Following on from the blockbuster thread from a few years ago:
https://www.railforums.co.uk/thread...ng-of-dumfries-stranraer-railway-line.133304/
A study into reopening the line is part of the South West Scotland Transport Study Initial Appraisal: Case for Change ( https://www.transport.gov.scot/media/47013/swsts-inital-appraisal-case-for-change.pdf )
The story being reported on the BBC that schemes that will be looked at are:
Full story here:
https://www.bbc.co.uk/news/uk-scotland-south-scotland-51280045
https://www.railforums.co.uk/thread...ng-of-dumfries-stranraer-railway-line.133304/
A study into reopening the line is part of the South West Scotland Transport Study Initial Appraisal: Case for Change ( https://www.transport.gov.scot/media/47013/swsts-inital-appraisal-case-for-change.pdf )
The story being reported on the BBC that schemes that will be looked at are:
- new rail links between Dumfries and Stranraer, Stranraer and Cairnryan, and Lockerbie and Dumfries
- new stations at Cumnock, Thornhill, Eastriggs, Dunragit and Beattock
- increased services operating from Lockerbie station
- increasing the HGV speed limit to 50mph on the trunk road network
- capacity enhancement on the A75, A76 and A77
Full story here:
https://www.bbc.co.uk/news/uk-scotland-south-scotland-51280045