https://www.railfuture.org.uk/article1855-Relieving-Castlefield
The proposed solution consists of three elements: The closure of Trafford Park Container Depot; A replacement depot on the site of the former Carrington Refinery and a chord between the WCML ( L&NWR in old money) and the Hazel Grove to Northenden link (Midland Railway/CLC)
This is attractive but what issues would you see arising from this idea? What sort of timescale would be feasible?
Since the opening of the Ordsall Chord, too many passenger services have been scheduled via the Castlefield corridor through Manchester’s Oxford Road and Piccadilly stations. Railfuture, through its Freight Group and Infrastructure and Networks Group, have come up with a response to the challenge of the Castlefield Corridor with a particular focus on freight movements.Due to their length, freight trains take up twice the line capacity of passenger trains. For reliable operation, a line should only operate at 85% capacity. At Castlefield it is pressed to 93% with delays and cancellations a regular occurrence. Freight currently has no choice but to use this route every hour and cannot deploy some of the tricks passenger services use to recover from late running. It cannot turn back short of its final destination and ask its cargo to catch the next train or leave out stops to recover time if it’s journey is delayed. But, as freight doesn’t complain on social media when it is late or cancelled, it is a popular target for politicians looking for a solution.Before advancing a potential solution, we had to consider how we want freight to develop in future. As batteries can never match the energy density of road fuel and therefore not suitable for long distance road haulage and demand for freight movement by rail will far exceed that of today, almost certainly outgrowing capacity at Trafford Park. Is it now time to look for another site? If so, where?
The proposed solution consists of three elements: The closure of Trafford Park Container Depot; A replacement depot on the site of the former Carrington Refinery and a chord between the WCML ( L&NWR in old money) and the Hazel Grove to Northenden link (Midland Railway/CLC)
This is attractive but what issues would you see arising from this idea? What sort of timescale would be feasible?
Last edited: