Halifaxlad
Established Member
This started out as a very simple idea as an alternative to installing this cross over at Harrogate for LNER AZUMA services, as reported within the Harrogate Advertiser on the 17th January 2020 https://www.harrogateadvertiser.co....t-rail-station-infrastructure-problem-1368759
My initial idea was to use the wasted space that used to the up through road to move platform 3 inwards and make it into an island platform. So effectively having three through platforms, then I realized that if this was possible, a new lift and steps to the footbridge would have to be created. Then I thought why not simply move it inwards and create a separate York facing and Leeds facing bay platform upon the opposite side!
It would look something like this...
To get
My initial idea was to use the wasted space that used to the up through road to move platform 3 inwards and make it into an island platform. So effectively having three through platforms, then I realized that if this was possible, a new lift and steps to the footbridge would have to be created. Then I thought why not simply move it inwards and create a separate York facing and Leeds facing bay platform upon the opposite side!
It would look something like this...
To get