• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Thameslink Programme, South Central & South Eastern area fleet cascades etc

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

philjo

Established Member
Joined
9 Jun 2009
Messages
3,019
http://news.bbc.co.uk/1/hi/england/beds/bucks/herts/8549198.stm
Bloody hell, the BBC should have put this up as "Breaking News" :D

They did on my PC, but only because I have got the BBC news alerts installed on my PC & set to show new stories relating to Beds Herts & Bucks.

The clip on the website is about half the length that showed on the Look East programme this evening on BBC1.

They say that there is another feature tomorrow's programme on the rebuilding plans.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,913
Location
UK
By the speed at which the BBC has found out about the TL project, it will probably be about the class 377 trains FCC has 'just' got. ;)

(Yes, I know the trains were in the video today!)
 

DjU

Member
Joined
12 Jul 2009
Messages
254
Location
Essex
it will probably be about the class 377 trains FCC has 'just' got. ;)

Speaking of which, 377504 (ones of the ones that had to go back to be 'finished') should now be back down south - at Selhurst at the moment to be specific.

In couple of days and bar a couple of Vinyls the full fleet will be available - and this time none have to bugger off to be put right - albeit 1 whole year late Hurrah!
 

philjo

Established Member
Joined
9 Jun 2009
Messages
3,019

Bedpan

Established Member
Joined
4 Feb 2010
Messages
1,299
Location
Harpenden
I think the link must show the most recent weekday Look East when I saw it just now it showed exactly the same clip as that posted by Edvid on Thursday. I liked the introduction from the studio though "and when its completed it will link Bedford and Luton with London and the South Coast" (with Bedford, Luton, London and Brighton joined by a blue line on an accompanying map). So, then, that means I'll be able to travel all the way from Harpenden to London and even Brighton on the same train!!

Not as good though as the lady Three Counties sent to Bedford during the drivers dispute to see how long it took her to get back to Luton. She reported that she was freezing col;d and there was no train south from Bedford for half and hour although there were trains to places to the north, like Sheffield and Rochester , which were no good to her. Suggest she takes an atlas if not a timetable if she goes again!!:lol:
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,913
Location
UK
Wow, they're going to run trains from Bedford and Luton to places like Brighton?

Won't they need to build some sort of magical tunnel through the 'core' of London? Oh, that must be what they're building right now.

This TL project is really going to be something when it's done! I am so grateful to the BBC for making me aware of this service coming in the future.
 

royaloak

Established Member
Joined
11 Oct 2009
Messages
1,389
Location
today I will mostly be at home decorating
It will never happen, I mean maybe they should have done something like this last century. Maybe they could have used 2000 in the title and as it links the north and south and goes under the Thames it could be called "2000linkThames", just a thought or am I being backwards! :lol:
 

Drsatan

Established Member
Joined
24 Aug 2009
Messages
1,887
Location
Land of the Sprinters
It will never happen, I mean maybe they should have done something like this last century. Maybe they could have used 2000 in the title and as it links the north and south and goes under the Thames it could be called "2000linkThames", just a thought or am I being backwards! :lol:

Well said! The '2000' moniker wasn't dropped until 2002 IMO, so the DafT/SRA, like the BBC, was slow to realise that the Thameslink project existed!
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
I know how you feel, some of our Metrolink expansion lines that will now all be completed by 2016 were originally called Metrolink 2000 and expected to be complete between 2000-2002 as well :)
 

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
It appears that the replacement bridges for Luton station are being fabricated on the worksite for the new multi-story carpark.

Things are gaining momentum :).
 
Last edited:

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,521
Speaking of the new car park, it does seem to have made good progress over the last few months. I've also found a couple of TL articles for your delectation:

Additional Blackfriars rib arches installed
REVEALED: FIRST GLIMPSE OF NEW STATION FOR BEDFORD
--- old post above --- --- new post below ---
Yikes - the New Civil Engineer website (on which the Blackfriars article is shown) will require a £99/year subscription to access from midnight, so download the content while you can!
 

mackenzie_blu

Member
Joined
14 Nov 2008
Messages
493
Location
Zone 3 - Northern Line
Well said! The '2000' moniker wasn't dropped until 2002 IMO, so the DafT/SRA, like the BBC, was slow to realise that the Thameslink project existed!

Funny' I was reading something printed in 2010 stating the "Thameslink 2000 Project" so not quite dead yet (likely to be a legal thing as some stuff was ok under that name).
 
Joined
15 Jul 2007
Messages
104
Location
Canada
Blimey, it seems like ages since I heard about this...
Just a quick question; there is a new junction that's linking the Thameslink line with the ECML, what is it named?

I'll continue reading to find out the latest news...
 

bnsf734

Member
Joined
15 Oct 2007
Messages
648
Location
Nuneaton
According to my new Track atlas the other end is now named Copenhagen Junction. I think it was previously Freight Terminal Junction, but dont have the map handy at work!

Calv
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,521

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
To be pedantic there is a lift on Station Road. ;) Incidentally, there was a Parliamentary debate on the station yesterday (see columns 62-68WH):
http://www.publications.parliament.uk/pa/cm200910/cmhansrd/cm100323/halltext/100323h0010.htm
http://www.publications.parliament.uk/pa/cm200910/cmhansrd/cm100323/halltext/100323h0011.htm


Which LBC have been putting in and out of order :D. Up until last week it was completely liftless/devoid of technology.

Is it me or did Chris Mole basically patronise and disregard what was said?
 
Last edited:

DVT82305

Member
Joined
3 Dec 2009
Messages
60
Does anyone know if the model of the Desiro City is still at Scott's Restaurant in Mayfair in London?
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,504
Location
DTOS A or B
abit of work went on over the easter holidays;

@ luton two bridges were replaced, and the up slow line has been slewed.
The north end loop no longer exist's, as well as the old paper dock has been disconected and removed.

@ farringdon the signalling has changed hands, all southbound signals are now under the control of victoria, and northbound is still west hampstead, also a tower block has been demolished.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Pardon for asking but was the north end loop at Luton used to stable terminators before they went back into service if so what happens now to the terminators?

Might seem daft but I don't travel often on the TL route.
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,504
Location
DTOS A or B
Ajax some 8 car terminators would split , 4 would go back to sutton/7oaks, and the other 4 would go into the loop and wait 30/40 minutes until another 4 car came in from sutton/7oaks then couple up.
Now they are running empties to bedford, straight turn round and back to luton, als some are shunting across leagrave junction.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Ajax some 8 car terminators would split , 4 would go back to sutton/7oaks, and the other 4 would go into the loop and wait 30/40 minutes until another 4 car came in from sutton/7oaks then couple up.
Now they are running empties to bedford, straight turn round and back to luton, als some are shunting across leagrave junction.

Ah, I see thanks for explaining that. There wouldn't be any plans to reinstall the loop at a later date would there or would they permanently be heading to Bedford to turnround?
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,504
Location
DTOS A or B
Not sure if the loop will be reinstated as the platforms are being extended north to accomodate 12 cars.

I would imagion there will be new workings at the timetable change.
 

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
I've also noticed on the stretch between Luton and Luton Airport Parkway (behind Power Court) there have been trees removed.

Have any buildings been removed too? I find it hard to tell, as I'm usually on the train and only noticed recently while going down Church Street.
 
Status
Not open for further replies.

Top