Back in 1985 British Rail was still simplifying junctions and removing surplus tracks as the momentum of rail decline had still to be arrested, or the pendulum had not yet been perceived to be going the other way. When Railtrack arrived in 1994 it was into a fragmenting railway of TOCs and some seriously fragmenting infrastructure.
I recall my days train spotting on Newcastle Central station in the late 1950s, below the castle with the wonderful diamond crossovers in between. They must have been a nightmare to keep in good order. It's so much simpler today and much the same was happening across the country. My first visit to Leeds was in the days when there seemed to be many more platforms running up beside the Aire where there are now shops and car parks to the north side .
I say 1985 for the reason that my local station was reduced from a former junction of 4 platforms (2 already disused) to one and the main line between Sheffield and Manchester reduced to single track for over half a mile through the station - very much a British Rail decision. By 1994 Railtrack knew very well that a problem bottleneck had been created and were preparing plans to redouble the line. I've heard it said that there were plans on Railtrack's office walls to do that very soon after they were formed. By 2005 Network Rail had made an application to Sheffield City Council regarding rebuilding a second track and platform. If we're lucky work may start in 2021*.
Does this have anything to do with Stagecoach pulling out? Not directly, but having to operate the Liverpool - Norwich service through the outskirts of Liverpool, then the notorious Castlefield/Platforms 13 & 14 section, then the Dore Junctions and station before getting even half way may help to make the point. That service alone is responsible for 25% of East Midlands delays on all trains! The Hope Valley stations are all among the worst 100 of over 2500 in Britain for the punctuality of trains.
There is a paralysis of joined up thinking that nationalisation, sectorisation, or privatisation can't in themselves ever resolve. One of the biggest issues may be that too few people stay long enough in their jobs or with one company to fully understand them, but maybe more importantly understand where everything fits in to the national jigsaw.
Throw in pensions, future open access operators and targets to go electric without enough wires and who in their right mind would want to spend millions preparing a semi-coherent bid on which to make a profit?
Offering a reasonably long term rolling management contract with all the variable risks identified and coverable to all but guarantee profits and it might be another story. It's going to be interesting to see how the next 5-10 years pan out.
Despite all the doom and gloom with late, cancelled, overcrowded and slow trains, my local station has grown passenger numbers over 5 times since reduced to one platform. It's doubled in the last 8 years (when the most recent plans were being formulated - on a growth forecast of 56% by 2025). Further growth is challenging whoever is managing it all.
*Network Rail Manchester is responsible for redoubling by December 2022. Network Rail at York are responsible for maintenance and operations of the tracks through the station. Left hands and right hands, but who's ultimately pulling who's strings? DfT!