I doubt they will upgrade the mk5s, the fleet is only 18 carriages making the cost high as I doubt CAF will still be able to easily make them in 5 years. I would expect them to convert mk4s into sleepers and to work with 67s. Or to order customised 9 car 802s which some carriages have sleeping berths instead of seats.Would they not keep the current setup of 57s and Mk3s for maybe 5 years and then replace the locomotives when they presumably upgrade to Mk5s? Is there a reason why the 57s need replacing sooner than the Mk3s?
Yeah I could see the 802s, either way, I'm not sure why the 57s would need replacing before the Mk3s.I doubt they will upgrade the mk5s, the fleet is only 18 carriages making the cost high as I doubt CAF will still be able to easily make them in 5 years. I would expect them to convert mk4s into sleepers and to work with 67s. Or to order customised 9 car 802s which some carriages have sleeping berths instead of seats.
The mk 3s had a refurb, they will need replacing but I don't think mk5s are the answer due to the high cost.Yeah I could see the 802s, either way, I'm not sure why the 57s would need replacing before the Mk3s.
As part of the GWR extension replacement of the Class 57s is expected. I wonder whether class 88 or 89 locos would work?
Sorry to ask but where does it say about the 57's being replaced? I will say though, what about Class 68's? 3,800hp vs like 2,500 (I watched a Paddington 24/7 programme and the narrator said it had a 2500hp engine and is a thirsty beast).
How come the 57's are being replaced all of a sudden? Surely they're more reliable than when they were Class 47's at 30 years old?
Modern Railways May edition page 9 in the section on Sleeper planning
Underfloor engines for a sleeper train!!I doubt they will upgrade the mk5s, the fleet is only 18 carriages making the cost high as I doubt CAF will still be able to easily make them in 5 years. I would expect them to convert mk4s into sleepers and to work with 67s. Or to order customised 9 car 802s which some carriages have sleeping berths instead of seats.
Underfloor engines for a sleeper train!!
It’s irrelevant for this topic though. You aren’t going to run the sleeper with one.As a matter of interest, what’s the distance a Class 88 can cover when working on Diesel Power?
Teething problems and brake problems I would classify as differentI'll be very honest, I can see problems emerging if Mark 5 Sleepers were the replacement stock - I've more faith in a Mark 3-hauled 57 than a Mark 5 sleeper at the moment, should I travel in a sleeper. Yes there's teething issues with anything new at first but the teething issues were pretty major I believe.
That was a rather terse replyIt’s irrelevant for this topic though. You aren’t going to run the sleeper with one.
Could the sleepers not be converted to HST-style carriages?Therefore unless you propose converting HSTs to be sleepers, your idea is not viable.
90s would be useless over the Devon Banks...Class 67s are available as quite a few are in storage, the mk3s got refurbished quite recently so I can't see them going for a while. This is a long term plan, we could see something short term but the most I would expect is 67s swapped in for 57s. DB Cargo also have quite a few 90s stored a crewe, maybe we could see them just swap locos at a station, both 67s and 90s can work with a mk3 DVT, lots of which are in storage.
If refurbishing why not convert loco hauled Mk3s into HST-style power or vice-versa?My understanding is that the 67s cannot be easily used with the sleeper stock, as they are only fitted with AAR multiple working equippment that requires a large jumper cable running the length of the train, for which the DVTs have been specially fitted.
The traditional DVT control mechanism is via TDM on the RCH lighting control jumpers that are provided on all BR era hauled stock as a matter of course.
So work would be necessary on the 67s regardless, unless a far more extensive refurbishment of the hauled stock is undertaken at the same time.
Could the sleepers not be converted to HST-style carriages?
That's why I suggested the a 90 and DVT till the station in which the electrification stops, then the 90 gets swapped out for a 67 the rest of the way.90s would be useless over the Devon Banks...
Will the line ever get wired into Devon and Cornwall?That's why I suggested the a 90 and DVT till the station in which the electrification stops, then the 90 gets swapped out for a 67 the rest of the way.
Why on earth would anybody want to touch the Mk4s for sleeper duty? There is absolutely no need and no benefit what so ever - not to mention it'd be more expensive long term than Mk5s!I doubt they will upgrade the mk5s, the fleet is only 18 carriages making the cost high as I doubt CAF will still be able to easily make them in 5 years. I would expect them to convert mk4s into sleepers and to work with 67s. Or to order customised 9 car 802s which some carriages have sleeping berths instead of seats.
Depends what you're basing value for money on. For one, the ride quality and ambience is absolutely attrocious. That, plus storage space, is where Mk3 sleepers excel at. Though to be fair if that was ever done properly then you'd have a point as the design itself bar the mechanics really is remarkable.The only reason Caledonian Sleeper got the Mk5s is because ScotGov are willing to pay, and well, let's say they're getting what they paid for!
CAFs are known to be cheap for a reason!Depends what you're basing value for money on. For one, the ride quality and ambience is absolutely attrocious. Though to be fair if that was ever done properly then you'd have a point.
The well known abbreviation that many on the forum use, comes to mind. It's a great shame, as the design merrits a batter standard of rolling stock than what CAF have offered with their recent deliveries. No chance anybody envisaged how poor the quality would be. Would be very costly to rectify, and I highly doubt that'll ever happen.CAFs are known to be cheap for a reason!
Would it be possible for a GWR new build version to get rid of the defects without too much cost (either design or build cost)?The well known abbreviation that many on the forum use, comes to mind. It's a great shame, as the design merrits a batter standard of rolling stock than what CAF have offered with their recent deliveries. No chance anybody envisaged how poor the quality would be. Would be very costly to rectify, and I highly doubt that'll ever happen.
It depends when they order them, if they order them now then they might be able to get a tag on order for mk5s, similar to TPEs order. These would be rather cheap as lots of the costs for design and tooling have been taken care of by Caledonian Sleeper, if they order them in a couple years then they will be expensive as lots of the tooling for mk5s would likely be gone.Would it be possible for a GWR new build version to get rid of the defects without too much cost (either design or build cost)?
And using the price of the Scottish sleepers how much would a GWR fleet replacement cost - ’little’ enough for a political bone throwing to the far west?
Not really worth it if it goes via Newbury, as it often does. The train can go any one of four ways between Reading and Taunton: via Newbury (wires end at Newbury), via Box and Bristol (wires end somewhere around Chippenham), via Melksham (ditto on wires) and via Hullavington (wires end at Bristol Parkway). It's not ideal for doing loco changes at all given the variety of routes.That's why I suggested the a 90 and DVT till the station in which the electrification stops, then the 90 gets swapped out for a 67 the rest of the way.
Remember that it has taken 2-3 years for Wabtec to cough up half of the ScotRail HST sets, so that aspect puts off any sort of effort for TOCs where they're going off-lease by December, to PRM modify them. Hence why EMR are going half backsided by taking LNER HSTs rather than going for Wabtec on steroids. A wise move when they're binning them in under a year anyway!Well if ScotRail can make Inter7Citys work with refurb HSTs, I don't see why not in the short term Class 43s/HST converted PRM-TSI complaint, sleepers etc can not be used. 2030 will be something different.
I despair. You would think they would be hungry for businessRemember that it has taken 2-3 years for Wabtec to cough up half of the ScotRail HST sets, so that aspect puts off any sort of effort for TOCs where they're going off-lease by December, to PRM modify them. Hence why EMR are going half backsided by taking LNER HSTs rather than going for Wabtec on steroids. A wise move when they're binning them in under a year anyway!