• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Johnstone - Kilwinning 100mph

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

XC90

Member
Joined
4 Jun 2015
Messages
229
This definitely needs to happen. I dont see any major obstacles to increasing the speed.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,820
No, it's still 90mph.
Thanks, was wondering. Now there's so many non stop or nearly non stop services along that section, with class 380s that are well capable of that speed I thought there might have been some incentive to get it done, especially as it's in Scotland which never seems to struggle to fund rail improvement work.
 

Scotrail88

Member
Joined
21 Jul 2014
Messages
447
It’s generally a straight section the whole way so don’t see how they couldn’t be the increase without any changes.

Never been on an Ayr fast that hasn’t arrived early at Kilwinning so could shave a few mins off it if increased.

Probably more benefit of increasing the speed through Gilmour Street would also take speed services Up more
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,284
Location
Glasgow
Thanks, was wondering. Now there's so many non stop or nearly non stop services along that section, with class 380s that are well capable of that speed I thought there might have been some incentive to get it done, especially as it's in Scotland which never seems to struggle to fund rail improvement work.

Even if you extended 100mph running to the whole 90 section (Johnstone-Irvine) you aren't saving huge amounts of time.

Electrification and resignalling pushed linespeed from 75 to 90 in 1986, with the new timetable in 1987 journey time fell on average 9 mins. Given the Ayr semi-fasts are now non-stop to Kilwinning and 380s are faster accelerating than 318s and that hasn't reduced average journey times I don't see 100mph running making a jot of difference to be honest.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,284
Location
Glasgow
It’s generally a straight section the whole way so don’t see how they couldn’t be the increase without any changes.

Never been on an Ayr fast that hasn’t arrived early at Kilwinning so could shave a few mins off it if increased.

Probably more benefit of increasing the speed through Gilmour Street would also take speed services Up more

I think the present timetable has scope for tighter Glasgow-Ayr timings since the change to non-stop running to Kilwinning and faster accelerating 380s. The fact that timings are broadly unchanged overall since the 318s were introduced tells me that there is no desire or impetus to quicken timings and therefore it seems pointless to increase linespeed to 100mph for a time saving that would be less than could be made at present were the timings tightened to reflect what 380s and a clear run to Kilwinning can accomplish.
 

Scotrail314209

Established Member
Joined
1 Feb 2017
Messages
2,474
Location
Edinburgh
I definitely think they should increase the linespeed up to 100mph. However the track can be a bit too rough in places, Lochwinnoch was a particular bad spot for it at one point. Along with the 100mph upgrade they should certainly carry out work to allow a second train per hour to access Largs, as pre covid these services were able to fill up a single 380 quite early on.

As others have said, the track is relatively straight so you may actually be able to get a few minutes off the timetable. Paisley is also a hurdle because of the junction, but you can quite comfortably do 60mph through Platforms 3 and 4 imo.
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,562
Location
UK
Is the signal spacing designed for 90mph or is there sufficient spacing and sighting for 100mph ?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,284
Location
Glasgow
I definitely think they should increase the linespeed up to 100mph. However the track can be a bit too rough in places, Lochwinnoch was a particular bad spot for it at one point. Along with the 100mph upgrade they should certainly carry out work to allow a second train per hour to access Largs, as pre covid these services were able to fill up a single 380 quite early on.

As others have said, the track is relatively straight so you may actually be able to get a few minutes off the timetable. Paisley is also a hurdle because of the junction, but you can quite comfortably do 60mph through Platforms 3 and 4 imo.

I reiterate my point that increasing linespeed simply to have a higher speed is only worth it if you gain significant benefit. It's going to save a couple minutes at most, hardly seems value for money imho
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,284
Location
Glasgow
Is the signal spacing designed for 90mph or is there sufficient spacing and sighting for 100mph ?

The stuff I've seen from BR themselves made no mention of the spacing being suitable for 100mph, it being stated that the resignalling from semaphores to colour lights allowed trains to run at 90 second headways at 90mph against 5 minute headways at 75.
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
I reiterate my point that increasing linespeed simply to have a higher speed is only worth it if you gain significant benefit. It's going to save a couple minutes at most, hardly seems value for money imho
I've only used the route a couple of times but Johnstone to Kilwinning is just under 16 miles measured station to station. Assuming the train is doing 90 mph passing Johnstone and deaccelerates to stop at Kilwinning. Increasing the line speed from 90 to 100 with no intermediate reductions theoretically would reduce the journey time by around 45 secs.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,820
I think the present timetable has scope for tighter Glasgow-Ayr timings since the change to non-stop running to Kilwinning and faster accelerating 380s. The fact that timings are broadly unchanged overall since the 318s were introduced tells me that there is no desire or impetus to quicken timings and therefore it seems pointless to increase linespeed to 100mph for a time saving that would be less than could be made at present were the timings tightened to reflect what 380s and a clear run to Kilwinning can accomplish.

I've only used the route a couple of times but Johnstone to Kilwinning is just under 16 miles measured station to station. Assuming the train is doing 90 mph passing Johnstone and deaccelerates to stop at Kilwinning. Increasing the line speed from 90 to 100 with no intermediate reductions theoretically would reduce the journey time by around 45 secs.

I guess I can see now it wouldn't be worthwhile. I wonder if that's what Network Rail found out back in 2014?
 

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
11,933
Location
here to eternity
I wonder if that's what Network Rail found out back in 2014?

This thread appears to be based on some notion that NR looked at this in 2014:


Yet no one has provided any evidence to support this claim.
 
Last edited:

Carntyne

Member
Joined
8 Jul 2015
Messages
1,023
Solution looking for a problem I think!

Are you just delivering trains to Central's approaches earlier for them to sit and wait for a path into the station?
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
Solution looking for a problem I think!

Are you just delivering trains to Central's approaches earlier for them to sit and wait for a path into the station?

Also, with the ScotRail services here being largely independent of the rest of the rail network, it's not clear there's any major timetabling benefit either. It's not like the Argyle line services on the suburban WCML, which need to tie in with the ICWC expresses and thus everything down to Euston. Getting the yaw dampers fitted to the 320s to enable the 75->90mph speed increase was a necessity for the recent attempted project to get the Glasgow-London timing down.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,820
This thread appears to be based on some notion that NR looked at this in 2014:


Yet no one has provided any evidence to support this claim.

Before I posted this thread I did some googling, and found a pdf from SPT that mentions it happening as part of Network Rails GRIP 3 plans. Nothing newer then this though which is why I was wondering what happened since, if anything.

https://*******.com/y7orjpz8
 

Scotrail314209

Established Member
Joined
1 Feb 2017
Messages
2,474
Location
Edinburgh
Personally I think rather than upgrading the line speed, they should update Kilwinning - Largs a bit. You now have a practically redundant goods line sitting between Hunterston and just after Ardrossan South Beach. Would it be worthwhile electrifying the goods lines and constructing platforms at West Kilbride and Ardrossan South Beach? Would allow 2tph down to Largs which would be a welcome increase
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,284
Location
Glasgow
I guess I can see now it wouldn't be worthwhile. I wonder if that's what Network Rail found out back in 2014?

Don't get me wrong, I'm all for increasing speeds but you have to spend the money you've got sensibly and I think any money for a relatively small linespeed increase and small benefit would be better put towards say further electrification or other infrastructure improvements.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,284
Location
Glasgow
Personally I think rather than upgrading the line speed, they should update Kilwinning - Largs a bit. You now have a practically redundant goods line sitting between Hunterston and just after Ardrossan South Beach. Would it be worthwhile electrifying the goods lines and constructing platforms at West Kilbride and Ardrossan South Beach? Would allow 2tph down to Largs which would be a welcome increase

The goods line is the former up line, the line was singled on electrification to enable the OLE to fit the bridge clearances on the northern section of the branch without rebuilding the bridges. I think you could manage 2tph with just a passing loop which might be easier to do than re-doubling the entire Largs branch and sorting out the bridge clearances.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,284
Location
Glasgow
This thread appears to be based on some notion that NR looked at this in 2014:


Yet no one has provided any evidence to support this claim.

