adamedwards

Member
Joined
4 Apr 2016
Messages
796
LNER needs more trains to avoid keeping some of the 91s and MK4s. So given the 5 car units appear to be a not very useful DfT idea, why not extend them to 9 cars? Cheaper than new units as the driving cars exist and it needs extra intermediate vehicles.

Note these are the electric only trains. The 800 binodes are needed for the former HST routes.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,335
Location
Glasgow
LNER needs more trains to avoid keeping some of the 91s and MK4s. So given the 5 car units appear to be a not very useful DfT idea, why not extend them to 9 cars? Cheaper than new units as the driving cars exist and it needs extra intermediate vehicles.

Note these are the electric only trains. The 800 binodes are needed for the former HST routes.

They don't need any more to avoid keeping the 225s, which they aren't retaining any of. They will have a larger fleet of Azumas than they had 125s & 225s.
 

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,107
Location
North Wales
They don't need any more to avoid keeping the 225s, which they aren't retaining any of. They will have a larger fleet of Azumas than they had 125s & 225s.
Is it the case that since being brought back into public ownership, they're no longer going to run the extra services that would have required keeping some of the old fleets? I have dim recollections along those lines.
 

class26

Established Member
Joined
4 May 2011
Messages
1,200
Is it the case that since being brought back into public ownership, they're no longer going to run the extra services that would have required keeping some of the old fleets? I have dim recollections along those lines.

They are going to order new trains for these services.
 

class26

Established Member
Joined
4 May 2011
Messages
1,200
LNER needs more trains to avoid keeping some of the 91s and MK4s. So given the 5 car units appear to be a not very useful DfT idea, why not extend them to 9 cars? Cheaper than new units as the driving cars exist and it needs extra intermediate vehicles.

Note these are the electric only trains. The 800 binodes are needed for the former HST routes.

They will need to keep some 5 cars as only yesterday the 07.30 Lincoln - Kings X started from Newark due to it being a 9 car and presumably couldn`t fit onto Lincoln`s platform although the HST managed by locking out of use until Newark severtal carriages. Not sure why they couldn`t have done this yesterday
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,335
Location
Glasgow
Is it the case that since being brought back into public ownership, they're no longer going to run the extra services that would have required keeping some of the old fleets? I have dim recollections along those lines.

They are ordering additional 80x trains for the improved Edinburgh fasts. I believe the accelerated timetable though won't happen until 2021.
 

class26

Established Member
Joined
4 May 2011
Messages
1,200
They are ordering additional 80x trains for the improved Edinburgh fasts. I believe the accelerated timetable though won't happen until 2021.

Most sensible idea, David Horne is on record as having said the 91`s had 300 separate points of failure so retaining them wasn`t the most sensible option
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,403
So given the 5 car units appear to be a not very useful DfT idea, why not extend them to 9 cars? Cheaper than new units as the driving cars exist and it needs extra intermediate vehicles.

How do you know it is cheaper to add coaches to the 5-car? It may seem obvious that building four intermediate cars is cheaper than a corresponding number of full sets but what is the cost of a contract variation? Agility Trains East could possibly charge a very high price for changing their existing trains.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,335
Location
Glasgow
Most sensible idea, David Horne is on record as having said the 91`s had 300 separate points of failure so retaining them wasn`t the most sensible option

It also means a more homogeneous maintenance regime, much easier maintaining an all Hitachi fleet than Azumas and a sub-fleet of some 91s etc
 

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,021
They will need to keep some 5 cars as only yesterday the 07.30 Lincoln - Kings X started from Newark due to it being a 9 car and presumably couldn`t fit onto Lincoln`s platform although the HST managed by locking out of use until Newark severtal carriages. Not sure why they couldn`t have done this yesterday
@ZL exile reported that it was an (electric) 801, which is why it had to start from Newark Northgate and not from Lincoln.
 

Mitchell Hurd

On Moderation
Joined
28 Oct 2017
Messages
1,763
Most sensible idea, David Horne is on record as having said the 91`s had 300 separate points of failure so retaining them wasn`t the most sensible option

300??? Yeah, that's a lot of failures. I get the sense these virtually always eat the overhead wires.
 

Fawkes Cat

Established Member
Joined
8 May 2017
Messages
5,341
Given that 80x trains are being widely bought, and it seems to be the case that neither GWR nor LNER seem to actually have what they need, would it make sense to
- work out what the total demand for the things is
- acquire whatever the difference is between the current fleet and the identified need
- swap trains between TOCs so that everyone has the fleet they actually need
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,403
Given that 80x trains are being widely bought, and it seems to be the case that neither GWR nor LNER seem to actually have what they need, would it make sense to
- work out what the total demand for the things is
- acquire whatever the difference is between the current fleet and the identified need
- swap trains between TOCs so that everyone has the fleet they actually need

This isn't going to happen. There is a detailed contract about the trains that would need to be rewritten to start fiddling around with the fleets. Is there a provision in those contracts which allows them to be renegotiated to change the fleets to give GWR or LNER "what they need"? GWR and LNER just operate the trains which have been procured by the DfT and are provided by Agility Trains.

https://www.gov.uk/government/publi...ogramme-technical-specification-and-contracts
 

Fawkes Cat

Established Member
Joined
8 May 2017
Messages
5,341
This isn't going to happen. There is a detailed contract about the trains that would need to be rewritten to start fiddling around with the fleets. Is there a provision in those contracts which allows them to be renegotiated to change the fleets to give GWR or LNER "what they need"? GWR and LNER just operate the trains which have been procured by the DfT and are provided by Agility Trains.

https://www.gov.uk/government/publi...ogramme-technical-specification-and-contracts
Is there anything to stop (say) GWR subletting 'their' small trains to (say) TPE, while letting some new big trains from Agility or whoever? If so, that doesn't mean rewriting the whole contract: instead it means varying it a bit.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,403
Surely it's less complex than rejigging fleets on traditional lease agreements, which can and does happen?

From what has been written on these forums I don't think that is right. Comments are made such as 'you need to pass the trains back in the form you started with at the end of the contract' which implies that there is some freedom to rejig fleets on traditional lease agreements so long as you don't mess anything up. With the IET contracts, we have been told things like 'Hitachi do the allocations' and it is a 27.5 year contract to supply the trains to the DfT. There is loads of stuff in the contracts about the process of passing them from maintainer to operator and back again each day. It is not up to GWR or LNER how the units are formed.

Is there anything to stop (say) GWR subletting 'their' small trains to (say) TPE, while letting some new big trains from Agility or whoever? If so, that doesn't mean rewriting the whole contract: instead it means varying it a bit.

It would appear that the 800s aren't GWR's trains to sublet to TPE and it would be a bit difficult to get them from the relevant Hitachi depots each day so GWR are stuck with operating them in the form they have been procured. Clearly the 802 fleet is something different and it would presumably be easier for GWR to sublet them to TPE if the need arose in the future but, for the time being, as explained many times in other threads, the 5-car units are how the relevant services are to be provided.
 