backontrack
Established Member
Altnabreac's 5 golden rules of a successful rail reopening:
- Population of 10,000+
- 60 minutes (75 at a push) journey time of a major employment centre.
- Extant or mainly unobstructed trackbed
- Ability to extend an existing service so more terminal capacity is not required.
- Regeneration potential of a deprived area
Let's take a look at Whitehaven–Cleator Moor–Frizington in Copeland.
The Cleator Moor station would be in the centre of town under Leconfield. In terms of the preserved alignment, the Frizington station – at the foot of Parkside Road – is too far out of the way to be useful; a station at Yeathouse Road, midway between the closed stops at Yeathouse and Winder, has more potential to be useful for passengers. Seeking a new alignment from Frizington Park to the Newtown area of Frizington might be a desirable solution, though more costly.
• 7,000 in Cleator Moor, 3,600 in Frizington, 1,000 in Moor Row. [1 point]
• Less than 60 minutes to Whitehaven and Workington; additionally Carlisle could be reached in 100 minutes, though that may be pushing it [1 point]
• Entirety of the trackbed from Winder to Mirehouse Junction is extant as part of the southern branch of the c2c cycle route. Possibly new alignment required at Frizington end [0.5 points]
• There are still some peak-time Carlisle-Whitehaven services, but most have already been extended though to Barrow [0.5 points]
• Some potential for regeneration of the area, particularly Cleator Moor [1 point]
Probably scores 4 points on balance.
A few more thoughts.
• The connection would have to be reinstated at Mirehouse Junction
• In terms of the future of the line, an aspiration could be for a certain Carlisle-Whitehaven frequency with extensions to either Frizington or Barrow. The Cleator Moor services could potentially pick up the Dalston and Aspatria calls from the Barrow services (though Flimby, Harrington, Parton and Corkickle passengers want to get to Sellafield)
• A major centre of population for Moor Row, Cleator Moor and Frizington is Sellafield. Therefore, you probably can't open a railway to Frizington without first reinstating the loop and the third platform at Whitehaven so that interchanging from the Cleator Moor branch to Barrow services is easy. (And if you're going to have two platforms somewhere, wouldn't Corkickle be more useful than Whitehaven? It's directly south of the tunnel and would be the easiest for this kind of interchange)
• Cleator Moor is well-positioned for the road to Ennerdale, so throw that in if you want to
• Perhaps even a shuttle to and from Whitehaven (reversing into the north-facing bay platform) could be worthwhile. Mondays-Fridays, there's five buses an hour from Cleator Moor to Whitehaven, four of which start in Frizington (and two of which continue to Maryport via Workington and Harrington).
Probably a bit of a no-hoper, but I'd be interested to see peoples' thoughts.
Last edited: