D365
Veteran Member
- Joined
- 29 Jun 2012
- Messages
- 13,195
I can’t see why open access operators would want to take Class 91s in favour of Class 90s, unless they have a significant need for 125mph running, or there aren’t enough Class 90s to go around.
and Grand Union are also wanting 91/MK4 sets for a stirling -Euston service https://twitter.com/Richard_rail/status/1223900702621290497
https://www.railforums.co.uk/thread...y-grand-central-and-start-spring-2020.165526/Do we have a thread dedicated to this proposal? I can't find one.
Apologies. Try this one: https://www.railforums.co.uk/thread...ndon-euston-to-stirling-from-may-2021.190237/The Grand Union Stirling proposal not the Grand Central Blackpool one.
Personally, I prefer the Mk4 to an Azuma, but there’s little in it and the quality of maintenance will make a big difference to my choice - the Mk4s are increasingly suffering from age and the inevitable winding down of maintenance.
I travelled from Edinburgh to London in a first class Mk 4 today, and couldn't see out the window due to a huge amount of condensation between the panes. Another window of the same carriage had the same problem. I've never seen that before.
As seen here on a 458: https://www.railforums.co.uk/thread...h-western-railway.148717/page-44#post-4417170Blown window seal - let's moisture in between the panes of glass, it condenses and if left unfixed for long enough you can eventually get several inches of water building up at the bottom between the panes and it then sloshes about as the train accelerates and brakes.
Indeed - but something I also don't recall on GNER/NXEC/ECR/VTEC/LNER, so suggestive that Hitachi have allowed maintenance standards on the Mk4s to fall since taking over responsibility.Blown window seal - let's moisture in between the panes of glass, it condenses and if left unfixed for long enough you can eventually get several inches of water building up at the bottom between the panes and it then sloshes about as the train accelerates and brakes.
I used to see it frequently in the past, but it seems to have become much less common in recent years. I guess the double glazing units they are fitting now are better sealed than they used to be.I travelled from Edinburgh to London in a first class Mk 4 today, and couldn't see out the window due to a huge amount of condensation between the panes. Another window of the same carriage had the same problem. I've never seen that before.
Just seen the Swallow liveried 91 roll into York. Glad these will be around for a bit longer![]()
Doesn't it look fantastic? It's a classic livery on a really impressive machine. Really glad they did that repaint.
Indeed. They did a good job.
To be fair, I saw it a lot at Leeds last year, then not at all as the Azumas came on line, so it's a bit of a reunion !

I travel between Edinburgh and London quite regularly, there's still quite a few Mark 4 sets on that.
I reckon the Azuma is an impressive train, but an ECML without HSTs and 91s is going to take some getting used to.
I used to see it frequently in the past, but it seems to have become much less common in recent years. I guess the double glazing units they are fitting now are better sealed than they used to be.
In latest release of RAIL magazine it says they want to retain 10 sets but whether that’s set in concrete I’m not too sureAny further details on number to be retained and or route they will be concentrated on?
Any further details on number to be retained and or route they will be concentrated on?
In latest release of RAIL magazine it says they want to retain 10 sets but whether that’s set in concrete I’m not too sure
The March 2020 'Modern Railways' says "Around 10 sets are expected to be retained" - note the 'around' in there which suggests they aren't entirely sure. Whether they will be dedicated to certain routes is unconfirmed, but it seemed pretty certain that they'll stay as 9-car rakes until Dec 2021 after which they may be reduced to 2+7.In latest release of RAIL magazine it says they want to retain 10 sets but whether that’s set in concrete I’m not too sure
An East Coast without Delt1c’s took a lot of getting used to ( still miss the smell, sight and sound)I travel between Edinburgh and London quite regularly, there's still quite a few Mark 4 sets on that.
I reckon the Azuma is an impressive train, but an ECML without HSTs and 91s is going to take some getting used to.
This must come as a bit of an embarrassment to the DfT who I assume wanted the entire ECML franchise to be IET operated. Is this a stop gap measure until all the IET sets are delivered and operating satisfactorily?
No, its because more services are planned for December 2021.
Class 91s hauling Mk 4s will remain with London North Eastern Railway until 2023.
Ten rakes of coaches and ten ‘91s’ will be used, with two additional spare ‘91s’ and a handful of spare Mk 4s also retained.
Initially all were due to have been withdrawn by the end of June. However, LNER has extended the life of certain locomotives and coaches until the end of next year to ensure it has sufficient trains to meet franchised timetable commitments. They are also needed to cover for unavailable Hitachi Azumas that require modifications to their inter-car connectors (RAIL 901).
The extension is until the end of 2023 while LNER sources brand new trains, which would take a minimum of around two years to build and deliver. The operator has previously told RAIL it needs around six new trains.
Details as to which Class 91s and Mk 4s will be retained have not been finalised, nor the routes on which they will operate.
Werrington diveunderSorry for going OT but which infrastructure projects will provide the necessary paths for these?
I think it’s great they’re keeping the 91 locomotive for longer!Beat me to it! Brilliant News! I wonder if they will be reduced to 7 carriages as per the original idea?