adrock1976
Established Member
Having had a quick revision of recent posts in the East West Rail thread in the Infrastructure & Stations section, and having had a quick eyeball at the Wiki page (unsure if still accurate or up to date), I have designed a clockface timetable with the Winslow - Bletchley, and Bletchley - Bedford having three trains per hour.
I have an Oxford - Milton Keynes Central calling all stations (including Islip - possible transfer to these trains seeing as Chiltern only provide sporadic calls?) every 60 minutes, Princes Risborough - Milton Keynes Central via Aylesbury calling all stations every 60 minutes, Oxford - York or Hull via Bedford Midland, Alfreton, and the former "Old Road" via Beighton Junction as a traditional Intercity service, and have introduced an additional limited stop Bletchley - Bedford train (maybe extended to Sandy/Cambridge in future?).
I have included the re-sited Winslow station at Buckingham Road, and a new station at Ampthill Road at the Park and Ride. I anticipate this being of a design similar to Tamworth, Lichfield Trent Valley, and Worcestershire Parkway being as the Midland Main Line passes through the Marston Vale at a perpendicular angle. This would also provide interchange with the Thameslink trains.
Regarding the Intercity train, perhaps instead of starting at Oxford General, it could start from either Swindon or Reading? I decided to continue north from Bedford Midland until I came to a station that has a London facing bay platform long enough to terminate Intercity trains, or onto a line that has Intercity trains that is a dead end. This explains either York or Hull and as I could not decide which one, I have included both options. Although beyond the scope of the main topic, I have anticipated HS2 reaching the East Midlands region at Toton, and have also based the assumption of the former stations at Killamarsh West (ex Midland - renamed Killamarsh & Halfway) and Rotherham Masborough reopening. However, these would ideally be part of a local and regional project of South Yorkshire Passenger Transport Executive and possibly Derbyshire County Council (as although Killamarsh and Halfway are next door to each other, the former is in Derbyshire with the latter being in Yorkshire) and not exclusive to the East West Rail Intercity trains. Perhaps forum member @tbtc would know more about things in that neck of the woods?
Without making this opening post too lengthy, I am aware that there are single track sections between Bletchley and Bow Brickhill, and another short section at Bedford St Johns station. I am unsure if it is intended to have these as double track. I did have a few questions in my mind while designing the suggested timetable in that would it be possible for the Bletchley - Bedford locals to have alternating calling patterns such as one train omits Woburn Sands but calls Aspley Guise with the next train doing it the other way round? All of the lightly used stations would still have a 60 minute frequency as at present. I am unsure if there are local short hop journeys or not. Being as both @DarloRich and @Bletchleyite are familiar with the Marston Vale line, I am interested in hearing further thoughts on a suggested East West Rail timetable.
I have an Oxford - Milton Keynes Central calling all stations (including Islip - possible transfer to these trains seeing as Chiltern only provide sporadic calls?) every 60 minutes, Princes Risborough - Milton Keynes Central via Aylesbury calling all stations every 60 minutes, Oxford - York or Hull via Bedford Midland, Alfreton, and the former "Old Road" via Beighton Junction as a traditional Intercity service, and have introduced an additional limited stop Bletchley - Bedford train (maybe extended to Sandy/Cambridge in future?).
I have included the re-sited Winslow station at Buckingham Road, and a new station at Ampthill Road at the Park and Ride. I anticipate this being of a design similar to Tamworth, Lichfield Trent Valley, and Worcestershire Parkway being as the Midland Main Line passes through the Marston Vale at a perpendicular angle. This would also provide interchange with the Thameslink trains.
Regarding the Intercity train, perhaps instead of starting at Oxford General, it could start from either Swindon or Reading? I decided to continue north from Bedford Midland until I came to a station that has a London facing bay platform long enough to terminate Intercity trains, or onto a line that has Intercity trains that is a dead end. This explains either York or Hull and as I could not decide which one, I have included both options. Although beyond the scope of the main topic, I have anticipated HS2 reaching the East Midlands region at Toton, and have also based the assumption of the former stations at Killamarsh West (ex Midland - renamed Killamarsh & Halfway) and Rotherham Masborough reopening. However, these would ideally be part of a local and regional project of South Yorkshire Passenger Transport Executive and possibly Derbyshire County Council (as although Killamarsh and Halfway are next door to each other, the former is in Derbyshire with the latter being in Yorkshire) and not exclusive to the East West Rail Intercity trains. Perhaps forum member @tbtc would know more about things in that neck of the woods?
Without making this opening post too lengthy, I am aware that there are single track sections between Bletchley and Bow Brickhill, and another short section at Bedford St Johns station. I am unsure if it is intended to have these as double track. I did have a few questions in my mind while designing the suggested timetable in that would it be possible for the Bletchley - Bedford locals to have alternating calling patterns such as one train omits Woburn Sands but calls Aspley Guise with the next train doing it the other way round? All of the lightly used stations would still have a 60 minute frequency as at present. I am unsure if there are local short hop journeys or not. Being as both @DarloRich and @Bletchleyite are familiar with the Marston Vale line, I am interested in hearing further thoughts on a suggested East West Rail timetable.
Attachments
Last edited: