Hoping the new Northern operator will order more self powered trains immediately

Status
Not open for further replies.

Bornin1980s

Member
Joined
4 Apr 2017
Messages
720
Moderator note: Split from https://www.railforums.co.uk/thread...-operator-of-last-resort-to-take-over.199335/

I hope the new operator orders more self powered trains immediately, including a Hydrogen powered fleet for the Tees Valley. I always thought that Northern hadn't ordered enough self powered trains, especially given the uncertainty around electrification.

That said, I'm under no illusions. Arriva are being scapgoated for the failures of the DFT.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Matt_pool

Member
Joined
9 Nov 2016
Messages
371
I suppose it's far too early for anyone to give a guestimate as to when all of the knackered 150's that have just been dumped on the CLC line will be replaced with brand new trains! :rolleyes:
 

Andyh82

Established Member
Joined
19 May 2014
Messages
4,576
I suppose it's far too early for anyone to give a guestimate as to when all of the knackered 150's that have just been dumped on the CLC line will be replaced with brand new trains! :rolleyes:
If you are a member of the public that thinks the trains are so old because Arriva are refusing to spend money preferring to send vast profits back to Germany, then I’d expect a new fleet in the autumn.

If you aren’t one of those people, then maybe in about 2030
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,315
Well if CAF manage to get the 195s working properly I could see a follow on order immediately after CAF finishes it's other work.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,270
Why's that?
Because there’s been no precedent for OLR or DOR before them ever having ordered any additional trains, ie additional to those already planned.

But on the other hand there is a precedent for DOR abandoning plans such as the ECML 180s to Lincoln...
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
Well if CAF manage to get the 195s working properly I could see a follow on order immediately after CAF finishes it's other work.

ignoring the ethical issue is any leasing company going to give you a reasonable price on a pure diesel?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,315
ignoring the ethical issue is any leasing company going to give you a reasonable price on a pure diesel?
If they won't, just buy the damn things directly.

As for the "ethical issue", the carbon emissions from a small portion of the train fleet which makes up a small portion of transport emissions is negligible.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,302
Location
"Marston Vale mafia"
They appear instead to be proposing to bring in some more EMUs which could allow rejigs to release DMUs for other work. There's another thread on it: https://www.railforums.co.uk/thread...could-365s-be-brought-in.199353/#post-4411806

But if they were going to order more DMUs, I'd suggest in order of preference:
- 3-car bi-modes for the Manchester Airport to Barrow/Windermere service group and possibly others. New, e.g. Stadler or CAF if they'll do one, NOT 769s. This would allow a cascade of 195s onto other services, e.g. the CLC stoppers where the acceleration would make them ideal.
- Additional Class 195 coaches to extend all the 2-car units to 3 and 3-car units to 4. This mix would allow 3, 4, 6 and (eventually) 7 and 8 car formations, which is plenty of flexibility while avoiding 2-car formations which are barely suitable for anything.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,304
Location
Glasgow
Because there’s been no precedent for OLR or DOR before them ever having ordered any additional trains, ie additional to those already planned.

But on the other hand there is a precedent for DOR abandoning plans such as the ECML 180s to Lincoln...

Things change
 

td97

Established Member
Joined
26 Jul 2017
Messages
1,556
For perspective:
£1.7m per carriage for the Civity order. Suppose Windermere would require 3 4-car units. Thats £20.7m.
10 miles = 16km of electrification Oxenholme to Windermere: £2m/stk=£32m, at the upper end of estimates. If the price could be made to be £1.25m/stk then you get £20m to electrify the lot; quite possible given there's no need for any big electrification kit/feeder stations etc.
The units could now be had for effectively free; the DfT-owed 365s, with a bit of a unit reshuffle/cascade on other routes to ensure the 331s end up on the Windermeres.
The only difference is the tight-arsed DfT have to pay out a big cheque to do electrification, but new train orders are financed so cost the DfT next to nothing.
 

randyrippley

Established Member
Joined
21 Feb 2016
Messages
5,382
Why's that?
Cost
You're dealing with a situation analogous to a company administration. Cost control and expenditure reduction is going to be the initial priority. Any new major purchases or acquisitions are unlikely
 