the approach to Paddington, as big and as complicated as Central, yet the approach speed seems much faster
Either a return to a more limited Harbour service, back when trains only met the ferry OR portion working?
Given the number of sets that run as 6/7/8 cars all day and the glacially slow coupling of the 380s I can’t see portion working being an option. Is there really no additional path per hour from Kilwinning to Bridge Street given Hunterston is basically gone for good.
Given the number of sets that run as 6/7/8 cars all day and the glacially slow coupling of the 380s I can’t see portion working being an option. Is there really no additional path per hour from Kilwinning to Bridge Street given Hunterston is basically gone for good.