Bletchleyite
Veteran Member
Terminus boarding is only poor use of stock if you consider it appropriate to lop out the layovers. It isn't, that causes unreliability, you need the SAME layovers but concentrated onto the outer ends.
So using a simplified hypothetical example, if you have B as a terminus, and have a route A-B with 15 minutes layover at A and B, and a route B-C with a 15 minute layover at each of B and C, if you turn that into a through service A-B-C you still need 60 minutes total layover, it just has to change into being 30 minutes at each end (or 15 and 45, or whatever).
(Well, you might be able to lop out about 2-3 minutes for the driver and guard walking to opposite ends of the unit, but that's rather de-minimis and so not really relevant)
You cannot seriously be arguing that doing otherwise - reducing the layover - is sensible. Look at where that got LNR and their appallingly unreliable long-distance through services, and Northern's similar issues too.
Regarding platforms, if HS2 goes ahead that gets its own, if HS2 doesn't go ahead there's no line capacity for any more than one more TPH of IC services from Euston - so it can't get worse in that sense (and we'd likely get P17 and 18 back).
And with regard to existing passengers getting priority - yes us - we don't want it, interchange or no! Euston is already well connected and services into it are popular. The Southern service is useful, of course, but it is for through journeys beyond London primarily, it isn't there for people going to London other than a small part of west London and a big shopping arcade.
I'd suggest actually using these services and discussing the use cases and views of passengers who do actually use them; otherwise you're doing little more than being a typical "crayonista" - and from reading your posts in the past you are really rather better than just doing that.
So using a simplified hypothetical example, if you have B as a terminus, and have a route A-B with 15 minutes layover at A and B, and a route B-C with a 15 minute layover at each of B and C, if you turn that into a through service A-B-C you still need 60 minutes total layover, it just has to change into being 30 minutes at each end (or 15 and 45, or whatever).
(Well, you might be able to lop out about 2-3 minutes for the driver and guard walking to opposite ends of the unit, but that's rather de-minimis and so not really relevant)
You cannot seriously be arguing that doing otherwise - reducing the layover - is sensible. Look at where that got LNR and their appallingly unreliable long-distance through services, and Northern's similar issues too.
Regarding platforms, if HS2 goes ahead that gets its own, if HS2 doesn't go ahead there's no line capacity for any more than one more TPH of IC services from Euston - so it can't get worse in that sense (and we'd likely get P17 and 18 back).
And with regard to existing passengers getting priority - yes us - we don't want it, interchange or no! Euston is already well connected and services into it are popular. The Southern service is useful, of course, but it is for through journeys beyond London primarily, it isn't there for people going to London other than a small part of west London and a big shopping arcade.
I'd suggest actually using these services and discussing the use cases and views of passengers who do actually use them; otherwise you're doing little more than being a typical "crayonista" - and from reading your posts in the past you are really rather better than just doing that.
Last edited: