HSTEd
Veteran Member
- Joined
- 14 Jul 2011
- Messages
- 20,319
The trainsets are going to be expensive, either newbuilds or conversions of the ex Caledonian Sleeper stock to meet all the disability and other requirements.The cost of this sleeper service would be a tiny fraction of the required capital expenditure to achieve a shorter and substantially faster FNL.
It's going to quite a lot of money.
And it is certainly more expensive than just paying for additional flights from the Central Belt airport of your choice to Wick.
It is going to take quite a while to set up given that the rolling stock is likely unusable from December.Perhaps more importantly, it is because of circumstances deliverable in the short term. Even if a huge financial commitment was made this year to modernise and shorten the FNL, it would take many years to deliver it.
I’m not sold on a Dornoch Firth rail crossing - if you cut out the Lairg Loop you cut off the railhead for NW Sutherland. It would only be politically acceptable if at least the Southern section of the loop was retained, with commuter services to Inverness running to/from a Lairg terminus.
THe easiest way is not to close any of it and simply detach two cars from the train at the southern end of the loop and run that the long way around.
The most cost effective way of making the FNL more useful is probably an upgrade with tilting trains and MTBs to improve linespeeds.
! Yes it would leave at Inverness at 02:54 but arriving into Inverness at 07:42 with plenty of time to see John O Groats and visit literally the most northern point in the UK (British Isles) is at the moment much more preferable than catching the 07:00 from Inverness to Thurso and having just enough time to visit the top of the UK and then catch the 16:30ish back!