That makes more sense now, though to be a pedant, the xx.13 would need to be xx.14. Its a 13½ minute run to Euston to Watford with a stop for a 390. If the xx.09 is departing Watford at xx.24 then the xx.13 cannot be at Watford until xx.27. You cannot depart Euston on a ½ minute so leaving Euston at xx.14 removes the need for pathing time.
Ah, right. Thank you. That means that spare path becomes available only up to Bourne End, which is slightly annoying.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

PTR 444

Established Member
Joined
22 Aug 2019
Messages
2,647
Location
Wimborne
I think it would be nice to have Pendolinos regularly serving Northampton again, as the station is a major railhead for the region and only sees 110mph DMUs which aren’t really considered intercity. Perhaps a direct Euston - MKC - Northampton service should be established, which could then continue to Manchester or Liverpool via the Trent Valley.
 

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,107
Location
North Wales
2tph Trent Valley (Milton Keynes, Rugby, all stations to Crewe)*

*Could continue north. If it does terminate at Crewe, it would have to be run with a modified shoter Pendolino or bimode so it could fit in the longer south-facing bay platforms at Crewe

If you're stopping at all stations north of Rugby, you may well be running on the slows through Stafford. In that case, the loop for platforms 11 and 12 at Crewe would be easily accessible, with plenty of room to terminate a Pendolino.
 

Esker-pades

Established Member
Joined
23 Jul 2015
Messages
3,784
Location
Beds, Bucks, or somewhere else
If you're stopping at all stations north of Rugby, you may well be running on the slows through Stafford. In that case, the loop for platforms 11 and 12 at Crewe would be easily accessible, with plenty of room to terminate a Pendolino.
But having a through platform effectively taken out of use at Crewe is a really bad idea. There's a struggle for through platform capacity as it is without removing another one.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,744
But having a through platform effectively taken out of use at Crewe is a really bad idea. There's a struggle for through platform capacity as it is without removing another one.
Remember Crewe will be quite a different place after 2a.
 

Esker-pades

Established Member
Joined
23 Jul 2015
Messages
3,784
Location
Beds, Bucks, or somewhere else
Remember Crewe will be quite a different place after 2a.
Ah, yes. I'm not sure how Crewe will change though, so I assumed the current layout as a sort of 'worst case scenario'. I'm also assuming that 2 full length Pendolinos an hour will be overkill for most of the Trent Valley stuff, so one could shorten sets to 6 cars without leaving passengers behind. Or use the 5/7 car bi-modes that are planned.
 

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,107
Location
North Wales
But having a through platform effectively taken out of use at Crewe is a really bad idea. There's a struggle for through platform capacity as it is without removing another one.
Bearing in mind @The Planner 's observation, platform 12 is only used for 20 or so movements a day. A good half of those are freight or ECS moves, which could use the Up & Down Loop, or perhaps a bay platform (for the reversing ECS moves).
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,238
Gobowen doesn’t seem the obvious place at first to terminate an intercity train, but thinking about it, it is a railhead for Oswestry as well as being practically halfway between Shrewsbury and Wrexham. Both these towns have the occasional Avanti service which could be improved once HS2 frees up capacity, therefore you could link up the two routes and have an hourly Euston - New Street - Shrewsbury - Chester - Euston loop service, with another hourly departure serving the opposite direction. This could also replace the existing Birmingham - Holyhead which in turn would free up capacity on the North Wales Line, permitting an increase in frequency for Avanti trains to run at hourly intervals on that line.

Please, please don't do this. Its resilience would be awful!
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,238
Its down to two options. Still not nailed down though.

Do we know what the two options are?

(Last I heard was a bit of a bodged job with 5 & 6 - essentially - becoming HS2 platforms with everything else, somehow, slotting into the rest of the station with, perhaps, platforms on the Independents for Shrewsbury - Crewe - Manchester. As I say, bodged.)
 

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,107
Location
North Wales
I had a dim recollection that replacing the independent lines with high-speed platforms had been considered at one point. There's also the disused island around platform 12, but routing high speed lines in and out of there may be a little problematic. A lot would depend on where freight trains would go instead.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,744
Do we know what the two options are?

(Last I heard was a bit of a bodged job with 5 & 6 - essentially - becoming HS2 platforms with everything else, somehow, slotting into the rest of the station with, perhaps, platforms on the Independents for Shrewsbury - Crewe - Manchester. As I say, bodged.)
I do, but I don't think it is in the public domain yet. HS2 was always going to use 5&6, not sure why anyone would think different.
 

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,107
Location
North Wales
I do, but I don't think it is in the public domain yet. HS2 was always going to use 5&6, not sure why anyone would think different.
There was early talk of a subterranean box approach (though I can't recall from which quarter). Perhaps the independent lines idea span off from that, possibly within the confines of my own mind. :/

Still, here's hoping that a good decision is made, and then we'll all get to natter on about it once it's announced. :)
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,238
There was early talk of a subterranean box approach (though I can't recall from which quarter). Perhaps the independent lines idea span off from that, possibly within the confines of my own mind. :/

Still, here's hoping that a good decision is made, and then we'll all get to natter on about it once it's announced. :)

The ... interesting ... controversial ... former leader of Cheshire East Council had ideas of an underground station, but I'm not sure it was ever a realistic idea.
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,238
I do, but I don't think it is in the public domain yet. HS2 was always going to use 5&6, not sure why anyone would think different.

Well, going back a few years there was talk of a new station in Basford.
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,913
The plan is still for there to be a through tunnel under Crewe to allow Captive sized HS2 trains to bypass it?
Could the idea of an underground station be a misconception that’s how all HS2 trains get to Crewe?
 