GrimShady
Established Member
- Joined
- 13 Dec 2016
- Messages
- 1,740
There is no transport project anywhere that benefits everywhere in the country. It's impossible.
There would have been if it ran all the way to Stirling with spur for the west country.
There is no transport project anywhere that benefits everywhere in the country. It's impossible.
Agree with your maths - though it felt as if most of them were on board the Anglo-Scottish train I travelled on earlier this week!There's only ~2,000 passengers a day* currently on Virgin trains
* When you only count London to Glasgow passengers:
There would have been if it ran all the way to Stirling with spur for the west country.
What route would it take? How would that benefit Norwich? Or Barrow? Or Hull?There would have been if it ran all the way to Stirling with spur for the west country.
Because I know the truth about HS2. You only have PR and spin.
What about Ipswich? Or Aberystwyth? Or Salisbury? Or Portadown? Or Stornoway?
What route would it take? How would that benefit Norwich? Or Barrow? Or Hull?
Really? So Old Oak Common is better connected to the centre of London then Euston?
Old Oak Common has the following services:
Elizabeth line, Chiltern Railways and Great Western Railway.
London Euston has the following services:
Northern Line (Via Charing Cross and Bank)
Hammersmith and City Line
Circle Line
Met Line
Victoria Line
London Overground
So how is Old Oak Common better connected to central London then a terminus and it’s connections in Central London itself?
But you say that HS2 should have been this:Exactly. Not grand enough.
This apparently benefits the whole nation? Yet you can't explain how.There would have been if it ran all the way to Stirling with spur for the west country.
But you say that HS2 should have been this:
This apparently benefits the whole nation? Yet you can't explain how.
It's quite simple EM2 a network of HS lines running up the length of the country that extends to all the major cities not just a few in the Midlands. HS rail has a greater effect on longer distances as you know. You could even have an upgraded partition of the ECML with an offshoot for East Anglia. Maybe win back much of the central belt traffic lost to domestic flights which would be a real goal.
So what part of HS2 stops somebody else coming along and building a high speed line from London to Bristol, or Norwich to Birmingham, or wherever either now or in the future, and making it a genuine network?
That's not the same as HS2 going to Stirling with a spur to Devon, which is what your post suggested.It's quite simple EM2 a network of HS lines running up the length of the country that extends to all the major cities not just a few in the Midlands. HS rail has a greater effect on longer distances as you know. You could even have an upgraded partition of the ECML with an offshoot for East Anglia. Maybe win back much of the central belt traffic lost to domestic flights which would be a real goal.
The same could be said about the motorway network, Preston bypass 1958 and the A1 upgrade is still happening as well as motorways that were never built. Why would you expect a complete network in one go?Absolutely nothing but it's not being considered at this time. There's no overall plan is there to expand the network, just a little bit here and there which will probably take over a 100 years.
It's quite simple EM2 a network of HS lines running up the length of the country that extends to all the major cities not just a few in the Midlands. HS rail has a greater effect on longer distances as you know. You could even have an upgraded partition of the ECML with an offshoot for East Anglia. Maybe win back much of the central belt traffic lost to domestic flights which would be a real goal.
It's quite simple EM2 a network of HS lines running up the length of the country that extends to all the major cities not just a few in the Midlands. HS rail has a greater effect on longer distances as you know. You could even have an upgraded partition of the ECML with an offshoot for East Anglia. Maybe win back much of the central belt traffic lost to domestic flights which would be a real goal.
The one which the last leg is 8 minutes faster via Euston is where it's more likely to be faster via Euston than changing at OOC than the one where the last leg is just 6 minutes faster.
The specific conspiracy theory of yours I was addressing was that they would spend billions enlarging Curzon Street to save ~100 million or so not building the mainline between the north and south junctions for the Curzon Street spur.
*We'll ignore that you suggest getting on the tube after taking the Elizabeth line from OOC to get to Moorgate, when Liverpool Street Elizabeth line station will share a ticket hall with Moorgate station...
Then add half an hour or so for the journey via the existing WCML and Runcorn - exactly as today - and we're looking at in the region of 90-95 minutes end to end. Compared to 128 minutes today.
And Crossrail 2 is much larger in scope (e.g. the Central Tunnels are much longer than Crossrail 1).
I’m not just saying that because I do think HS2 should be completed in full but because that’s what it is.
We regularly walk from Euston to various London attractions - the British Museum, the Zoo, Oxford Street.
Don't fancy walking from Old Oak Common !![]()
Yes you are, don't be silly.
Anyone who doesn't join in the HS2 circle jerk is an idiot. Including, it seems, Lord Berkeley, who was on the HS2 review panel and is raising the same issues as me.
http://stophs2.org/news/18779-co-chair-distances-oakervee-review-hs2
Interesting that the BCR of 1.1 includes 18tph, which even HS2 admit is impossible. They then admit the reduced tph will reduce the benefits by 24%, so bringing the BCR way under 1.
