Everyone who has looked at this idea seems to agree that it would have to start from a core of Bristol to Sheffield. My suggestion is that a half-hourly Bristol-Sheffield frequency from about 06:00 to 20:00 should call only at Bristol Parkway, Cheltenham, New Street and Derby. Alternative trains should continue to Leeds (and Bradford) and York/the north east. The Yorks should run either via Doncaster or Pontefract but please not via Leeds except early in the morning, late at night and early on Sunday mornings.
The WCML would have to be planned around New Street, with secondary hubs at Crewe, Preston and Manchester. Two tph from the WCML (not necessarily just Manchester) should continue south from New Street, one to Bristol (and beyond) and the other to the Thames Valley. Another train each hour should run from Thames valley stations to Sheffield and the northeast. The basic idea is at least 2 fast tph of sensible length, i.e. 8 cars, from New Street in all 4 directions. This would be overlaid by Cardiff-Nottingham semi-fasts, as now.
The Midland line would be timetabled around Derby and/or Sheffield. The ECML timetable would need to be planned backwards and forwards from York. East Anglia would pivot around hourly connections at Peterborough to Cambridge, Ipswich and Norwich.
The Southern is more problematic, but would probably have to start with Thameslink, which in turn needs to interact with the Midland.
A few self-contained TOCS, e.g. Merseyrail and C2C, and to a lesser extent Chiltern, could continue broadly as now.
Of course this would take about 10 years to introduce, since it would need infrastructure improvements on or adjoining the core routes, e.g. redoubling Droitwich-Stoke Works, the Camp Hill chords at Birmingham, maybe rebuilding Burton with 2 side platforms and centre through roads.
The other principle that ought to apply is that services should be planned as pairs of trains, up and down, with no unbalanced workings if at all possible and no services with through trains in only one direction (e.g. the ill-fated Ormskirk-Blackpool and Colne 3-legged diagrams).
I look forward to being shot down in flames.
The WCML would have to be planned around New Street, with secondary hubs at Crewe, Preston and Manchester. Two tph from the WCML (not necessarily just Manchester) should continue south from New Street, one to Bristol (and beyond) and the other to the Thames Valley. Another train each hour should run from Thames valley stations to Sheffield and the northeast. The basic idea is at least 2 fast tph of sensible length, i.e. 8 cars, from New Street in all 4 directions. This would be overlaid by Cardiff-Nottingham semi-fasts, as now.
The Midland line would be timetabled around Derby and/or Sheffield. The ECML timetable would need to be planned backwards and forwards from York. East Anglia would pivot around hourly connections at Peterborough to Cambridge, Ipswich and Norwich.
The Southern is more problematic, but would probably have to start with Thameslink, which in turn needs to interact with the Midland.
A few self-contained TOCS, e.g. Merseyrail and C2C, and to a lesser extent Chiltern, could continue broadly as now.
Of course this would take about 10 years to introduce, since it would need infrastructure improvements on or adjoining the core routes, e.g. redoubling Droitwich-Stoke Works, the Camp Hill chords at Birmingham, maybe rebuilding Burton with 2 side platforms and centre through roads.
The other principle that ought to apply is that services should be planned as pairs of trains, up and down, with no unbalanced workings if at all possible and no services with through trains in only one direction (e.g. the ill-fated Ormskirk-Blackpool and Colne 3-legged diagrams).
I look forward to being shot down in flames.
Last edited: