Esker-pades
Established Member
Thank you.Good essay.
Thank you.Good essay.
Because it’s somebodys property. Taking property without paying is called theft.
doesn't negate HS2.
As in why doesn't a hotel company (e.g. Hilton) pay instead for something that the government will make little to no profit from.
I think there is a misunderstanding here. I think the hotels concerned have, or will be, demolished so the government are buying them to remove them rather than constructing them for a commercial entity to profit from.
As in why doesn't a hotel company (e.g. Hilton) pay instead for something that the government will make little to no profit from.
No, CML should not negate HS2. I too (and every rail enthusiast, professional and journalist in the country) want HS2. The only problems (and I subscribe to the Lord Berkeley thinking) are the practicalities. Being realistic,
I think there is a misunderstanding here. I think the hotels concerned have, or will be, demolished so the government are buying them to remove them rather than constructing them for a commercial entity to profit from.
Perhaps we need a speculative thread on how to widen the West Coast main line instead of HS2:
Euston station still has to be enlarged for the extra trains
New tunnels at the top of Camden Bank to widen to 8 tracks
Massive property demolition along side the route to add 2 more tracks out to Watford (or put the DC lines in tunnel and take them over)
Extra tunnel at Watford
More property demolition in Watford and Hemel Hempstead (Move A41 out of the way)
Widen Tring cutting (without touching the woods!)
Then we get a nice open bit to Bletchley comperable to France
Property demolition in Milton Keynes. How to get past the Wolverton curve with the 2 extra tracks?
Straighten the alignment parallel to the M1 to avoid Weedon. Go over the top at Blisworth to avoid the tunnel?
More demolition in Rugby, Coventry and on the approach to Birmingham to add 2 more tracks.
Upgrade the Trent Valley 4 tracks to 186mph (300 kph)? Or widen to six tracks? (In which case Tamworth and Litchfield lose lots of property)
New straight bit at Atherstone.
Flyover junction at Colwich and new alignment to avoid the curve and tunnel
New alignment to by-pass Stafford (sharp curve)
4 tracking Stoke to Manchester (Bramhall and Poynton property demolished)
6 tracking Stockport to Piccadilly (more houses gone)
Major rebuild at Crewe (80 mph limit)
New alignment to avoid the Winwick - Golborne speed restrictions
etc etc
The do the same on the Midland main line and the East Coast Main Line (Digswell viaduct and tunnels would cost Grant Shapps his seat)
Now does anyone really think this will be much cheaper and easier to do than a new line in continuous tunnel from Euston to the Colne Valley.
Think about how easily HS1 was built v the West Coast upgrade to 140mph downgraded to 125mph.
HS2 makes perfect sense.
I'm a northerner living in the south in case you wonder.
Good estimate. Also worth pointing out how many weekends of disruption this would take to achieve. Perhaps 30 years worth on the WCML alone.
The do the same on the Midland main line and the East Coast Main Line (Digswell viaduct and tunnels would cost Grant Shapps his seat)
Now does anyone really think this will be much cheaper and easier to do than a new line in continuous tunnel from Euston to the Colne Valley.
Isn't this just moving the goalposts?
A continuous tunnel from Euston the Colne Valley shouldn't be needed. Think about French HS lines which start at places like Villeneuve-Saint-Georges. Even the LGV Mediteranneé, which runs in a long tunnel out of town cost 5 billion (inflation-adjusted Euros) for 250 km, including the large triangle junction and several viaducts at Avignon. This works out at around 20 million euros. HS2 is rather over-the-top for what it needs to do anyway.
Personally, I am of the opinion that HS2 London to Birmingham is not an appropriate project for the UK. However, there may be a case for a major upgrade to the Chilterns line. Starting at Marylebone, I would recommend a few new underground platforms (this has been done in Rennes, Brittany). The line would receive a comprehensive upgrade and LUL stock would not be sharing the line between Pinner and Harrow, unless some form of bi-current system running on OLE and 4th rail could be devised, creating a 100mph line through to Amersham, and then 220 km/h from there to Birmingham.
I wonder what others' thoughts are.
No, CML should not negate HS2. I too (and every rail enthusiast, professional and journalist in the country) want HS2. The only problems (and I subscribe to the Lord Berkeley thinking) are the practicalities. Being realistic,
Isn't this just moving the goalposts?
The ECML upgrade seems to me only to be of much use should TPR be built.
Why does an upgrade to the Trans Pennine Route(s) help the ECML with or without HS2?
Without it Newcastle, Edinburgh and the likes are not going to benefit properly and might be better off just going via the ECML.

Not building HS2 will mean either years and years of this sort of thing as each section of line is rebuilt or even higher rail fares to price people off the tracks
But for the foreseeable future more and more closures for something where the sole certainty is obsolescence before it's even open.
Obsolete because the next generation of transport technology will be quite apparent by 2030, or, failing that, at least a way of making trains a lot cheaper.
Obsolete because the next generation of transport technology will be quite apparent by 2030, or, failing that, at least a way of making trains a lot cheaper.
What is this magic next generation technology? Flying cars, the Musk car tunnel?
There are generally very few closures needed to build HS2. NR will be blocking the railway infinitely more times that HS2 require to and in most places you would integrate the work.But for the foreseeable future more and more closures for something where the sole certainty is obsolescence before it's even open.
What is this magic next generation technology? Flying cars, the Musk car tunnel?
Funny how this amazing next generation of transport technology is no reason not to re-open various rural lines that Beeching closed... these amazing leaps in technology (or the fact some people think we'll all be working from home in a decade etc (presumably eating all food in tablet form like they do in the future) are never given as justification of why we don't need SELRAP (or a main line from Okehampton to Tavistock or whatever)...
Or the way that people say we shouldn't build HS2 because it's gone over budget, when *every* infrastructure project seems to have doubled in price nowadays - look at the cost of even modest things like a new platform at Leeds/ Coventry - but people's squeamish reaction to increases in HS2 costs never seem to get mentioned as reasons to abandon other projects with spiralling budgets?
Considering that the 4-track line can be optimised, then do that first
Not all is 4 track, quite a bit is only double track.HS2 serves a place that is already served by a 4-track line. Considering that the 4-track line can be optimised, then do that first.
Ex-Beeching lines serve places where there is previously no fixed public transport link (a bus running on a public road with a sign for a bus stop is not a real 'fixed and permanent' link). HS2 serves a place that is already served by a 4-track line. Considering that the 4-track line can be optimised, then do that first.
Not all is 4 track, quite a bit is only double track.
How does that create extra capacity south of Rugby?Then 4-track it.
How does that create extra capacity south of Rugby?
Just to clarify, the only double track south of Weaver Jn is Shugborough Tunnel near Stafford which only carries just over half the trains passing Rugby. There is still a 3-track section south of Nuneaton which is 2tph busier.Then 4-track it.