It's not London centric at all, if anything it's Birmingham centricWhat about "The government accepts that HS2 is London-centric so we are scrapping it, to focus on NPR." ?
What about "The government accepts that HS2 is London-centric so we are scrapping it, to focus on NPR." ?
What about "The government accepts that HS2 is London-centric so we are scrapping it, to focus on NPR." ?
I think HS2 and NPR will be approved. So will a solution to the Castlefield conundrum,- I am just not sure which one
It's not London centric at all, if anything it's Birmingham centric
Did you miss the bits in this thread about NPR depending in part on HS2? Or all many, many posts that have pointed out to you the different ways that HS2 benefits the North and the Midlands? The faster trains from Birmingham to Manchester and Leeds, for example? Or the release of capacity on the Manchester-Stockport corridor?
Well I did hope that putting the sentence in quotation marks would indicate that I was suggesting what the government might say, not putting forward my own view. Sorry if that misled you.

I do wonder if NPR will be tasked with building bits of HS2 in the North so both can be seen to be making progress in the North.
To use an aviation analogy: HS2 is at the start of the runway, fully crewed, engines running with full tanks of fuel, waiting for clearance to take off.
It's places-between-Milton-Keynes-and-Euston-centric. Its main benefit is decongesting that horribly congested part of the WCML allowing local and regional express services to be improved. In essence it's another pair of fast lines for that stretch. It also similarly "4-tracks" the line into Birmingham itself, allowing the poor local service between Coventry and New St to be improved. And if it's built all the way into Manchester, it does the same between Crewe/Macclesfield and Manchester Piccadilly - for instance Levenshulme and Heaton Chapel would probably justify 4tph a la Merseyrail but at present there's just no room.
It also provides a benefit to people from places that aren't London who want to go there a bit quicker. Though that is really a side benefit - its main raison d'etre is capacity.
The people it benefits least of the places connected are probably actual Londoners, unless they happen to have work connections with a specific set of cities (e.g. BBC staff).
No, shovel ready. The government think railway employees still cook their food on the coal shovel in the firebox."Oven ready"![]()
No chance.
HS2 is a construction organisation, ready to go.
NPR a collection of transport planners, engineering and environmental consultants. The project is at least 5-7 years behind HS2.
To use an aviation analogy: HS2 is at the start of the runway, fully crewed, engines running with full tanks of fuel, waiting for clearance to take off. NPR is a 1:200 conceptual model in the designers office, and no one knows where the factory is to be built.
Which is why I said building bits of HS2 so that both can claim progress.
NPR is seen as actually happening, whilst HS2 would have infrastructure ready to connect to once the Southern end gets further North. It would alleviate the fears that HS2 will just stop being built once it reaches Birmingham and could be seen as "listening" to those who say that it needs to be built from the North as well as from the South at the same time.
Certainly calling HS2 phase 2B the new NPR phase 1 would certainly alter some people's perceptions.
Why is the route into Manchester so tortuous, its farcical other than avoiding the wealthy Tatton area?
Are you implying that everything to and from Manchester is going to stop at the airport station? It does look like a somewhat tortuous route, but in fact it seems to be only 4 to 5 miles (c.15%) longer than the direct line from Crewe. No use, of course, for anything going north from Manchester, which just helps to make the point about this being a "London and ..." railway.While it looks a little curvier than the majority of the HS2 alignment, the spur to Manchester is still a 230kph railway for the bulk of it and of optimal speed as it slows towards the airport station and city station. If the route were to continue on a Southwesterly bearing from Manchester airport it would have to stay in tunnel (£££) to go under Tatton park, Knutsford and Mobberly - nothing to do with the wealth of the area. The route it takes from Manchester Airport to the Junction follows largely open country side.
While it looks a little curvier than the majority of the HS2 alignment, the spur to Manchester is still a 230kph railway for the bulk of it and of optimal speed as it slows towards the airport station and city station. If the route were to continue on a Southwesterly bearing from Manchester airport it would have to stay in tunnel (£££) to go under Tatton park, Knutsford and Mobberly - nothing to do with the wealth of the area. The route it takes from Manchester Airport to the Junction follows largely open country side.
This is the problem. Anti HS2 campaigners are very skilled at bombarding their MPs and the media with their protests until everyone thinks that nobody wants it and that there is no business case for it. Pro HS2 campaigners who generally are far better informed simply bombard each other.Some months ago, I tried to set up a group with some people from this very thread who seemed clued up. Unfortunately, we never got beyond the point of discussing in principle what we might be doing, and then interest seemed to dry up. I do wonder whether, with the review of HS2 ongoing and various hints that it'll come out quite favourable to HS2, there's perhaps less need for such a group than there was - say - 6 months ago when you had Tory Party leadership contenders openly bashing HS2 - presumably in an attempt to garner votes from right wing Tory party members.
But if you want I can send you the link to the the group chat to see if there's anything you feel you can contribute.
Are you implying that everything to and from Manchester is going to stop at the airport station? It does look like a somewhat tortuous route, but in fact it seems to be only 4 to 5 miles (c.15%) longer than the direct line from Crewe. No use, of course, for anything going north from Manchester, which just helps to make the point about this being a "London and ..." railway.

Taking up the moderator's advice, I will continue what I wrote on the other closed thread to write that there is no doubt that the most environmental benefits would be obtained by getting people out of local journeys by car, rather than providing faster inter-city travel. Of course one would have to price folk off the railways, motorways and airways. The result would be that only business people and rich ones could undertake more than occasional long-distance journeys, and this would mean that the present WCML infrastructure would be more than adequate, thus destroying the case for extra capacity. Mancunians would have to make do with Skype and Whatsapp when contacting Grandma in Neasden and wait for West End shows to gravitate to Manchester or watch it on TV (etc, etc). Unfortunately for this 'Greta' argument, politicians, except for the Green Party, are not interested in these policies, being mostly middle-aged or older men, who like boys' toys. They also need to get elected. Most of the correspondents on here will be in the same category as I am where fascination for fast things is concerned.
So HS2 it has to be.
If we increase rail use by 50% (from 8% of miles traveled to 12%) but that reduces car travel by 1/10th (from 78% to 70%) we'll be better off. As not only will we have reduced total milage by 4%, but another 4% will be by a mode which (even if powered by the same fuel source) is more environmentally friendly.
I don't know what the stopping patterns will be like for the Airport - My point was principally that you don't need a 400kph-capable alignment all the way up to the buffers. Manchester Airport could act like Watford Junction does today for people in North London by allowing passengers who live in south Manchester area to travel south without having to go into town and come back out again. So there might not be a lot of harm stopping all services there.
Since HS2 isn't proposed to extend north of Wigan at present, another chord at the junction (I'm sure it has a name...) to form a triangular junction (Shown in red in picture) would only provide a longer route to get to the WCML. In future it could facilitate a future north-bound service from Manchester onto an extended HS2 towards Scotland.
View attachment 71735
Because perhaps it's needed?But why do we want to improve capacity to Scotland ?![]()