Thats interesting, so what exactly is the EC HST doing at the moment?
A diesel train all that way - totally under the wires, and it's not the only one!
Remind me, why are we bothering to wire up more lines again when we can't even use electric trains on wired routes?
According to the guys at Northern Railways, it's in place until the 12th March as it's to cover for a unavailable East Coast HST.
http://northernrailways.co.uk/forum/viewtopic.php?f=13&t=5926
East Coast is hiring an HST set from Cross Country trains for around 6 weeks due to the IEP project requiring us of one of the exisiting East Coast HST's in connection with development of the new train. The HST is being hired to allow East Coast to run its advertised services.
Diagrams will be as follows
Mon- Fri:
0900 NCL to KX
1310 KGX to LDS
1605 LDS to KGX
1900 KGX to NCl ( EDB on Fridays)
Saturdays :
Set at depot for maintenance
Sundays:
1300 EDB to KGX
1900 KGX to NCL
The train will be formed with the spare EC buffet car and a spare EC 1st class coach to provide a tad of normality, with reservations etc
Suggests that whatever purpose they need it for is cosmetic, i.e. to do with either the livery or interior, otherwise they could use the XC HST for the non-service use. But what could it be??
Its probably not a full set because XC have shorter HSTs
It isnt a full set, or at least it wasnt last week. The EC stock is at Wabtec, or again, it was last week.
[youtube]Fyj-C58acZQ[/youtube]
as I understand it, it's covering for an electric set whilst they trial a rake of mark 4s with a 91 at both ends, to simulate the proposed configuration of the Super Express. Yes, trains in other countries run with multiple pans up just as fast and even faster (Japanese shinkansen can often have four pans up on coupled sets) but the East Coast wiring is "special".
Why do we have diesels under wires? Because we have the diesels (built before the wires), and we haven't built enough electrics.

I'm slightly confused then, because a note has been put up in the mess room at Kings Cross today saying that the hired-in set goes back this Friday.East Coast have hired that HST set till 10th May according to a brief issued to XC staff two weeks ago.
I'm slightly confused then, because a note has been put up in the mess room at Kings Cross today saying that the hired-in set goes back this Friday.
This news has been received with pleasure by the crews that work it, on account of the many faults in the hybrid set of XC+EC+unrefurbed NXEC coaches and Power cars which has led to it being despised by crews.
Yes. I think so too.I though NXEC finished off the Mallard program?
I though NXEC finished off the Mallard program?
I've heard its substituting for a Mark4 set as there's a backlog of maintenance?