My example is from Thursday 28th March.
As many people know, the fast from King's Cross to Sunderland is often at least a little late, and on this occasion it departed 1 minute after the 2003 stopping service to Leeds, the trains were on adjacent lines out of King's Cross and it is understandable that both were given proceed aspects out of their respective platforms. But it would have seemed a good choice to route the 2000 ahead at Belle Isle, but it appears the decision was already made to route the 2003 onto the Down Fast ahead of the 2000.
But then at Peterborough there was an opportunity to correct the situation which was missed. The 2000 was brought to a stand on the fast line, to allow the 2003 a right time departure from Platform 4 onto the fast line.
The 2000 was also brought to a stand at Newark North Gate as the 2003 sat in the platform for three minutes.
The 2000 eventually was was able to overtake 2003 at Doncaster, by which time it was 17 minutes late, having incurred an additional 12 minutes of delay.
Surely LNER themselves would not have chosen for this regulation to occur? I understand the entire delay to the 2000 was put down to the late start, with no attribution for regulation whatsoever.
Is there anyone to whom Network Rail is actually truly accountable for such decisions, or are they able to decide on behalf of an operator that one of their trains will be doomed to fail PPM instead of attaining a pragmatic, sensible outcome where both trains achieve PPM?
http://www.realtimetrains.co.uk/train/Y70200/2019/03/28/advanced
http://www.realtimetrains.co.uk/train/Y70310/2019/03/28/advanced
As many people know, the fast from King's Cross to Sunderland is often at least a little late, and on this occasion it departed 1 minute after the 2003 stopping service to Leeds, the trains were on adjacent lines out of King's Cross and it is understandable that both were given proceed aspects out of their respective platforms. But it would have seemed a good choice to route the 2000 ahead at Belle Isle, but it appears the decision was already made to route the 2003 onto the Down Fast ahead of the 2000.
But then at Peterborough there was an opportunity to correct the situation which was missed. The 2000 was brought to a stand on the fast line, to allow the 2003 a right time departure from Platform 4 onto the fast line.
The 2000 was also brought to a stand at Newark North Gate as the 2003 sat in the platform for three minutes.
The 2000 eventually was was able to overtake 2003 at Doncaster, by which time it was 17 minutes late, having incurred an additional 12 minutes of delay.
Surely LNER themselves would not have chosen for this regulation to occur? I understand the entire delay to the 2000 was put down to the late start, with no attribution for regulation whatsoever.
Is there anyone to whom Network Rail is actually truly accountable for such decisions, or are they able to decide on behalf of an operator that one of their trains will be doomed to fail PPM instead of attaining a pragmatic, sensible outcome where both trains achieve PPM?
http://www.realtimetrains.co.uk/train/Y70200/2019/03/28/advanced
http://www.realtimetrains.co.uk/train/Y70310/2019/03/28/advanced