If you are referring to Great Yarmouth I thought that scheme was dead?
Oh yes me too & very much a wilderness it is again to after all the clear up done there. Money seems no object though for storing these units & with the plan slipping who knows, it could figure once again. Be good to see the sidings I spent my youth riding to/from on the 03 pilot return to some form of life.
 

chubs

Member
Joined
30 Oct 2012
Messages
694
How many miles do the new units need to do for acceptance now 2 are in passenger service?

You'd think with the long ongoing DMU shortage and state of the ones that are still limping along they would try and get some more FLIRTS into service and take the short set and the 15x units out of their misery?
 

geoffk

On Moderation
Joined
4 Aug 2010
Messages
3,931
Location
Exeter
Right, now I have just popped my cherry by actually travelling on a Stadler in this country. Ironic as I'm supposed to be driving them I am still no nearer stepping into any cab other than the simulator :lol:

Impressed is an understatement. They are most certainly the best of all the new trains introduced in the UK In the last couple of years. The only of these I have yet to sample are the 385s North of the border & MK5 Slep vehicles. Acceleration (in diesel mode) was excellent as was the ride & seat comfort. Can't wait to thrash a 3-car in pan-up :p PIS was very informative too. If I had to make a slight criticism it would be the brightness of interior lighting & the loudness of the door release alarm but these are industry standards & re quirements for PRM. They are almost too good for us East Anglians as we are not normally top of the tree when it comes to new trains. I have to keep pinching myself.
Where will the 755s be running on electric power?
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,866
Location
East Anglia
How many miles do the new units need to do for acceptance now 2 are in passenger service?

You'd think with the long ongoing DMU shortage and state of the ones that are still limping along they would try and get some more FLIRTS into service and take the short set and the 15x units out of their misery?
It's going as intensively as is possible but apart from testing the training is a mammoth task too. At Norwich every available driver wishing to work rest days is doing so & still there have been as many as eleven turns uncovered daily with the Shift Traincrew Managers doing a stirling job to keep everything running. People don't realise what's going on behind the scenes.
 

fat_boy_pete

Member
Joined
16 Mar 2015
Messages
365
Location
Essex
But this with the Bridge and the weight of a train , I'm not totally familiar with exactly what trains are what in the Stadler fleet , Eg the units that appear to have only four cars

Sudbury line is planned to only have the 755/3 units operating on it, e.g 3 short carriages and a power unit. That 62 metre long train is as long as it can support without extensive additional infrastructure works and will still be longer than any existing service at a current maximum of 40 metres in length.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,808
It's going as intensively as is possible but apart from testing the training is a mammoth task too. At Norwich every available driver wishing to work rest days is doing so & still there have been as many as eleven turns uncovered daily with the Shift Traincrew Managers doing a stirling job to keep everything running. People don't realise what's going on behind the scenes.
Sounds like a recipe for chaos. Another TOC where every member of train crew needs training on new traction in a short period, with a stupidly optimistic view taken as to how it will be achieved. Echos of the GWR fiasco last year.
 

chubs

Member
Joined
30 Oct 2012
Messages
694
It's going as intensively as is possible but apart from testing the training is a mammoth task too. At Norwich every available driver wishing to work rest days is doing so & still there have been as many as eleven turns uncovered daily with the Shift Traincrew Managers doing a stirling job to keep everything running. People don't realise what's going on behind the scenes.

Ah fair enough, looking forward to seeing more units about soon.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,866
Location
East Anglia
Sounds like a recipe for chaos. Another TOC where every member of train crew needs training on new traction in a short period, with a stupidly optimistic view taken as to how it will be achieved. Echos of the GWR fiasco last year.
No service cancellations this end though & there are still next to call drivers with phones on & available for Sunday turns ;)
 

TheEdge

Established Member
Joined
29 Nov 2012
Messages
4,498
Location
Norwich
Ah fair enough, looking forward to seeing more units about soon.

What will probably happen suddenly in the next couple of months is we will hit a critical mass of trained crews and they will suddenly just appear everywhere
 

delticdave

Member
Joined
13 Apr 2017
Messages
450
Location
Essex UK
Sudbury line is planned to only have the 755/3 units operating on it, e.g 3 short carriages and a power unit. That 62 metre long train is as long as it can support without extensive additional infrastructure works and will still be longer than any existing service at a current maximum of 40 metres in length.

Surely the 156 units are longer than 20 metres, the Marsden book quotes 23.03M for each car.
 
Joined
10 Mar 2015
Messages
771
Surely the 156 units are longer than 20 metres, the Marsden book quotes 23.03M for each car.

It is less the overall length that is the issue, more the door positioning. The Flirts are longer, but their more central door position reduces required platform space significantly. Front door to rear door, a four car flirt is only about 2m longer than a 3 car 170.
 

stonojnr

Member
Joined
17 Apr 2019
Messages
33
maybe the PIS needs abit more work before it spreads out further across all the routes, as caught 755417 paying a visit to Ipswich last week,which seemed convinced it was heading back to Norwich calling at Newmarket, Stowmarket... who knows maybe it was but I suspect it really meant Needham Market :)
 

MrPIC

Member
Joined
30 May 2015
Messages
426
nothing on the horizon yet for the EMU flirts on Stansted Exp or Norwich-London?
 