Interestingly, Lord Berkeley also thinks the promoters of this project are prevaricating about costs until it's "too late" to stop HS2. I wonder why they might be doing that...
Because I know the truth about HS2. You only have PR and spin.
The estimated journey time to Crewe is about 55-60 minutes, down from 90 now. One would assume the classic bit will stay the same, so you're looking at about a 30 minute saving. Not 40, unlike others have asserted. That 10 mins makes a huge difference to any BCR.
Lord Berkeley would say what he is saying as he's been a HS2 critic
yes I understand the business case for it in the first place
Fact check:
the standard journey time for Euston to Crewe (with a Crewe stop) on Virgin Liverpool services today is 94 minutes down, (xx07 departure, +141 arr), and between 97-101 minutes up.
the proposed journey time for Euston to Crewe on HS2 services is 55 minutes.
I genuinely can't make head nor tail of what you have just said there. Can you provide a translation?
HS2 estimate Euston-OOC will take 7 minutes. So go away, add 7 to whatever point you were trying to make, and get back to me.
You won't get from Euston to Moorgate in 8 minutes, I'll tell you that now, regardless of what Citymapper might say.
Nope, you've lost me again.
If you'd like to quote this "conspiracy theory" I'm all ears. Until then, pipe down and learn some manners.
You were talking about London Bridge, which would be a tube from Moorgate or a Thameslink from Farringdon. You raised London Bridge, not me, so cut out the attitude.
The estimated journey time to Crewe is about 55-60 minutes, down from 90 now. One would assume the classic bit will stay the same, so you're looking at about a 30 minute saving. Not 40, unlike others have asserted. That 10 mins makes a huge difference to any BCR.
CR2 is going to cost more than I thought. You're right. Still, £5bn is a good deposit against the cost in anyone's book.
Yes you are, don't be silly.
Anyone who doesn't join in the HS2 circle jerk is an idiot. Including, it seems, Lord Berkeley, who was on the HS2 review panel and is raising the same issues as me.
http://stophs2.org/news/18779-co-chair-distances-oakervee-review-hs2
Interesting that the BCR of 1.1 includes 18tph, which even HS2 admit is impossible. They then admit the reduced tph will reduce the benefits by 24%, so bringing the BCR way under 1.
Interestingly, Lord Berkeley also thinks the promoters of this project are prevaricating about costs until it's "too late" to stop HS2. I wonder why they might be doing that...
How does reducing the frequency of trains to/from London reduce the total benefits by 24%, for starters a reduction from 18tph to 14tph is a reduction of 22.2%.
The fastest Crewe-London is 90 minutes, though, as the Liverpools have extra stops. So we'll use 90 minutes. HS2 do. So it's 35 minutes, not 40.
The 55 minutes estimate is at a 360km/h running speed, according to HS2, but mutterings are this will be reduced; even HS2 now think it's likely to be 300-320km/h. This will add 6-11 minutes to the journey time.
So best case it's 35 not 40, worst case it's 25 not 40.
I'm not being churlish- it's an improvement, I've not said it isn't- but that 15 minutes makes a huge difference to what is an already fragile BCR.
When High Speed Rail benefits all the the city's in the UK then it's money well spent. Untill that point...meh.
Like most projects in this country, not grand enough, too late and too slow.
You would have to ask the (pro-HS2) review authors who stated this. They actually said a cut from 18tph to 16tph would cause that reduction in benefit, but I'm happy to extrapolate that to 14tph.
No high speed railway in the world manages more than 14tph (according to no2HS2- I've not verified that).
I'm happy to take it at face value, as seemingly Lord Berkeley also was.
It makes sense- lower frequencies are less attractive, on top of the reduced capacity- so I've no reason to question it.
Which services are seeing a reduction in frequency? Has there been a schedule of services published?
I'm just imagining the conversation that could have taken place in the 1820's
how likely is it that a faster service (which cuts 25 minutes off a 90 minutes journey time) would harm the future growth so it caused significant harm to the business case?
The fastest Crewe-London is 90 minutes, though, as the Liverpools have extra stops. So we'll use 90 minutes. HS2 do. So it's 35 minutes, not 40.
The 55 minutes estimate is at a 360km/h running speed, according to HS2, but mutterings are this will be reduced; even HS2 now think it's likely to be 300-320km/h. This will add 6-11 minutes to the journey time.
So best case it's 35 not 40, worst case it's 25 not 40.
I'm not being churlish- it's an improvement, I've not said it isn't- but that 15 minutes makes a huge difference to what is an already fragile BCR.