I think it was mentioned when the 380s were being introduced that linespeed to Ayr would be increased to 100. Whether that was am aspiration or merely an assumption based on the higher top speed of the 380s compared to the rest of the Strathclyde electric fleet is difficult to be sure of
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,284
Location
Glasgow
I've only used the route a couple of times but Johnstone to Kilwinning is just under 16 miles measured station to station. Assuming the train is doing 90 mph passing Johnstone and deaccelerates to stop at Kilwinning. Increasing the line speed from 90 to 100 with no intermediate reductions theoretically would reduce the journey time by around 45 secs.

It is about 16 miles give or take a few chains, 90mph is continous from about 0.5mi past Johnstone through Kilwinning to Barassie (22mi 45ch in all) with one further 3mi 65ch 90 section from North of Prestwick Airport to before Newton-on-Ayr.

The second section is sufficiently short that there would be no benefit at all in increasing the speed limit to 100 especially given that it's followed by a 50 limit going through Newton-on-Ayr so you have next to no time to accelerate from 75 to 90 before braking for the 50 presently. Plus Prestwick Airport and Prestwick Town are both within that 90 section and all trains call so again I doubt you can make use of the present 90 limit let alone an increase.
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
It is about 16 miles give or take a few chains, 90mph is continous from about 0.5mi past Johnstone through Kilwinning to Barassie (22mi 45ch in all) with one further 3mi 65ch 90 section from North of Prestwick Airport to before Newton-on-Ayr.

The second section is sufficiently short that there would be no benefit at all in increasing the speed limit to 100 especially given that it's followed by a 50 limit going through Newton-on-Ayr so you have next to no time to accelerate from 75 to 90 before braking for the 50 presently. Plus Prestwick Airport and Prestwick Town are both within that 90 section and all trains call so again I doubt you can make use of the present 90 limit let alone an increase.
Was there much traffic at Prestwick pre covid? I was on a Easyjet flight diverted there from Glasgow about 2 years ago and I got the impression that they were opening the terminal building up specially for us to get on our coaches. Cutting out the airport station stop would save more time than a linespeed increase. The 2 stations appear to only be 38 chains apart less than 1/2mile.
 

Mordac

Established Member
Joined
5 Mar 2016
Messages
2,386
Location
Birmingham
Was there much traffic at Prestwick pre covid? I was on a Easyjet flight diverted there from Glasgow about 2 years ago and I got the impression that they were opening the terminal building up specially for us to get on our coaches. Cutting out the airport station stop would save more time than a linespeed increase. The 2 stations appear to only be 38 chains apart less than 1/2mile.
PIK has been on life support for ages. If the Scottish government hadn't bailed it out, it would have closed long ago, at least to passenger operations (it likely would have remained opened for other purposes, IMO).
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,284
Location
Glasgow
Was there much traffic at Prestwick pre covid? I was on a Easyjet flight diverted there from Glasgow about 2 years ago and I got the impression that they were opening the terminal building up specially for us to get on our coaches. Cutting out the airport station stop would save more time than a linespeed increase. The 2 stations appear to only be 38 chains apart less than 1/2mile.

It's down to about 650k passengers a year for the airport and the station 104k.

Perhaps making it like Barassie and Newton-on-Ayr and only the stoppers and alternate semi-fast would call? Still make a 3tph service.
 

Carntyne

Member
Joined
8 Jul 2015
Messages
1,023
The goods line is the former up line, the line was singled on electrification to enable the OLE to fit the bridge clearances on the northern section of the branch without rebuilding the bridges. I think you could manage 2tph with just a passing loop which might be easier to do than re-doubling the entire Largs branch and sorting out the bridge clearances.
Where are you finding the path to/from Glasgow Central for another 1tph?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,284
Location
Glasgow
Where are you finding the path to/from Glasgow Central for another 1tph?

I was ignoring that for the time being and focusing purely on the Largs branch and what it alone needs given the previous post was about the goods line alongside the passenger line.
 
Status
Not open for further replies.

Top