• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Ex Virgin Trains Voyagers, where could they go next?

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,745
I thought the dwell time was part of the timing to allow a bit of slack.
No, it is the time required to get the doors open, punters on and off and doors closed again. You need 1½ for a 22x. To say they are padded is laughable, it is one of the reasons the LNWR/WMT timetable is falling apart as the dwells aren't long enough at many stations.
 

greatvoyager

Established Member
Joined
15 Aug 2019
Messages
2,426
Location
Exeter
Technically, dwell time is the time that trains are expected to dwell (hang about) at a station. Whether dwell estimates are padded out to give some slack is another matter...
I always thought XC had longer dwell times to make up lost time as their journeys are so long.
 

greatvoyager

Established Member
Joined
15 Aug 2019
Messages
2,426
Location
Exeter
No, it is the time required to get the doors open, punters on and off and doors closed again. You need 1½ for a 22x. To say they are padded is laughable, it is one of the reasons the LNWR/WMT timetable is falling apart as the dwells aren't long enough at many stations.
Whenever I get on a voyager, it always seems to be a long while between the last passenger boarding and the train leaving.
 

PartyOperator

Member
Joined
26 May 2019
Messages
194
There's usually a longer wait timetabled at New Street and Temple Meads, but a large number of passengers can get off and on at stations like Wolverhampton and Cheltenham that often don't have any padding. Also, the extra time at New Street is often lost just on the approach to Birmingham, then if it's busy it can easily take a few minutes to exchange all the passengers and the path out of Birmingham is lost, delaying things further.

It's extra fun when delays mean multiple XC trains are expected on the same platform at New Street at the same time (e.g. the 17:12 to Bristol and the 17:30 to Cardiff both on platform 9) and they leave the displays showing this until the last minute before either announcing a platform change or acknowledging that one of the trains is going to be even later.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
No, it is the time required to get the doors open, punters on and off and doors closed again. You need 1½ for a 22x. To say they are padded is laughable, it is one of the reasons the LNWR/WMT timetable is falling apart as the dwells aren't long enough at many stations.

Is dwell time calculated from when the wheels stop to when the wheels move again?
 

greatvoyager

Established Member
Joined
15 Aug 2019
Messages
2,426
Location
Exeter
I wonder if the West Coast 221s could be fitted with some experimental parts, such as new bogies or new engines.
 

greatvoyager

Established Member
Joined
15 Aug 2019
Messages
2,426
Location
Exeter
If 221s do go to XC, would the maintenance contract be added to XCs current agreement, or would it be separate?
 

greatvoyager

Established Member
Joined
15 Aug 2019
Messages
2,426
Location
Exeter
Then again if they end up at the Virgin Open Access proposal, and aren't repainted, the Virgin logo could just be reapplied.
 

greatvoyager

Established Member
Joined
15 Aug 2019
Messages
2,426
Location
Exeter
The idea has been said before, if I remember correctly they didn't have 1 bar for traction power throughout the whole unit making it difficult.
Ah, I see. Be nice if something was done to make them more efficient.
 

greatvoyager

Established Member
Joined
15 Aug 2019
Messages
2,426
Location
Exeter
I'd be rather surprised if they didn't end up maintained under the agreed terms of the current Crosscountry contract.
I imagine the only difference in the contract relates to the tilting equipment, which would be removed with CrossCountry.
 

greatvoyager

Established Member
Joined
15 Aug 2019
Messages
2,426
Location
Exeter
Will they be going off lease as soon as the new trains are introduced, or will some be retained to cover any technical problems with the new rolling stock?
 

greatvoyager

Established Member
Joined
15 Aug 2019
Messages
2,426
Location
Exeter
It seems as if the Voyager fleet is very expensive run just from the fuel. I wonder why their fuel consumption is high.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
Can the DfT specify where they are used?
Don't think so, but Avanti said they would be operating routes which terminate at: Birmingham, Liverpool and Blackpool.

Will they be going off lease as soon as the new trains are introduced, or will some be retained to cover any technical problems with the new rolling stock?
Depends on how long the lease is, they don't seem to have another customer other than XC so I doubt it would be hard to get an extra year if needed.

It seems as if the Voyager fleet is very expensive run just from the fuel. I wonder why their fuel consumption is high.
Tilt is heavy, the XC 221s only have them disabled, not removed. The heavy bodyshell doesn't help.
 
Status
Not open for further replies.

Top