I have just been looking at a route learning video from Battersby Junction to Whitby. Trundling jalong at a top speed of 45mph punctuated by 10mph over some bridges and past open crossings to Grosmont followed by 30mph top speed onto Whitby punctuated by the same 10mph limits over some bridges and open crossings. It was absolutely ball breaking watching mile after mile of relatively good alignment and not travelling faster. Why?
There were many chunks of cwr and a few new underbridges but still only 45mph. To me there was no reason why 60/65mph could not be allowed to Grosmont and 45/50mph after that.
The 10mph restrictions for open crossings on a line of only 30/45mph are completely unnecessary. There are open crossings on lines on the Continent with double track and far higher speeds than 30mph without incident. Are we incapable in this Country of making a decision of whether it is safe to cross a single track railway without crashing into a train? Removing these 10mph crossings would knock 10 minutes off the journey straight away. Another 10 minutes saved between Middlesbrough and Battersby and a new chord avoiding Batterby could reduce the journey to an hgour.
All of these are immediately beyond station platforms, and therefore there is no time loss.
Also it negates any possible quicker "express" services being introduced in between the current all stations stopper services.Being pedantic but isn’t there some time lost in one direction - having to stop for the crossing, then start and presumably crawl into the platform?
I'm not sure about closing any stations but I think a few could be made into request stops. Perhaps all stations except the token exchange points?Which raises my other ‘outsider’ question. Are all the stations really necessary, and would it make a worthwhile time difference if any could be closed? There seem rather a lot of them.
Personally I would have the government telling NIMBYs and local bodies, including national parks, “If you want to keep the station you have to build some more demand”.
Which raises my other ‘outsider’ question. Are all the stations really necessary, and would it make a worthwhile time difference if any could be closed? There seem rather a lot of them.
Personally I would have the government telling NIMBYs and local bodies, including national parks, “If you want to keep the station you have to build some more demand”.
I assume getting rid of the token machines would need some major resignalling?
When I travel the route, there seem to be plenty getting on and off at random stops. None seem to stand out as never appearing to be used.
But that attitude does not help Whitby. It is a Cinderella service and needs a fairy godmother to give a better dea.Thought I’d do a fact check.
According to the sectional appendix, there are 5 open / half barrier crossings on the branch, all of which have some form of speed restriction, and a further footpath crossing with a speed restriction. 3 of these crossings are immediately next to stations. Of the 12 speed restrictions (6 each way), 3 are ‘ STOP’, ie the train must stop before traversing the crossing. All of these are immediately beyond station platforms, and therefore there is no time loss. Only one of the remaining 9 is 10mph (for passenger trains), and that is immediately on approach to a station platform, thus the time loss is negligible. Of the 3 crossings / 6 restrictions not next to stations, only Battersby Rd (20mph Down, 15 mph up) is lower than 25mph, and that is adjacent to a 20 restriction for the run into Battersby. Between them, these crossings will cause a maximum of 2 minutes in each direction.
I don’t know about the state of the bridges, but at least one has been replaced in the last year. Also having looked at the data, the route alignment is not good. Not good at all. I can’t see how it can be improved easily.
I think that given the whole line is used by fewer than 1/4 million of a passengers per year, any infrastructure expenditure to reduce journey times on that line would be far better spent reducing journey times elsewhere.
That is if you can find somewhere to park anywhere near Whitby. Despite taking over large chunks of railway land for a supermarket and car park, all day parking in Whitby is a problem.How many visitors does Whitby get on a November weekday! Apologies for my cynicism, but I struggle with the “let’s get the train to Whitby” idea...though I can imagine some old folk drive over (being able to drive right to your destination and sit in the car being a bit more inviting than cold stations and longer walks on a November day.
I'm not sure I'd go so far as plenty but I don't think there are any that particularly scream out as being candidates for closure. Well, other than Battersby but that's a token exchange point so...
What are you not going to fund in order to pay for this?But that attitude does not help Whitby. It is a Cinderella service and needs a fairy godmother to give a better dea.
Funnilly enough, I've seen passengers getting on/off there on a few occasions as well.
