Could a siding be created on the Manchester Airport spur?

Status
Not open for further replies.

MetroCar4058

Member
Joined
18 Jun 2014
Messages
588
Surely there is room for a siding to be built on the airport spur. TPE units could pop into there if they are on time and wait there until 10 mins before booked out.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MetroCar4058

Member
Joined
18 Jun 2014
Messages
588
Have you ever travelled on this line stretch? Where is this room for a siding to which you make reference to?

Yes quite a few times actually. It would have to be near Heald Green Jn. Of course it's a bit more complicated with the airport relief road now and it is rather tight. The area between the railway and the car park past the threshold for the runway is probably the only option? Interestingly from satellite imagery this land is owned by NR and there is an access ramp. I've attached an image to support this.

I appreciate this is completely off topic, so might warrant another thread.
 

Attachments

  • Location.png
    Location.png
    2.3 MB · Views: 68
Last edited:

Bovverboy

Established Member
Joined
1 Dec 2013
Messages
2,098
Surely there is room for a siding to be built on the airport spur. TPE units could pop into there if they are on time and wait there until 10 mins before booked out.

Indeed, and, assuming time permitted, be cleaned while they were there. That effectively resurrects the idea of carriage sidings, which, throughout most of the history of railways, people saw as being perfectly natural. From a capacity viewpoint, a stabling siding would effectively convert the Airport from a 4-platform station into a 5-platform one.
 

js1000

Member
Joined
14 Jun 2014
Messages
1,023
Where on earth has the sidings idea come from?!?

If you were going to chuck a few million at such a problem you'd be better off just extending the 200 metre platform 4 to 300 metre so that it could accommodate TPE 5/6 coach and Northern 4/6 coach!

The sequencing of Northern services on top of TPE services isn't so much an issue - but both TPE moving to 6 coach operation and Northern to 4 & 6 and platform lengths not being ideal to allow both to share one at the same time.
 