Not if they are immediately beyond the platform, and different arrangements apply the other way. Sleights one way, Ruswarp the other (affecting the NYMR expresses!) not sure where the 3rd is.Being pedantic but isn’t there some time lost in one direction - having to stop for the crossing, then start and presumably crawl into the platform?
Nunthorpe is minimal because there is a human there, Battersby 1/2minute, Glaisdale is booked a 3 minute stop. So perhaps 3 minutes could be saved.Also how much time is wasted by physically exchanging tokens at Nunthorpe, Battersby, Glaisdale and Whitby? Up to 10 minutes? I assume getting rid of the token machines would need some major resignalling?
The point is -
Whitby needs more trains.
Whitby needs faster trains.
The Esk Valley line needs investment.
And who is paying for this and which line are therefore not upgrading to pay for it?
Perhaps making some stations request stops could bring it down further from 65 to 60 minutes? Kildale, Ruswarp and possibly 2/3 others? Although (for example) a busy 10:28 from Middlesbrough service on a Saturday having to stop at most stations could have a very tight turnaround at Whitby.Not if they are immediately beyond the platform, and different arrangements apply the other way. Sleights one way, Ruswarp the other (affecting the NYMR expresses!) not sure where the 3rd is.
Nunthorpe is minimal because there is a human there, Battersby 1/2minute, Glaisdale is booked a 3 minute stop. So perhaps 3 minutes could be saved.
Add 2 minutes for LC modernisation, and 5 for the Battersby curve, and you could get Nunthorpe-Whitby down to 65 minutes, Nunthorpe-Glaisdale down to 40. A lot of money - and you still haven't got times that would allow a 2-hourly service, which is frustrating.
So rather than relieving one of, if not the, busiest mainline in the UK you'd spend money on lines like the Esk Valley?! You'll forgive me if that seems like a crazy idea...Well one such pot of money that'd be better spent is the HS2 pot.
To give a sensible turnround (seems to be 9min minimum) you need to aim at 55min from Nunthorpe, any other option requires a second unit on the branch which rather increases your costs.Perhaps making some stations request stops could bring it down further from 65 to 60 minutes? Kildale, Ruswarp and possibly 2/3 others? Although (for example) a busy 10:28 from Middlesbrough service on a Saturday having to stop at most stations could have a very tight turnaround at Whitby.
Kildale is another problem too as it is currently just long enough to accomodate a 2 car 156 / 142.
NYCC have found £11m + £2.5m grant from the Yorkshire and Humber LEP for doubling the line between Knaresborough and Cattal so that the Leeds-Knaresborough trains can be extended to York. It just happens that the County Councillor who authorised this is a Harrogate Councillor! If only the same could happen for Whitby.What are you not going to fund in order to pay for this?
Well it needn't have been built to 250mph standard and alignment. 150mph would have been more than enough for domestic use. That would mean less tunnelling and less viaducts and less property destruction, therefore cheaper to build and more money to spend on existing railways.So rather than relieving one of, if not the, busiest mainline in the UK you'd spend money on lines like the Esk Valley?! You'll forgive me if that seems like a crazy idea...
And who is paying for this and which line are therefore not upgrading to pay for it?
What are you not going to fund in order to pay for this?
You've been lucky then! It only has a usage of about three people per day![]()
It's not a zero sum game!And who is paying for this and which line are therefore not upgrading to pay for it?
How much cheaper would that be? If it was so much better value, why don't other countries do that?Well it needn't have been built to 250mph standard and alignment. 150mph would have been more than enough for domestic use. That would mean less tunnelling and less viaducts and less property destruction, therefore cheaper to build and more money to spend on existing railways.
Being pedantic but isn’t there some time lost in one direction - having to stop for the crossing, then start and presumably crawl into the platform?
Well one such pot of money that'd be better spent is the HS2 pot.
Then again we are all speculators not experts.
Is there a ‘safe level crossings’ fund that can be raided to improve Whitby linespeeds without it coming out of a specific ‘improve Whitby line’ business case?
European countries with TGV-type lines are all far bigger and less densely populated than UK so 190mph over there and really huge countries like China are 250mph. We aren't really bothered with journey's greater than 200 miles as HS2 is supposed to be for capacity not speed.How much cheaper would that be? If it was so much better value, why don't other countries do that?
Speak for yourself!